0 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Table of Contents
ML21133A123
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/29/2021
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21138A803 List: ... further results
References
Download: ML21133A123 (4)


Text

LGS UFSAR CHAPTER 14 - INITIAL TEST PROGRAM TABLE OF CONTENTS 14.1 SPECIFIC INFORMATION INCLUDED IN THE PSAR 14.2 SPECIFIC INFORMATION INCLUDED IN THE FSAR 14.2.1 Summary of Test Program and Objectives 14.2.1.1 Preoperational Test Program 14.2.1.2 Startup Test Program 14.2.2 Organization and Staffing 14.2.2.1 Plant Staff 14.2.2.2 Startup Group - Organization and Responsibilities 14.2.2.2.1 LGS Unit 2 Startup Manager 14.2.2.2.2 LGS Startup Superintendent - Support 14.2.2.2.3 LGS Startup Superintendent - Operations 14.2.2.2.4 Project Startup Engineer 14.2.2.2.5 Assistant Project Startup Engineer 14.2.2.2.6 Technical Staff Specialists 14.2.2.2.7 Administrative Staff Specialists 14.2.2.2.8 Systems Group Leaders 14.2.2.2.9 Startup Responsibilities 14.2.2.3 Plant Operations Review Committee 14.2.2.4 Test Review Board 14.2.3 Test Procedures 14.2.3.1 Procedure Preparation 14.2.3.2 Procedure Review and Approval 14.2.4 Conduct of Test Program 14.2.4.1 Test Performance 14.2.4.2 Test Prerequisites 14.2.4.3 Procedure Modifications 14.2.4.4 Design Problems 14.2.4.5 Control of Rework, Modifications, and Repairs 14.2.4.6 Major Test Phase Prerequisites 14.2.5 Review, Evaluation, and Approval of Test Results 14.2.5.1 Individual Test Results 14.2.5.2 Test Exceptions 14.2.5.3 Major Test Phase - Test Results 14.2.5.4 Power Ascension Testing - Test Results 14.2.6 Test Records CHAPTER 14 14-i REV. 13, SEPTEMBER 2006

LGS UFSAR 14.2.7 Conformance of Test Programs with Regulatory Guides 14.2.7.1 General Position - Regulatory Guides 14.2.7.2 Specific Position - Regulatory Guides 14.2.8 Utilization of Reactor Operating and Testing Experience in the Development of the Test Program 14.2.9 Trial Use of Plant Operating and Emergency Procedures 14.2.10 Initial Fuel Loading and Initial Criticality 14.2.11 Test Program Schedule 14.2.12 Individual Test Descriptions CHAPTER 14 14-ii REV. 13, SEPTEMBER 2006

LGS UFSAR CHAPTER 14 - INITIAL TEST PROGRAM LIST OF TABLES Table Title 14.2-1 Preoperational Test Procedures 14.2-2 Startup Test Procedures 14.2-3 Startup Test Procedure Abstracts 14.2-4 Preoperational Test Procedure Abstracts CHAPTER 14 14-iii REV. 13, SEPTEMBER 2006

LGS UFSAR CHAPTER 14 - INITIAL TEST PROGRAM LIST OF FIGURES Figure Title 14.2-1 Initial Test Program Schedules 14.2-2 Startup Organization 14.2-3 Test Review Board Organization 14.2-4 Test Procedure Standard Format 14.2-5 Startup Test Sequence (Units 1 & 2) 14.2-6 Preoperational Test Sequence (Unit 1) 14.2-7 Preoperational Test Sequence (Unit 2) 14.2-8 Typical Test Prerequisites 14.2-9 Power/Flow Operating Map CHAPTER 14 14-iv REV. 13, SEPTEMBER 2006