3F0885-01, Monthly Operating Rept for Jul 1985
| ML20133N645 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/31/1985 |
| From: | Graham D, Westafer G FLORIDA POWER CORP. |
| To: | Taylor J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F0885-01, 3F885-1, NUDOCS 8508130565 | |
| Download: ML20133N645 (5) | |
Text
-
e 9
(^/
1 .
% OPERATING DATA REPORT DOCKET NO. 50-302 DATE R/1/85 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS Crystal River Unit 3 N tes I. Unit Name:
- 2. Reporting Period: 7/1/85 - 7/31/85 l
- 3. Licensed Thermal Power (MWt):
2544
- 4. Nameplate Rating (Gross MWe): 890
- 5. Design Electrical Rating (Net MWe): 825
- 6. Maximum Dependable Capacity (Gross MWe): 860
- 7. Maximum Dependable Capacity (Net MWe): R21
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NA
- 9. Power Level To Which Restricted. If Any (Net MWe): NA
- 10. Reasons For Restrictions,if Any: NA O
This Month Yr.-to Date Cumulative i1. Hours In Reporting Period 744 5087 73511
- 12. Number Of Hours Reactor Was Critical 0 1608.3 47524
- 13. Reactor Reserve Shutdown Hours 0 0 1280.3
- 14. Hours Generator On-Line 0 180s.5 46594.3
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 0 2924173 104586058
- 17. Gross Electrical Energy Generated (MWH) 0 _ __
1014639 35741856
- 18. Net Electrical Energy Generated (MWH) 0 954730 33950741
- 19. Unit Service Factor 0% 31.6 % 63.3 6
- 20. Unit Availability Factor 0% 31.6% 63.3 %
- 21. Unit Capacity Factor (Using MDC Net) 0% 22.9% 58.0 %
- 22. Unit Capacity Factor (Using DER Net) 0% 22.7 % 56.0 %
- 23. Unit Forced Outage Rate 0% 0% 19.6%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 8/6/85
- 26. Units In Test Status t Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY l/14/77 INITIA L ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 s
b g813056585071 ih # 73 R ADOCK 05000302- # \,
AVERAGE DAILY UNIT POWER LEVEL U DOCKET NO. 50-302 UNIT F LC R P-3 DATE 8/1/85 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH July 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) iMWe-Net) 0 0 1 37 2 18 3 19 4 20 5 21 6 22 7
-[]
v 23 8 24 9 25 10 26 II 27 12 28 13 29 14 30
-15 31 s-16 --
INSTRUCTIONS On this format. list the average daily umt power lesel in .\lWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
gO (4I77) g i
3 D
O O -
~
DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS FLC RP-3 UNIT NAME DATE 8/1/85 COMPLETED BY S. A Stewnet REPORT MONTil 7/85 (onai ?qn nan 9 TELEPHONE
- , 5? 3 $k I icensee 5-r, c o c.-
Cause & Corrective No. Ibte g 3g i jg5 Event 37 Action to
$E 5 3 z2 =g Report # cn U ! '$
u Present Recurrence c
85-08 850308 S 744 C 4 NA NA NA Refueling outage continues.
I 2 3 4 F: Forced Reason : Method: Exhibit G - Inst ructions S: Scheduled A. Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entr> Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG.
D Regulatory Restriction 4-Other ( Explain ) 0161) li-Operator Training & L cense fixamination F Administrative 5 G-Operational Er ror ( Explain) Eshibit I - Same Source 19/77) Il-Other ( Explain )
r.
> b ." '
MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50-302 f
UNIT FLCRP-3 DATE 8/1/85 COMPLETED BY S.A. Stewart
. TELEPHONE (904) 795-3802 MONTH July 1985
SUMMARY
STATEMENT: Crystal River 3 remains off-line for refueling and maintenance.
i 1 O i
- t O
,-- , _,. - ..,,----,,.,-,__,,,.---n.-, a--- -- -, --- ..,--,rn - -
-n-.
6
- O$
d'o$cS*:
i'::: OOca Y
- E eos Florida Power C ORPOR ATION August 5,1985 3F0885-01 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 July 1985 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management l
AEF/feb Attachments cc: Dr. 3. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 7
d/
\
GEN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151