Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217K8901999-10-18018 October 1999 TS Change Request NPF-38-224 for License NPF-38,modifying TS 3.6.2.2 LCO to Allow Plant to Operate with Two Independent Trains of Containment Cooling,Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20210M9761999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One HPSI Train Inoperable & TS 3.5.3 to Change end-state to Hot Shutdown with at Least One Operable Shutdown in Operation ML20210M9601999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One LPSI Train Inoperable & Allowed Outage Time of 72 Hours Imposed for Other Conditions ML20210H1401999-07-29029 July 1999 TS Change Request NPF-38-220 to License NPF-38,modifying TS 3.8.1.1 & Associated Bases by Extending EDG Allowed AOT from 72 H to Ten Days ML20210H2091999-07-29029 July 1999 TS Change Request NPF-38-221 to License NPF-38,modifying TS 3.6.2.1 to Extend Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3181999-07-19019 July 1999 TS Change Request NPF-38-219 for License NPF-38,modifying TS 4.5.2.f.2 by Increasing Performance Requirement for LPSI Pumps ML20210D0831999-07-15015 July 1999 TS Change Request NPF-38-216 to License NPF-38,adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20210D0341999-07-15015 July 1999 TS Change Request NPF-38-217 to License NPF-38,creating New TS for Feedwater Isolation Valves to Ts.Unreviewed Safety Question Re Crediting of Rt Override Feature & AFW Pump High Discharge Pressure Trip,Provided ML20209H3051999-07-15015 July 1999 Application for Amend to License NPF-38 to Modify TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 Efpy.Proprietary Rept 51-1234900-00 Encl.Proprietary Encl Withheld,Per 10CFR2.790 ML20195B1771999-05-20020 May 1999 Application for Amend to License NPF-38 to Change TS Bases B 3/4.3.1 & 3/4.3.2,B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20198G2311998-12-23023 December 1998 Application for Amend to License NPF-38,modifying LCO for TS 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20154E1011998-10-0101 October 1998 Tech Spec Change Request NPF-38-211 to License NPF-38, Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20153D5571998-09-23023 September 1998 Emergency TS Change Request NPF-38-210 to License NPF-38, Addressing Functional Requirements of 10-4% Bistable of Rps. TS Change Request NPF-38-21 Replaces 980918 Request Entirely ML20153B4381998-09-18018 September 1998 Emergency Application for Amend to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints & Table 3.3-1 Re Reactor Protective Instrumentation.Application Supersedes 980911 Submittal ML20151W5791998-09-11011 September 1998 TS Change Request NPF-38-210 to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7901998-08-12012 August 1998 Application for Amend to License NPF-38,increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7281998-07-29029 July 1998 Application for Amend to License NPF-38 to Revise TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model.Request Associated W/Methodology Used to Obtain SBLOCA Results ML20249C7861998-06-29029 June 1998 TS Change Request NPF-38-205 to License NPF-38,modifying TS 3.3.3.7.1, Chlorine Detection Sys & TS 3.3.3.7.3, Broad Range Gas Detection & Associated Bases ML20249C8301998-06-29029 June 1998 Application for Amend to License NPF-38,revising Control Room Ventilation TS to Be More Consistent w/NUREG-1432 ML20248B7441998-05-28028 May 1998 Application for Amend to License NPF-38 to Change TS 3.7.1.2,surveillance Requirement 4.7.1.2 & Bases Change for Emergency Feedwater Sys ML20217D4921998-03-25025 March 1998 Rev 1 to 960718 TS Change Request NPF-38-177 to License NPF-38,correcting Discrepancy in Original Submittal & Incorporating Addl Changes to Improve Clarity of TS 3.9.8.1 & TS 3.9.8.2 ML20199A1031997-11-13013 November 1997 TS Change Request NPF-38-202 to License NPF-38,modifying TS 6.8.4.a, Primary Coolant Sources Outside Containment, to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217G2351997-10-0707 October 1997 Application for Amend to License NPF-38,modifying TS 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8091997-09-25025 September 1997 Application for Amend to License NPF-38,modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G6951997-07-0707 July 1997 Application for Amend to License NPF-38,supplementing TS Change Request NPF-38-179 by Modifying Value Previously Submitted to Prevent Vortexing & Value for Short Term Requirements of CCW Makeup Sys & Expand Applicability of TS ML20141D8471997-06-26026 June 1997 Application for Amend to License NPF-38,revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases ML20148G6221997-06-0303 June 1997 Suppl to 960717 TS Change Request NPF-38-179,providing Updated Info Based on Min Required Level in Condensate Storage Pool.Attachment a Contains Original Vortexing Calculation & Attachment B Contains Revised Calculation ML20140B1591997-06-0303 June 1997 Application for Amend to License NPF-38,consisting of TS Change Request NPF-38-108,revising Action Requirements for TS 3/4.3.2 for Safety Injection Sys Sump RAS ML20141K1911997-05-24024 May 1997 TS Change Request NPF-38-197 to License NPF-38,modifying TS 3/4.7.4 Re Ultimate Heat Sink,Table 3.7-3 by Incorporating More Restrictive Dry Cooling Tower Fan Requirements & Changes Wet Cooling Tower Water Consumption in TS Bases ML20141K1611997-05-24024 May 1997 TS Change Request NPF-38-196 to License NPF-38,modifying Specifications 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1-1 by Removing Cycle Dependent Boron Concentration & Boration Flow Rate from Action Statements ML20137T4251997-04-11011 April 1997 Application for Amend to License NPF-38,deleting TS 3.7.1.3, Action (B) & Associated Surveillance Requirement ML20137T4451997-04-11011 April 1997 Application for Amend to License NPF-38,making TS 3.6.2.2 & Surveillance Requirement 4.6.2.2 Consistent W/Containment Cooling Assumptions in Waterford 3 Containment Analysis ML20137T3971997-04-11011 April 1997 Application for Amend to License NPF-38-195,modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20137P2561997-04-0707 April 1997 Application for Amend to License NPF-38,deleting TS 4.8.1.1.2a.7 & Incorporating 184 Day Fast Start Test Requirement as 4.8.1.1.2d,renumber Subsequent Requirements & Adding Footnote as Indicated ML20137G4711997-03-27027 March 1997 TS Change Request NPF-38-192 to License NPF-38,modifing TS 3/4.5.2, ECCS Subsystems Modes 1,2 & 3 ML20137F9201997-03-27027 March 1997 TS Change Request NPF-38-191 to License NPF-38,modifying TS Surveillance Requirements 4.5.2.d.3 & 4.5.2.d.4 Re Granular Trisodium Phosphate Dodecahydrate ML20137G2021997-03-27027 March 1997 Application for Amend to License NPF-38,increasing SFP Storage Capacity & Increasing Maximum Fuel Enrichment from 4.9 W/O to 5.0 W/O U-235.Proprietary & Nonproprietary Repts HI-971628 Encl.Proprietary Rept Withheld ML20134F7091997-02-0505 February 1997 Application for Amend to License NPF-38,requesting to Increase Minimum Boron Concentration in Safety Injection Tanks & Refueling Water Storage Pool to 2050 Ppm ML20135A7661996-12-0202 December 1996 Application for Amend to License NPF-38,permitting Use of 10CFR50,App J,Option B Re performance-based Containment Leakage Testing for Type A,B & C Leak Rate Testing ML20134L6771996-11-18018 November 1996 Application for Amend to License NPF-38,requesting Rev to Change Testing Requirement for Shutdown Cooling Sys Suction Line Relief Valves to Test in Accordance W/Ts 4.0.5 ML20134L1901996-11-15015 November 1996 Application for Amend to License NPF-38,requesting Revision to Scope of Limiting Condition for Operation 3.6.3 Re Containment Isolation ML20128Q1661996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 185,expanding Applicability for CPC Operability & Allowing for Application of Cycle Independent Shape Annealing Matrix ML20128Q2221996-10-16016 October 1996 Application for Amend to License NPF-38,requesting That Change Request 182,permit Use of 10CFR50,App J,Option B, Performance-Based Containment Leakage Testing ML20128Q1871996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 183,extending Allowable Time for Core Operating Limit Supervisory Sys OOS by Monitoring for Adverse Trends ML20128Q2091996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 186,relocating Certain Adminstrative Controls to QA Program Manual & Changing Shift Coverage from 8 H day,40 H Wks to Option of 8 or 12 H Days & Nominal 40 H Wks ML20116B0461996-07-25025 July 1996 Application for Amend to License NPF-38,modifying TS 3/4.7.4 Ultimate Heat Sink by Incorporating More Restrictive Fan Operability Requirements & Lower Basin Temp ML20115G5071996-07-18018 July 1996 Application for Amend to License NPF-38,revising TS 3.9.8.1, Shutdown Cooling & Coolant Circulation High Water Level & TS 3.9.8.2, Shutdown Coolant Circulation Low Water Level ML20116D0071996-07-17017 July 1996 Application for Amend to License NPF-38,consisting of Change Request 174,extending Surveillance Interval for Rtbs from Monthly to Quarterly & Increasing AOT for Operation W/Inoperable Rtb from One H to Two H ML20115G2811996-07-17017 July 1996 Application for Amend to License NPF-38,reflecting That Name La Power & Light Co Has Been Changed to Entergy Louisiana,Inc ML20115G4901996-07-17017 July 1996 Application for Amend to License NPF-38,modifying Spec 3/4.7.1.3 Condensate Storage Pool by Increasing Minimum Required Contained Water Vol from 82% to 91% Indicated Level 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217K8901999-10-18018 October 1999 TS Change Request NPF-38-224 for License NPF-38,modifying TS 3.6.2.2 LCO to Allow Plant to Operate with Two Independent Trains of Containment Cooling,Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20210M9761999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One HPSI Train Inoperable & TS 3.5.3 to Change end-state to Hot Shutdown with at Least One Operable Shutdown in Operation ML20210M9601999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One LPSI Train Inoperable & Allowed Outage Time of 72 Hours Imposed for Other Conditions ML20210H1401999-07-29029 July 1999 TS Change Request NPF-38-220 to License NPF-38,modifying TS 3.8.1.1 & Associated Bases by Extending EDG Allowed AOT from 72 H to Ten Days ML20210H2091999-07-29029 July 1999 TS Change Request NPF-38-221 to License NPF-38,modifying TS 3.6.2.1 to Extend Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3181999-07-19019 July 1999 TS Change Request NPF-38-219 for License NPF-38,modifying TS 4.5.2.f.2 by Increasing Performance Requirement for LPSI Pumps ML20210D0831999-07-15015 July 1999 TS Change Request NPF-38-216 to License NPF-38,adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20210D0341999-07-15015 July 1999 TS Change Request NPF-38-217 to License NPF-38,creating New TS for Feedwater Isolation Valves to Ts.Unreviewed Safety Question Re Crediting of Rt Override Feature & AFW Pump High Discharge Pressure Trip,Provided ML20209H3051999-07-15015 July 1999 Application for Amend to License NPF-38 to Modify TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 Efpy.Proprietary Rept 51-1234900-00 Encl.Proprietary Encl Withheld,Per 10CFR2.790 ML20195B1771999-05-20020 May 1999 Application for Amend to License NPF-38 to Change TS Bases B 3/4.3.1 & 3/4.3.2,B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20198G2311998-12-23023 December 1998 Application for Amend to License NPF-38,modifying LCO for TS 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20154E1011998-10-0101 October 1998 Tech Spec Change Request NPF-38-211 to License NPF-38, Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20153D5571998-09-23023 September 1998 Emergency TS Change Request NPF-38-210 to License NPF-38, Addressing Functional Requirements of 10-4% Bistable of Rps. TS Change Request NPF-38-21 Replaces 980918 Request Entirely ML20153B4381998-09-18018 September 1998 Emergency Application for Amend to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints & Table 3.3-1 Re Reactor Protective Instrumentation.Application Supersedes 980911 Submittal ML20151W5791998-09-11011 September 1998 TS Change Request NPF-38-210 to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7901998-08-12012 August 1998 Application for Amend to License NPF-38,increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7281998-07-29029 July 1998 Application for Amend to License NPF-38 to Revise TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model.Request Associated W/Methodology Used to Obtain SBLOCA Results ML20249C8301998-06-29029 June 1998 Application for Amend to License NPF-38,revising Control Room Ventilation TS to Be More Consistent w/NUREG-1432 ML20249C7861998-06-29029 June 1998 TS Change Request NPF-38-205 to License NPF-38,modifying TS 3.3.3.7.1, Chlorine Detection Sys & TS 3.3.3.7.3, Broad Range Gas Detection & Associated Bases ML20248B7441998-05-28028 May 1998 Application for Amend to License NPF-38 to Change TS 3.7.1.2,surveillance Requirement 4.7.1.2 & Bases Change for Emergency Feedwater Sys ML20217D4921998-03-25025 March 1998 Rev 1 to 960718 TS Change Request NPF-38-177 to License NPF-38,correcting Discrepancy in Original Submittal & Incorporating Addl Changes to Improve Clarity of TS 3.9.8.1 & TS 3.9.8.2 ML20199A1031997-11-13013 November 1997 TS Change Request NPF-38-202 to License NPF-38,modifying TS 6.8.4.a, Primary Coolant Sources Outside Containment, to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217G2351997-10-0707 October 1997 Application for Amend to License NPF-38,modifying TS 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8091997-09-25025 September 1997 Application for Amend to License NPF-38,modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G6951997-07-0707 July 1997 Application for Amend to License NPF-38,supplementing TS Change Request NPF-38-179 by Modifying Value Previously Submitted to Prevent Vortexing & Value for Short Term Requirements of CCW Makeup Sys & Expand Applicability of TS ML20141D8471997-06-26026 June 1997 Application for Amend to License NPF-38,revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases ML20148G6221997-06-0303 June 1997 Suppl to 960717 TS Change Request NPF-38-179,providing Updated Info Based on Min Required Level in Condensate Storage Pool.Attachment a Contains Original Vortexing Calculation & Attachment B Contains Revised Calculation ML20140B1591997-06-0303 June 1997 Application for Amend to License NPF-38,consisting of TS Change Request NPF-38-108,revising Action Requirements for TS 3/4.3.2 for Safety Injection Sys Sump RAS ML20141K1911997-05-24024 May 1997 TS Change Request NPF-38-197 to License NPF-38,modifying TS 3/4.7.4 Re Ultimate Heat Sink,Table 3.7-3 by Incorporating More Restrictive Dry Cooling Tower Fan Requirements & Changes Wet Cooling Tower Water Consumption in TS Bases ML20141K1611997-05-24024 May 1997 TS Change Request NPF-38-196 to License NPF-38,modifying Specifications 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1-1 by Removing Cycle Dependent Boron Concentration & Boration Flow Rate from Action Statements ML20137T4251997-04-11011 April 1997 Application for Amend to License NPF-38,deleting TS 3.7.1.3, Action (B) & Associated Surveillance Requirement ML20137T3971997-04-11011 April 1997 Application for Amend to License NPF-38-195,modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20137T4451997-04-11011 April 1997 Application for Amend to License NPF-38,making TS 3.6.2.2 & Surveillance Requirement 4.6.2.2 Consistent W/Containment Cooling Assumptions in Waterford 3 Containment Analysis ML20137P2561997-04-0707 April 1997 Application for Amend to License NPF-38,deleting TS 4.8.1.1.2a.7 & Incorporating 184 Day Fast Start Test Requirement as 4.8.1.1.2d,renumber Subsequent Requirements & Adding Footnote as Indicated ML20137G4711997-03-27027 March 1997 TS Change Request NPF-38-192 to License NPF-38,modifing TS 3/4.5.2, ECCS Subsystems Modes 1,2 & 3 ML20137F9201997-03-27027 March 1997 TS Change Request NPF-38-191 to License NPF-38,modifying TS Surveillance Requirements 4.5.2.d.3 & 4.5.2.d.4 Re Granular Trisodium Phosphate Dodecahydrate ML20137G2021997-03-27027 March 1997 Application for Amend to License NPF-38,increasing SFP Storage Capacity & Increasing Maximum Fuel Enrichment from 4.9 W/O to 5.0 W/O U-235.Proprietary & Nonproprietary Repts HI-971628 Encl.Proprietary Rept Withheld ML20134F7091997-02-0505 February 1997 Application for Amend to License NPF-38,requesting to Increase Minimum Boron Concentration in Safety Injection Tanks & Refueling Water Storage Pool to 2050 Ppm ML20135A7661996-12-0202 December 1996 Application for Amend to License NPF-38,permitting Use of 10CFR50,App J,Option B Re performance-based Containment Leakage Testing for Type A,B & C Leak Rate Testing ML20134L6771996-11-18018 November 1996 Application for Amend to License NPF-38,requesting Rev to Change Testing Requirement for Shutdown Cooling Sys Suction Line Relief Valves to Test in Accordance W/Ts 4.0.5 ML20134L1901996-11-15015 November 1996 Application for Amend to License NPF-38,requesting Revision to Scope of Limiting Condition for Operation 3.6.3 Re Containment Isolation ML20128Q2091996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 186,relocating Certain Adminstrative Controls to QA Program Manual & Changing Shift Coverage from 8 H day,40 H Wks to Option of 8 or 12 H Days & Nominal 40 H Wks ML20128Q2221996-10-16016 October 1996 Application for Amend to License NPF-38,requesting That Change Request 182,permit Use of 10CFR50,App J,Option B, Performance-Based Containment Leakage Testing ML20128Q1871996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 183,extending Allowable Time for Core Operating Limit Supervisory Sys OOS by Monitoring for Adverse Trends ML20128Q1661996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 185,expanding Applicability for CPC Operability & Allowing for Application of Cycle Independent Shape Annealing Matrix ML20116B0461996-07-25025 July 1996 Application for Amend to License NPF-38,modifying TS 3/4.7.4 Ultimate Heat Sink by Incorporating More Restrictive Fan Operability Requirements & Lower Basin Temp ML20115G5071996-07-18018 July 1996 Application for Amend to License NPF-38,revising TS 3.9.8.1, Shutdown Cooling & Coolant Circulation High Water Level & TS 3.9.8.2, Shutdown Coolant Circulation Low Water Level ML20116D0071996-07-17017 July 1996 Application for Amend to License NPF-38,consisting of Change Request 174,extending Surveillance Interval for Rtbs from Monthly to Quarterly & Increasing AOT for Operation W/Inoperable Rtb from One H to Two H ML20115G2811996-07-17017 July 1996 Application for Amend to License NPF-38,reflecting That Name La Power & Light Co Has Been Changed to Entergy Louisiana,Inc ML20115G4901996-07-17017 July 1996 Application for Amend to License NPF-38,modifying Spec 3/4.7.1.3 Condensate Storage Pool by Increasing Minimum Required Contained Water Vol from 82% to 91% Indicated Level 1999-08-04
[Table view] |
Text
.
===ENTERGY ET"e "" " '"*'
Khya LA 70006 075I T.s! 50a 739 %1 Ross P. Barkhurst we Nwee 0;en er y, m t v.! 3 W3F1-95-0066 A4.05 PR May 12, 1995 U.S. Nuclear Regulatory Commission Attn: Document Control Desk i Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Supplement To Technical Specification Change Request NPF-38-145 Gentlemen:
By letter dated November 16, 1993 Waterford 3 proposed the subject Technical Specification Change Request. This submittal supersedes our previous request in its entirety.
This proposed change modifies TS 3/4.6.1.2 by adopting the wording for primary containment integrated leak rate testing that is consistent with the requirements of the Combustion Engineering Improved Standard Technical l Specifications (NUREG 1432). !
l The circumstances surrounding this change do not meet the NRC's criteria for exigent or emergency review. However, this request is directly related !
to our 10CFR50 Appendix J, exemption request dated November 16, 1993. Due to the significant impact on our upcoming refueling outage, we respectfully l request an expeditious review. The Waterford 3 refueling outage is l currently scheduled to begin September 8, 1995.
I 1'i C42 ,
0 9505100267 950512 \\ ,
1 l PDR ADOCK 050003G2 l P PDR l
3 Supplement To Technical Specification Change Request NPF-38-145 W3F1-95-0066 Page 2 May 12, 1995 This proposed change has been evaluated in accordance with 10CFR50.91(a)(1) using criteria in 10CFR50.92(c) and it has been determined that the i proposed change involves no significant hazards considerations. The Plant Operations Review and Safety Review Committees have reviewed and accepted i the proposed change. l 1
Should you have any questions or comments concerning this request, please ,.
contact Paul Caropino at (504)739-6692. !
Very truly yours, i
\Ib R.P. Barkhurst Vice President, Operations Waterford 3 i RPB/PLC/ssf
Attachment:
Affidavit I
NPF-38-145 cc: L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds NRC Resident Inspectors Office Administrator Radiation Protection Division (State of Louisiana)
American Nuclear Insurers
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the matter of )
)
Entergy Operations, Incorporated ) Docket No. 50-382 Waterford 3 Steam Electric Station )
AFFIDAVIT R.P. Barkhurst, being duly sworn, hereby deposes and says that he is Vice President Operations - Waterford 3 of Entergy Operations, Incorporated; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Supplement To Technical Specification Change Request NPF-38-145; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
R.P. Barkhurst Vice President Operations - Waterford 3 STATE OF LOUISIANA )
) ss PARISH OF ST, CHARLES )
Subscribed and sworn to before me, a Notary Public in and for the Parish and State above named this 12 " day of inh 4 , 1995.
_ %kw .
Ch Notary Public My Commission expires R'7" "T .
DESCRIPTION AND SAFETY ANALYSIS OF PROPOSED CHANGE NPF-38-145 The proposed change modifies the surveillance requirements of Technical Specification 3.6.1.2 for containment leakage by removing the specified scheduler criteria for Type A testing. In place of the specific requirements is a requirement to follow the source of this criteria that is 10 CFR 50, Appendix J.
Existina Specification See Attachment A Proposed Specification See Attachment B Eackaround The TS currently require that a set of 3 containment integrated leak (Type A) tests be performed at 40 plus or minus 10 month intervals, during each 10-year service period, with the third test of each set performed during shutdown for the 10-year plant inservice inspection. Appendix J to 10 CFR 50 requires that ,
a Type A test of the containment be performed periodically. These tests are l required to be scheduled as a set of three tests to be performed at I approximately equal intervals during each 10-year service period with the third test to coincide with the shutdown for the 10-year plant inservice inspection. The TS containment leakage rate testing requirements essentially duplicate the requirements of Appendix J; additionally, the TS require the Type A test be performed at 40 plus or minus 10 month intervals. The TS requirement to conduct Type A test at 40 plus or minus 10 month intervals is too restrictive especially for licensees on 18 month fuel cycles. This results in additional licensee amendment applications such as Waterford 3's NPF-38-135 dated May 7, 1993 that resulted in TS Amendment 85. The improved standard technical specifications resolved this problem by removing detailed schedules from the TS and simply requiring compliance with 10 CFR 50, Appendix J, except as modified by approved exemptions. The proposed change proposes to delete the detailed surveillance schedule for the Type A tests and, instead, reference performance of Type A testing in accordance with 10 CFR 50, Appendix J.
This proposed change is similar to NRC approved changes for other licensee facilities e.g., D.C. Cook granted January 5, 1995, Duke Power granted March 9, 1995, Indian Point 2 granted March 17, 1995 and Brunswick Steam Electric Plant granted February 21, 1995.
Description The proposed change modifies surveillance requirements associated with containment leakage TS 3.6.1.2 by removing scheduler requirement for Type A tests to be performed specifically at 40 plus or minus 10 month intervals and, instead, reference Type A testing in accordance with 10 CFR 50, Appendix J.
The proposed change also includes several administrative changes.
TS 4.6.1.2 is reformatted and revised to state that "The containment leakage rates shall be demonstrated as follows." The requirement to perform containment leak rate testing using ANSI N45.4-1972 has been relocated to the Bases. This requirement is also duplicated in appendix J.
The Type A testing requirements previously specified in TS 4.6.1.2 (a), (b),
and (c) are duplicated in Appendix J and, therefore, deleted and replaced with a requirement to perform Type A testing in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions.
The footnote identified by a single asterisk (applicable to Type B and C tests) no longer applies and is deleted. This is purely an administrative change.
The footnote identified by double asterisk is deleted. This footnote involved an approved exception (re; NRC Letter dated August 12,1993) to 10 CFR 50, Appendix J, and will no longer be required under the proposed change.
jiafety Analysis The proposed change described above shall be deemed to involve a significant hazards consideration if there is a positive finding in any of the following areas:
- 1. Will operation of the facility in accordance with this proposed change i involve a significant increase in the probability or consequences of an l accident previously evaluated? i l
Response: No I
The proposed change will not affect the assumptions, design parameters, or results of any accident previously evaluated. The proposed change does not add or modify any existing equipment. The proposed Type A test schedule will continue to be consistent with 10 CFR 50 Appendix J.
Therefore, the proposed change will not involve a significant increase in the probability or consequences of any accident previously evaluated.
- 2. Will operation of the facility in accordance with this proposed change create the possibility of a new or different type of accident from any accident previously evaluated? !
Response: No.
The proposed change does not involve modifications to any existing equipment. The proposed change will not affect the operation of the plant or the manner in which the plant is operated. Therefore, the proposed change will not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Will operation'of the facility in accordance with this proposed change involve a significant reduction in a margin of safety?
I Response: No The margin of safety for the containment barrier is, in part, preserved by compliance with 10 CFR 50 Appendix J. Although the proposed change will allow greater flexibility in meeting Appendix J requirements, the TS will continue to preserve compliance with 10 CFR Appendix J. Therefore, the proposed change will not involve a significant reduction in a margin of safety.
Safety and Sianificant Hazards Determination Based on the above safety analysis, it is concluded that: (1) the proposed change does not constitute a significant hazards consideration as defined by 10CFR50.92; and (2) there is a reasonable assurance that the health and safety of the public will not be endangered by the proposed change; and (3) this action will not result in a condition which significantly alters the impact of the station on the environment as described in the NRC final environmental statement.
, , . _ _ - ,,n+ a , m --- ,4- A _n., a u& .,en.a - , , .n.- -a .L' , -- _ _ -,, _-. _,,a ,.
G
- 0 t
t 9
NPF-38-145 ATTACHMENT A a
- - . . y , - r- _ .,-