ML20090J905
Jump to navigation
Jump to search
| ML20090J905 | |
| Person / Time | |
|---|---|
| Site: | 05000601 |
| Issue date: | 03/31/1984 |
| From: | WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | |
| Shared Package | |
| ML19269A137 | List: |
| References | |
| NUDOCS 8405230370 | |
| Download: ML20090J905 (1) | |
Text
.
17.0 OVALITY ASSURANCE 17.1 OVALITY ASSURANCE DURING DESIGN AND CONSTRUCTION The Westinghouse Water Reactor Divisions Quality Assurance Program is described in Reference 1.
l See the RESAR-SP/90 integrated PDA submittal for a description of the complete MAPWR Quality Assurance Program, including modifications to reflect the expanded design and construction scope of the MAPWR NPB.
17.1.1 References 1.
" Westinghouse Water Reactor Divisions Quality Assurance Plac ' WCAP-8370, Revisions 9A, Amendment 1 February,1981.
O i
O
- O O.
8405230370 840516 PDR ADOCK 05000601 K
PDR MAPWR-I&S 17.1-1 MARCH, 1984 0467e:10/
.