Category:Technical Specifications
MONTHYEARRS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML23122A3022023-07-20020 July 2023 Issuance of Amendments Technical Specifications 2.1.1 and 4.2.1 to Allow a Previously Irradiated Accident Tolerant Fuel Lead Test Assembly to Be Further Irradiated in Unit No. 2 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Va ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21154A0462021-07-13013 July 2021 Issuance of Amendments Nos. 222 and 222 Revision of Technical Specifications for the Ultimate Heat Sink ML21060B2812021-04-0202 April 2021 Issuance of Amendments Nos. 221, 221, 224, and 224 Regarding Technical Specifications 3.8.1, AC Sources-Operating ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20317A0012020-12-28028 December 2020 Non-Proprietary, Issuance of Amendment Nos. 219, 219, 223, and 223, Revise Loss-of-Coolant Accident Methodology in TS 5.6.5, Core Operating Limits Report (COLR) ML21008A4052020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications RS-20-154, Application for Revision to TS 5.5.9, Steam Generator (SG) Program for a One-Time Deferral of Steam Generator Tube Inspections2020-12-16016 December 2020 Application for Revision to TS 5.5.9, Steam Generator (SG) Program for a One-Time Deferral of Steam Generator Tube Inspections ML20246G8652020-09-21021 September 2020 Issuance of Amendment Nos. 222 and 222 One-Time Extension of Unit No. 2 Steam Generator Inspections (COVID-19) ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20118C4292020-06-0909 June 2020 Issuance of Amendments Revision of Technical Specifications for the Ultimate Heat Sink ML20086M2882020-04-0202 April 2020 Correction of Amendments Nos. for Amendments Revising Instrument Testing and Calibration Definitions RS-19-115, Supplement to Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-20020 December 2019 Supplement to Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19190A0812019-08-28028 August 2019 Issuance of Amendments Regarding Limiting Condition of Operation for Inoperability of Snubbers RS-19-018, Supplement to Application to Revise Technical Specifications to Adopt Risk Informed Completion Times2019-02-14014 February 2019 Supplement to Application to Revise Technical Specifications to Adopt Risk Informed Completion Times RS-18-102, License Amendment Request for a One-Time Extension to Technical Specification 3.8.1, AC Sources-Operating, Required Action A.22018-08-10010 August 2018 License Amendment Request for a One-Time Extension to Technical Specification 3.8.1, AC Sources-Operating, Required Action A.2 ML18067A1812018-06-0404 June 2018 Correction to Technical Specification Amendment Identification Format ML16180A2512016-08-0101 August 2016 Issuance of Amendments Regarding Use of Optimized Zirlo as Fuel Cladding Material ML16133A4382016-07-26026 July 2016 Issuance of Amendments Ultimate Heat Sink Temperature Increase RS-16-034, License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized Zirlo Fuel Rod Cladding2016-02-23023 February 2016 License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized Zirlo Fuel Rod Cladding ML15336A7312016-01-27027 January 2016 TS 50456-Bwd-AppsABC ML15307A7762015-12-21021 December 2015 Braidwood - Issuance of Amendments Regarding Installation of New Low Degraded Voltage Relays and Timers on the 4.16 Kv Engineered Safety Features (ESF) Buses (CAC Nos. MF4051 - MF4054) ML15341A3162015-12-14014 December 2015 Correction of Technical Specifications Related to Amendment 145 ML15286A2762015-11-19019 November 2015 Technical Specifications ML15232A4412015-10-28028 October 2015 Issuance of Amendments to Utilize WCAP-16143-P, Revision 1 Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Byron/Braidwood Units 1 and 2, Dated October 2014 ML15268A4862015-10-0606 October 2015 Correction of Amendments Adopting Technical Specification Task Force Traveler TSTF-523 (TAC Nos. MF4436-MF4446) ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML14323A5222015-04-0808 April 2015 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training RS-14-337, Units 1 & 2 - License Amendment Request for Diesel Generator Load Rejection Surveillance Requirement2014-12-18018 December 2014 Units 1 & 2 - License Amendment Request for Diesel Generator Load Rejection Surveillance Requirement ML14239A4272014-12-0707 December 2014 Issuance of Amendments to Clarify Technical Specification 3.3.1, Reactor Trip System Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System Instrumentation RS-14-285, License Amendment Request to Revise Technical Specifications 3.7.9, Ultimate Heat Sink(Uhs)2014-11-24024 November 2014 License Amendment Request to Revise Technical Specifications 3.7.9, Ultimate Heat Sink(Uhs) ML14085A5322014-07-21021 July 2014 Issuance of Amendments Adoption of TSTF-522 Ventilation System Surveillance Requirements ML13311B4812014-07-21021 July 2014 Issuance of Amendments to Revise Technical Specifications Section 3.5.3 ML14069A3372014-04-0202 April 2014 Final Response to Task Interface Agreement 2012-13, Braidwood Station Technical Specification 3.6.3 Compliance with One or More Main Steam Isolation Valves Inoperable ML13326A1072014-03-13013 March 2014 Issuance of Amendments to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program ML13281A0002014-02-0707 February 2014 Issuance of Amendments Regarding Measurement Uncertainty Recapture Power Uprate RS-13-240, License Amendment Request to Administratively Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program.2013-10-10010 October 2013 License Amendment Request to Administratively Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program. RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2013-09-0303 September 2013 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process RS-13-175, Bryon, Units 1 and 2, License Amendment Request to Revise Technical Specifications Section 3.7.2, Main Steam Isolation Valves (Msivs).2013-08-21021 August 2013 Bryon, Units 1 and 2, License Amendment Request to Revise Technical Specifications Section 3.7.2, Main Steam Isolation Valves (Msivs). RS-12-009, License Amendment Request - Diesel Generator Steady State Maximum Frequency and Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel2012-05-0101 May 2012 License Amendment Request - Diesel Generator Steady State Maximum Frequency and Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel RS-12-028, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.2012-03-22022 March 2012 Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. RS-12-023, License Amendment Request to Revise Tech Specs Sections 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator (SG) Tube Inspection Report, for Permanent Alternate Repair Criteria2012-03-20020 March 2012 License Amendment Request to Revise Tech Specs Sections 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator (SG) Tube Inspection Report, for Permanent Alternate Repair Criteria 2024-05-28
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARRS-22-128, 9 to Updated Final Safety Analysis Report, Chapter 15.0, Accident Analyses - Redacted2022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 15.0, Accident Analyses - Redacted ML22355A5242022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Appendix F, License Renewal ML22355A5262022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 10.0, Steam and Power Conversion System ML22355A5442022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Appendix D, Computer Programs ML22355A5332022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Appendix C Has Been Intentionally Deleted ML22355A5402022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 14.0, Initial Test Program ML22355A5282022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 17.0, Quality Assurance ML22355A5292022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML22355A5372022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 7.0, Instrumentation and Controls ML22355A5362022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Appendix a, Application of NRC Regulatory Guides ML22355A5482022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System and Connected Systems ML22355A5212022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 1.0, Introduction and General Description of Plant ML22355A5432022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 16.0, Technical Specifications ML22355A5252022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 11.0, Radioactive Waste Management ML22355A5232022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 4.0, Reactor ML22355A5462022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 9.0, Auxiliary Systems ML22355A5392022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Cover and Page Index ML22355A5452022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 13.0, Conduct of Operations ML24103A2262022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 2.0, Site Characteristics - Braidwood - Redacted ML24103A2282022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment, and Systems - Redacted ML24103A2292022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features - Redacted ML24103A2302022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 8.0, Electric Power - Redacted ML24103A2312022-12-16016 December 2022 9 to Updated Final Safety Analysis Report, Chapter 12.0, Radiation Protection - Redacted ML21137A2532021-05-17017 May 2021 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses-Redacted ML21137A2512021-05-17017 May 2021 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection-Redacted ML21137A2462021-05-17017 May 2021 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 8, Electric Power-Redacted ML21137A2212021-05-17017 May 2021 Byron/Braidwood Stations - Amendment 29 to Fire Protection Report, Chapter 2.3, Figures, Part 2 of 2-Redacted ML21137A2382021-05-17017 May 2021 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features-Redacted ML21008A3972020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix F, Updated Final Safety Analysis Report Supplement (License Renewal) ML21008A3802020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report ML21008A3862020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix D, Computer Programs ML21008A3872020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix E, Requirements Resulting from TMI-2 Accident ML21008A3882020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Plant Description ML21008A3892020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML21008A3922020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML21008A3942020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML21008A3992020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML21008A4012020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML21008A4022020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML21008A4042020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Cover and Page Index ML21008A4052020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21008A4062020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML21008A4082020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML21008A4092020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix C, Deleted ML21008A4102020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix a, Application of NRC Regulatory Guides ML21008A4112020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML21008A4032020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML19170A3472019-06-20020 June 2019 Redacted Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML19170A3842019-06-19019 June 2019 Revision 17 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML19170A3872019-06-19019 June 2019 Redacted Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection 2022-12-16
[Table view] |