ML21194A281

From kanterella
Jump to navigation Jump to search
Technical Specification, Chapter 2.0, Safety Limits (Sls)
ML21194A281
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/22/2021
From:
Ameren Missouri
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21195A333 List: ... further results
References
ULNRC-06673
Download: ML21194A281 (2)


Text

CHAPTER TABLE OF CONTENTS CHAPTER 2.0 SAFETY LIMITS (SLs)

Section Page 2.1 SLs ........................................................................................................... 2.0-1 2.2 SL Violations ............................................................................................ 2.0-1 CALLAWAY PLANT 2.0-i

SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs In MODES 1 and 2, the combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in the COLR; and the following SLs shall not be exceeded:

2.1.1.1 The departure from nucleate boiling ratio (DNBR) shall be maintained 1.17 for the WRB-2 DNB correlation.

2.1.1.2 The peak fuel centerline temperature shall be maintained < 5080ºF, decreasing by 58ºF per 10,000 MWd/MTU of burnup.

2.1.2 RCS Pressure SL In MODES 1, 2, 3, 4, and 5, the RCS pressure shall be maintained 2735 psig.

2.2 SL Violations 2.2.1 If SL 2.1.1 is violated, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2.2.2 If SL 2.1.2 is violated:

2.2.2.1 In MODE 1 or 2, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2.2.2.2 In MODE 3, 4, or 5, restore compliance within 5 minutes.

CALLAWAY PLANT 2.0-1 Amendment 216