OPERATING DATA REPORT DOCKET NO. 50-102 DATE 1/4 /84 COMPLETED BY n nenknm TELEPHONE (904) 795.-3802 OPERATING STATUS
- 1. UrJt Name:
Crystal River Unit 3 N05 12/1/83 - 12/31/83 2 Reporting Period:
2544
- 3. Licensed Thermal Power (MWt):
890
- 4. Nameplate Rating (Gross Mhe):
825
- 5. Design Electrical Rating (Net MWe):
850
- 6. Maximum Dependable Capacity (Gross MWe):
8II
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To which Restricted. If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr..to.Date Cun:ulatise 744 8760 59640 i1. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 744 5362 37569.2
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On.Line 733.2 5152.1 36619
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1768273 11439380 81964335
- 17. Gross Electrical Energy Generated (MWH) 618683_,,
3960119 27926736
- 18. Net Electrical Energy Generated (MWH) 590175 1772201 26517081
- 19. Unit Service Factor 98.5%
58.8%
61.4%
58.5%
58.8%
61.4%
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 97.8%
53.1%
56.3%
96.2%
52.2%
53.9%
- 32. Unit Capacity FactorIUsing DER Net)
- 23. Unit Forced Outage Rate 1.5Y 1.67 21.57
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each t:
Nnno
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY l/14/77 4
INITI A L ELECTRICITY I/30/77 COMMERCIAL OPER ATION 3/13/77 kDN O!
O gyj77, 4, R
7 AVERAGE DAILY UNIT POWER LEVEL t
DOCKET NO.
50-302 UNIT FLCRP-3 DATE 1/4/84 D. Graham COMPLETED BY TELEPHONE (904) 795-3802 MONTH December 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY power LEVEL (MWe Neti iMWe. Net )
I 859 17 859 850 846 2
gg 3
8A5 19 866 4
845 20 826 852 5
858 21 858 866 6
3, 7
AAC 23 825 g
843 24 875 817 862 25 9
009 10 777 11 825 2;
211 605 579 12
,g 622 13 29 758 826 14 717 30 821 856 3,
15 846 16
-s INSTRUCTIONS On this format.hst the aserage dail> unit power lesel m ilWe Net for each day in the reportine m.. nth. Compute to the nearest whole megawatt.
m '77 )
.m DOCKET NO.
50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNil'NAME FTI'RP-3 DATE 1/A/RA COMPLETED BY D_
FfalAa REPORT MON Tlg 12/83 TELEPHONE (904) 795-3802 "k
5
=
en 3w 2 _:c p
p E.4 I s.cernee g-t, 5%
Cause & Corrective 1).ete g
3g 4
jgy E ent
=?
E~$
Action to c5 3 E
j5C Repott "
'$ 0 Present Recurrence 6
83-34 831211 S
37.7 B
N/A N/A HC HTEXCH Reduced power to clean condenser l
tubes.
\\
83-35 831226 F
10.8 A
N/A N/A HF HTEXCH Extreme cold weather caused an influx of fish into the circulating water l
system which resulted in a failure of the traveling screens. Turbine was taken out of service.
83-36 831226 F
68.3 B
N/A N/A HC HTEXCH Reduced power to clean condenser tubes following large influx of fish.
l
.I 4
1 2
Method; Esinbit G Instruciions I: forced Reason:
I Manual for Picpasation of Data S: Stheduled A l quipment Failure (Explain)
B-Maintenance of Test 2-Manual Scram.
Entr> Sheets foi Licensee 1 Aianmatic Sesam.
Esent Rep nl 11.1 Rll' ele INilRI G.
C-Refueling 4 Other it:xpl.nn)
Ol t>I i D-Regulator) Restriction 1 -Operator 1rainm3& lacense ITamination 5
I - Adina tiest ratise I %Inhil ! - SJme Soutte G-OperJttonJI I trol (I %plJud p /77) ll Othei lliplaini
e HONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50402 UNIT FLCRP-1 DATE 1/4/84 COMPLETED BY D. Fields TELEPHONE (904) 795-3802 MONTH December 1983 The unit operated at or near full capacity for the entire
SUMMARY
STATEMENT:
month. Extreme cold weather and a resultant influx of fish forced the turbine off-line for an eleven hour period. There were no scrams or reactor shutdowns for the month.
i e
e h
cae
}
t January 9,1984 3F0184-12 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Mr. DeYoung:
Attached are twelve (12) copies of the Crystal River Unit 3 December 1983 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.
Sincerely,
/
/
G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEFijcf Attachments cc:
Mr. J.P. O'Reilly Regional Administrator, Region 11 Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303 4
7 1
1 \\
GENERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151