ML20090J835
| ML20090J835 | |
| Person / Time | |
|---|---|
| Site: | 05000601 |
| Issue date: | 05/16/1984 |
| From: | Rahe E WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19269A137 | List: |
| References | |
| NS-EPR-2908, NUDOCS 8405230315 | |
| Download: ML20090J835 (2) | |
Text
w ..,
~
L
> \v/
Westinghouse Water Reactor Boxass PittsburghPemsylvania 15230 Electric Corporation Divisions NS-EPR-2908 May 16, 1984 Docket No. STN 50-601 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission i Washington, D. C. 20555
SUBJECT:
Westinghouse Advanced Pressurized Water Reactor (WAPWR) Reference Safety Analysis Report, RESAR-SP/90, PDA Module 3, " Introduction and Site".
Dear Mr. Denton:
Enclosed are:
I 1. Forty-one (41) copies of a Westinghouse document entitled, " Westinghouse Advanced Pressurized Water Reactor RESAR-SP/90, PDA Module 3, Introduction and Site" (Proprietary).
- 2. Four (4) copies of a Westinghouse document entitled, " Westinghouse Advanced Pressurized Water Reactor BESAR-SP/90, PDA Module 3, Introduction and Site" (Non-Proprietary).
- 3. One (1) copy of an Application for Withholding Proprietary Information from Public Disclosure, AW-84-40 (Non-Proprietary).
4 One (1) copy of an original affidavit, AW-82-57 (Non-Proprietary).
The enclosed document; HAPWR RESAR-SP/90, PDA Module 3, " Introduction and 4
Site"; is the third in a series of modular PDA documents planned for submittal L throughout 1984 and early 1985. In total, these modules will fully descrite the Westinghouse Advanced Pressurized Water Reactor Nuclear Power Block design.
This submittal contains proprietary information of Westinghouse Electric .
Corporatien. In conformance with the requirements of 10CFR 2.790, as amended, of the Comission's regulations, we are enclosing with this submittal an application for withholding proprietary information from public disclosure and e an affidavit. The affidavit sets forth the basis on which the information may -
l be withheld from public disclosure by the Commission.
\
1
, a e
- m ne dwf s
e6 {cih6~
- a. =
ip..(f 4g pris
(; . p
7-Mr. H. R. Denton Page 2 Correspondence with respect to the affidavit or application for withholding should .eference AW-84-40 and should be addressed to R. A. Wiesemann, Manager of Regulatory and Legislative Affairs, Westinghouse Electric Corporation, P. O.
Box 355, Pittsburgh, PA 15230.
Very truly yours, M
gt P. Rahe, Jr., Manager Nuclear Safety Department MDB/dr Enclosures cc: D. G. Eisenhut R. J. Mattson F. R. Miraglia, Jr.
C. O. Thomas K. T. Eccleston