3F0885-01, Monthly Operating Rept for Jul 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1985
ML20133N645
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/31/1985
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0885-01, 3F885-1, NUDOCS 8508130565
Download: ML20133N645 (5)


Text

-

e 9

(^/

1 .

% OPERATING DATA REPORT DOCKET NO. 50-302 DATE R/1/85 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS Crystal River Unit 3 N tes I. Unit Name:

2. Reporting Period: 7/1/85 - 7/31/85 l
3. Licensed Thermal Power (MWt):

2544

4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): R21
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted. If Any (Net MWe): NA
10. Reasons For Restrictions,if Any: NA O

This Month Yr.-to Date Cumulative i1. Hours In Reporting Period 744 5087 73511

12. Number Of Hours Reactor Was Critical 0 1608.3 47524
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On-Line 0 180s.5 46594.3
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 2924173 104586058
17. Gross Electrical Energy Generated (MWH) 0 _ __

1014639 35741856

18. Net Electrical Energy Generated (MWH) 0 954730 33950741
19. Unit Service Factor 0% 31.6 % 63.3 6
20. Unit Availability Factor 0% 31.6% 63.3 %
21. Unit Capacity Factor (Using MDC Net) 0% 22.9% 58.0 %
22. Unit Capacity Factor (Using DER Net) 0% 22.7 % 56.0 %
23. Unit Forced Outage Rate 0% 0% 19.6%
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 8/6/85
26. Units In Test Status t Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY l/14/77 INITIA L ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 s

b g813056585071 ih # 73 R ADOCK 05000302- # \,

PDR

AVERAGE DAILY UNIT POWER LEVEL U DOCKET NO. 50-302 UNIT F LC R P-3 DATE 8/1/85 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH July 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) iMWe-Net) 0 0 1 37 2 18 3 19 4 20 5 21 6 22 7

-[]

v 23 8 24 9 25 10 26 II 27 12 28 13 29 14 30

-15 31 s-16 --

INSTRUCTIONS On this format. list the average daily umt power lesel in .\lWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

gO (4I77) g i

3 D

O O -

~

DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS FLC RP-3 UNIT NAME DATE 8/1/85 COMPLETED BY S. A Stewnet REPORT MONTil 7/85 (onai ?qn nan 9 TELEPHONE

, 5? 3 $k I icensee 5-r, c o c.-

Cause & Corrective No. Ibte g 3g i jg5 Event 37 Action to

$E 5 3 z2 =g Report # cn U  ! '$

u Present Recurrence c

85-08 850308 S 744 C 4 NA NA NA Refueling outage continues.

I 2 3 4 F: Forced Reason : Method: Exhibit G - Inst ructions S: Scheduled A. Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entr> Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG.

D Regulatory Restriction 4-Other ( Explain ) 0161) li-Operator Training & L cense fixamination F Administrative 5 G-Operational Er ror ( Explain) Eshibit I - Same Source 19/77) Il-Other ( Explain )

r.

> b ." '

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 f

UNIT FLCRP-3 DATE 8/1/85 COMPLETED BY S.A. Stewart

. TELEPHONE (904) 795-3802 MONTH July 1985

SUMMARY

STATEMENT: Crystal River 3 remains off-line for refueling and maintenance.

i 1 O i

  • t O

,-- , _,. - ..,,----,,.,-,__,,,.---n.-, a--- -- -, --- ..,--,rn - -

-n-.

6

  • O$

d'o$cS*:

i'::: OOca Y

  • E eos Florida Power C ORPOR ATION August 5,1985 3F0885-01 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 July 1985 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management l

AEF/feb Attachments cc: Dr. 3. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 7

d/

\

GEN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151