ML21194A296
Jump to navigation
Jump to search
| ML21194A296 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/22/2021 |
| From: | Ameren Missouri |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML21195A333 | List:
|
| References | |
| ULNRC-06673 | |
| Download: ML21194A296 (1) | |
Text
CALLAWAY - SA 18.0-i Rev. OL-13 5/03 18.0 RESPONSE TO NUREG-0737, 'CLARIFICATION OF TMI ACTION PLAN REQUIREMENTS The discussion of the Union Electric response to NUREG-0737 is subdivided into three sections: 18.1, Operational Safety; 18.2, Siting and Design; and 18.3, Emergency Preparations and Radiation Protection. The subsections presenting the NRC guidance are verbatim quotes from NRC documents.
These sections are discussed in their entirety in the Standard Plant.