ML21194A311

From kanterella
Revision as of 15:15, 20 January 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Site Addendum, Chapter 17, Quality Assurance
ML21194A311
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/22/2021
From:
Ameren Missouri
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21195A333 List: ... further results
References
ULNRC-06673
Download: ML21194A311 (2)


Text

CALLAWAY - SA TABLE OF CONTENTS CHAPTER 17.0 QUALITY ASSURANCE Section Page 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE .................. 17.2-1 17.0-i

CALLAWAY - SA 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Operational Quality Assurance Program for the Union Electric Company Callaway Plant is described in the Operating Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly also maintained in this section of the FSAR, is now maintained solely in the OQAM as a separate licensing document. The OQAM will be maintained in accordance with the requirements of 10 CFR 50.54.

17.2-1 Rev. OL-13 5/03