ML21194A306

From kanterella
Jump to navigation Jump to search
Site Addendum, General Table of Contents
ML21194A306
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/22/2021
From:
Ameren Missouri
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21195A333 List: ... further results
References
ULNRC-06673
Download: ML21194A306 (4)


Text

CALLAWAY - SA i

GENERAL TABLE OF CONTENTS CHAPTER

1.0 INTRODUCTION

AND GENERAL DESCRIPTION OF PLANT CHAPTER 2.0 SITE CHARACTERISTICS 2.1 GEOGRAPHY AND DEMOGRAPHY 2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES 2.3 METEOROLOGY 2.4 HYDROLOGIC ENGINEERING 2.5 GEOLOGY, SEISMOLOGY, AND GEOTECHNICAL ENGINEERING CHAPTER 3.0 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS 3.3 WIND AND TORNADO LOADINGS 3.4 WATER LEVEL (FLOOD) DESIGN 3.5 MISSILE PROTECTION 3.7 SEISMIC DESIGN 3.8 DESIGN OF CATEGORY I STRUCTURES 3.8A COMPUTER PROGRAMS USED FOR ANALYSIS OF CATEGORY I STRUCTURES 3.A CONFORMANCE TO NRC REGULATORY GUIDES

CALLAWAY - SA GENERAL TABLE OF CONTENTS (Continued) ii CHAPTER 4.0 REACTOR 4.1

SUMMARY

DESCRIPTION CHAPTER 8.0 ELECTRIC POWER

8.1 INTRODUCTION

8.2 OFFSITE POWER SYSTEM 8.3 ONSITE POWER SYSTEMS 8.4 ALTERNATE EMERGENCY POWER SYSTEM (AEPS)

CHAPTER 9.0 AUXILIARY SYSTEMS 9.2 WATER SYSTEMS 9.5 OTHER AUXILIARY SYSTEMS 9.5A DELETED 9.5B DELETED 9.5C DELETED 9.5D DELETED 9.5E DELETED

CALLAWAY - SA GENERAL TABLE OF CONTENTS (Continued) iii CHAPTER 10.0 STEAM AND POWER CONVERSION SYSTEM CHAPTER 11.0 RADIOACTIVE WASTE MANAGEMENT CHAPTER 12.0 RADIATION PROTECTION 12.1 ENSURING THAT OCCUPATIONAL RADIATION EXPOSURES ARE AS LOW AS REASONABLY ACHIEVABLE (ALARA) 12.4 DOSE ASSESSMENT 12.5 RADIATION PROTECTION PROGRAM CHAPTER 13.0 CONDUCT OF OPERATIONS 13.1 ORGANIZATION STRUCTURE OF APPLICANT 13.2 TRAINING 13.3 EMERGENCY PLANNING 13.3A RADIOLOGICAL EMERGENCY RESPONSE PLAN 13.4 REVIEW AND AUDIT (Deleted) 13.5 PLANT PROCEDURES 13.6 INDUSTRIAL SECURITY

CALLAWAY - SA GENERAL TABLE OF CONTENTS (Continued) iv CHAPTER 17.0 QUALITY ASSURANCE 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE CHAPTER 18.0 RESPONSE TO NUREG-0737,

'CLARIFICATION OF TMI ACTION PLAN REQUIREMENTS