LG-21-101, Annual Commitment Change Summary Report

From kanterella
Revision as of 11:38, 18 January 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Commitment Change Summary Report
ML21312A436
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/08/2021
From: Sturniolo F
Exelon Generation Co LLC
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LG-21-101, RIS 2000-17, SECY-00-045
Download: ML21312A436 (1)


Text

Exelon Generation SECY-00-045 RIS 2000-17 LG-21-101 November 8, 2021 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Annual Commitment Change Summary Report This report summarizes Limerick Generating Station (LGS) changes to NRC commitments that meet the threshold for reporting for the period from July 1, 2020 to June 30, 2021. Changes to these commitments are performed using procedure LS-AA-110, Commitment Management, which employs the guidance provided in NEI 99-04, Guidelines for Managing NRC Commitment Changes. NEI 99-04 was approved by the NRC for licensee use by SECY-00-045, Acceptance of NEI 99-04, Guidelines for Managing NRC Commitments. Licensees were informed that NEI 99-04 was an acceptable process for control of regulatory commitments by the issuance of RIS 2000-17, Managing Regulatory Commitments made by Power Reactor Licensees to the NRC Staff, on September 21, 2000.

LS-AA-110, Commitment Management, Section 4.7, NRC Notification of Commitment Changes/Deletions, requires submittal of a written report once per calendar year.

LGS made no regulatory commitment changes during the reporting period.

There are no new regulatory commitments contained in this letter.

If you have any questions, please contact Laura A. Lynch at (610) 718-3400.

Respectfully, Digitally signed by Sturniolo, Frank Date: 2021.11.04 07:56:43 -04'00' Frank Sturniolo Vice President - Limerick Generating Station Exelon Generation Company, LLC cc: Administrator Region I, USNRC USNRC Senior Resident Inspector, LGS