05000254/LER-1997-015, Forwards LER 97-015-01,stating That Licensee Shall Rept Any Condition Prohibited by Tech Specs.Listed Commitments Made by Ltr

From kanterella
Revision as of 20:01, 26 January 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 97-015-01,stating That Licensee Shall Rept Any Condition Prohibited by Tech Specs.Listed Commitments Made by Ltr
ML20216E959
Person / Time
Site:  Constellation icon.png
Issue date: 04/10/1998
From: Sager D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216E964 List:
References
SVP-98-138, NUDOCS 9804160361
Download: ML20216E959 (2)


LER-2097-015, Forwards LER 97-015-01,stating That Licensee Shall Rept Any Condition Prohibited by Tech Specs.Listed Commitments Made by Ltr
Event date:
Report date:
2542097015R00 - NRC Website

text

_ . _ _ _ _ __ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ - - - - -

x 4,c.w can m ,

rc

. .  ;.. a i incu4raar . -n

, .. m m.in v.i noc -

. v. u .i n n u ,2 e -

"id a 22 el SVP-98-138 April 10,1998 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

Reference:

Quad Cities Nuclear Power Station Docket Number 50-254, DPR-29. Unit One Docket Number 50-265, DPR-30. Unit Two Enclosed is Licensee Event Report (LER)97-015. Revision 1, for Quad Cities Nuclear Power Station.

This report is submitted as required by Code of Federal Regulations. Title 10, Part 50.73(a)(2)(i)(B) which states that the licensee shall report any operation or condition prohibited by the Plant's Technical Specifications.

The following commitments are made by this letter:

1. The Station is establishing a Review Board to monitor 10CFR50.59 evaluations. Among other things, the Review Board will address situations for which remediation of preparers and reviewers appears appropriate and establish cnteria for suspension ofquahfications. This will be completed by May 1,1998.
2. The Station will review the role of the Engineering Assurance Group (EAG)in tests of this nature by June 30.1948
3. A Class ! Leakage Test will be performed on Unit I prior to initial criticahty from the current shutdown.
4. As a part of the os erall Station improvement etTort. a specific Insenice Inspection (ISI) program upgra& is uninvay. This program upgrade will not only include the resolution of programmatic issues identified during a recent independent corporate assessment and an on going self assessment. but will also impros e the overall knowledge and Laderstanding of ASME Section XI requirements by the ISI engineers at the Station In particular.

familiarization training will be conducted on this LER and other instances of non-conservative code implementation that may be uncos ered during the on gomg ISI assessment.

This item is due September 1.1998.

5. The inspection required by Code Relief Request PR-02 of the Head Seal Leakage Detection \

System has been complaed for Unit I and is scheduled for Unit 2 during the next refueling outage. Surveillance frequeacies hase been established for this inspection 9804160361 980410 D, PDR ADOCK 05000254 q S PDR di -

m m.m

. ', I i

USNRC SVP 138 2 April 10.1998 If there are any questions or comments concerning this letter, please refer them to Charles Peterson. Regulatory Affairs .\ianager at 309-654-2241. ev: 3600 s

Respectfully.

'l f David e '

ager Site V e President Quad Cities Station DAS/CP/pim Enclosure cc: A. B. Beach. Regional Administrator, Region 111 R. M. Pulsifer. Project Manager. NRR C. G. Miller. Senior Resident inspector, Quad Cities W. D. Leech. MidAmerican Energy Company D. C. Tubbs. .\fidAmerican Energy Company M. E. Wagner. Licensing. Comed F. A. Spangenberg, Regulatory Affairs Manager, Dresden INPO Records Center m