Letter Sequence Other |
---|
EPID:L-2020-LLE-0052, License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System (Open) EPID:L-2020-LLE-0053, License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System (Approved, Closed) |
|
|
Similar Documents at Cook |
---|
Category:Exemption from NRC Requirements
MONTHYEARML24044A0732024-02-28028 February 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - January 2024 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation ML20324A0032020-12-0808 December 2020 Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L-2020-LLE-0182 (COVID-19)) ML20336A1112020-12-0303 December 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0221 (COVID-19)) ML20304A2862020-11-20020 November 2020 Federal Register Notice for COVID-19 October 2020 Group Exemptions AEP-NRC-2020-64, Unit 2 - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-0404 November 2020 Unit 2 - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic ML20283A2632020-10-0909 October 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0161) (COVID-19)) ML20191A0072020-10-0101 October 2020 Exemptions from Certain Requirements of 10 CFR 54.37 and 10 CFR 50.54 (L-2020-LLE-0052 and L-2020-LLE-0053) ML20171A6862020-07-21021 July 2020 Temporary Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L-2020-LLE-0104 (COVID-19)) ML12142A2992012-08-23023 August 2012 Exemption from 10 CFR 50.46 and App. K of 10 CFR 50 to Permit Use of Optimized Zirlo 0CAN031002, Exemption from the Requirements of 10 CFR 50.36a(a)(2) with Regards to Submittal Date for the Radioactive Effluent Release Report2010-03-18018 March 2010 Exemption from the Requirements of 10 CFR 50.36a(a)(2) with Regards to Submittal Date for the Radioactive Effluent Release Report ML0302200732003-03-20020 March 2003 DC Cook, Unit 2, License Amendment, Reactor Vessel Pressure - Temperature Limits and Exemption from the Requirements of 10 CFR Part 50, Section 50.60(a) 2024-02-28
[Table view] Category:Federal Register Notice
MONTHYEARML24114A3102024-05-0303 May 2024 Monthly (28-Day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 14, 2024 ML24086A4312024-04-0505 April 2024 Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: April 16, 2024 ML24044A0732024-02-28028 February 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - January 2024 ML21251A3692021-09-21021 September 2021 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures: Octobe ML21004A0652021-01-0606 January 2021 Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specifications to Allow One-Time Change to Integrated Leak Rate Test Interval to No Later than Plant Startup After Fall 2022 Refueling Outage ML21004A0442021-01-0606 January 2021 Letter, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specifications to Allow One-Time Change to Integrated Leak Rate Test Interval to No Later than Plant Startup After Fall 2022 Refueling Outage ML20353A2252020-12-28028 December 2020 FRN, Individual Notice of Consideration of Issuance of Amendment, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing - One-Time Deferral of Steam Generator Inspection ML20353A2242020-12-28028 December 2020 Ltr, Individual Notice of Consideration of Issuance of Amendment, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing - One-Time Deferral of Steam Generator Inspection ML20304A2862020-11-20020 November 2020 Federal Register Notice for COVID-19 October 2020 Group Exemptions ML20191A0072020-10-0101 October 2020 Exemptions from Certain Requirements of 10 CFR 54.37 and 10 CFR 50.54 (L-2020-LLE-0052 and L-2020-LLE-0053) ML20035C4082020-02-18018 February 2020 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 02/25/2020 ML19295F0902019-11-0505 November 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/05/2019 ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 ML19042A3062019-02-15015 February 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 2/26/2019 ML18295A7442018-10-25025 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18 NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18180A2182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 20182017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17353A1922017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 NRC-2016-0202, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 20162016-09-19019 September 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 ML16257A5172016-09-19019 September 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 ML16229A2552016-08-18018 August 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016 NRC-2016-0180, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 20162016-08-18018 August 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Publication Date: August 30, 2016 ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 ML15356A5992015-12-29029 December 2015 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 5, 2016 ML15204A2792015-07-27027 July 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 4, 2015 ML15106A9162015-04-20020 April 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication in April 28, 2015, Federal Register NRC-2015-0104, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication in April 28, 2015, Federal Register2015-04-20020 April 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication in April 28, 2015, Federal Register ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML14177A6452014-06-27027 June 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations NRC-2014-0028, Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 20142014-02-10010 February 2014 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 2014 ML14037A4142014-02-10010 February 2014 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 2014 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML12142A2872012-08-23023 August 2012 Exemption from the Requirements of 10 CFR Section 50.46 and Appendix K to 10 CFR Part 50 to Allow the Use of Optimized Zirlo Clad Fuel Rods ML12142A2992012-08-23023 August 2012 Exemption from 10 CFR 50.46 and App. K of 10 CFR 50 to Permit Use of Optimized Zirlo NRC-2012-0199, D. C. Cook: Environmental Assessment for Optimized Zirlo Fuel Amendment and Exemption2012-08-16016 August 2012 D. C. Cook: Environmental Assessment for Optimized Zirlo Fuel Amendment and Exemption ML12124A2512012-08-16016 August 2012 Environmental Assessment for Optimized Zirlo Fuel Amendment and Exemption NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1126504892011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations NRC-2011-0230, FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations2011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations ML11251A0092011-09-0808 September 2011 September 20, 2011 Applications and Amendments to Facility Operating License Involving No Significant Hazards Considerations NRC-2011-0216, September 20, 2011 Applications and Amendments to Facility Operating License Involving No Significant Hazards Considerations2011-09-0808 September 2011 September 20, 2011 Applications and Amendments to Facility Operating License Involving No Significant Hazards Considerations ML1116100542011-08-24024 August 2011 Letter Transmitting Exemption from the Requirements of 10 CFR Section 50.46 and Appendix K to 10 CFR Part 50 ML1116100442011-08-24024 August 2011 Exemption for Use of Optimized Zirlo as Fuel Rod Cladding Material NRC-2011-0188, Exemption for Use of Optimized Zirlo as Fuel Rod Cladding Material2011-08-24024 August 2011 Exemption for Use of Optimized Zirlo as Fuel Rod Cladding Material ML11195A1232011-08-11011 August 2011 Letter Transmitting Environmental Assessment Regarding Fuel Burnup Limit of 62 Gwd/Mtu NRC-2011-0187, Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/20112011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 ML1122302752011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 NRC-2011-0040, Sholly Report for Fr Publication on February 22, 20112011-02-10010 February 2011 Sholly Report for Fr Publication on February 22, 2011 2024-05-03
[Table view] |
Text
NUCLEAR REGULATORY COMMISSION Docket Nos. 50-315 and 50-316 Indiana Michigan Power Company Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 Exemption I. Background.
The Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 (CNP), is a two-unit nuclear power plant located in Berrien County, Michigan. Indiana Michigan Power Company (I&M, the licensee) holds Renewed Facility Operating License Nos. DPR-58 and DPR-74 for CNP. These licenses are subject to the rules, regulations, and orders of the U.S. Nuclear Regulatory Commission (NRC, the Commission).
II. Request/Action.
By letter dated April 7, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20126G456), I&M requested an exemption from requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 54.37, Additional records and recordkeeping requirements, and 10 CFR 50.54, Conditions of licenses, specifically with respect to their references to 10 CFR 50.71, Maintenance of records, making of reports, paragraph (e).
10 CFR 50.71(e)(4) states, in part, that Subsequent revisions [to the final safety analysis report (FSAR)] must be filed annually or 6 months after each refueling outage provided the interval between successive updates does not exceed 24 months. The two CNP units share a common FSAR; therefore, this rule requires the licensee to update that same document within 6 months after a refueling outage for either unit. By letter dated March 3, 1998 (ADAMS Accession No. ML021090203), the NRC granted I&M an exemption from 10 CFR 50.71(e)(4) for
CNP, which allowed the licensee to submit FSAR updates after each Unit No. 1 refueling outage, not to exceed 24 months between successive updates. This exemption was granted before renewed licenses were issued for CNP.
10 CFR 54.37(b) states, in part:
After the renewed license is issued, the FSAR update required by 10 CFR 50.71(e) must include any systems, structures, and components newly identified that would have been subject to an aging management review or evaluation of time-limited aging analyses in accordance with [10 CFR] 54.21.
10 CFR 50.54(a)(3) states, in part:
Changes to the quality assurance program description that do not reduce the commitments must be submitted to the NRC in accordance with the requirements of [10 CFR] 50.71(e).
The references in 10 CFR 54.37(b) and 10 CFR 50.54(a)(3) to 10 CFR 50.71(e) can be interpreted to include the reporting frequency prescribed in 10 CFR 50.71(e)(4). If interpreted in this way, 10 CFR 54.37(b) would require information related to newly identified systems, structures, and components at CNP that are subject to an aging management review or evaluation of time-limited aging analyses, and 10 CFR 50.54(a)(3) would require changes to the quality assurance program description that do not reduce the commitments, to be submitted to the NRC annually or 6 months after each refueling outage provided the interval between successive updates does not exceed 24 months, despite the NRCs March 3, 1998 approval of an exemption from 10 CFR 50.71(e)(4) for CNP. The exemption that I&M now requests from 10 CFR 54.37(b) and 10 CFR 50.54(a)(3) would permit I&M to align the reporting frequency of 2
these requirements with the CNP FSAR update frequency permitted by the March 3, 1998 exemption.
III. Discussion.
Pursuant to 10 CFR 50.12, the Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of 10 CFR Part 50, which are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security and when any of the special circumstances listed in 10 CFR 50.12(a)(2) are present. These special circumstances include, among other things:
(a) Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule and (b) Compliance would result in undue hardship or other costs that are significantly in excess of those contemplated when the regulation was adopted, or that are significantly in excess of those incurred by others similarly situated.
10 CFR 54.15 states that exemptions from the requirements of 10 CFR Part 54 may be granted by the Commission in accordance with 10 CFR 50.12.
A. Authorized by Law The requested exemption from 10 CFR 54.37(b) and 10 CFR 50.54(a)(3) would permit I&M to align the reporting frequency of these requirements with the CNP FSAR update frequency permitted by the March 3, 1998 exemption. As stated above, 10 CFR 50.12 and 10 CFR 54.15 allow the NRC to grant exemptions from the requirements of 10 CFR Parts 50 and 54 when the exemptions are authorized by law. The NRC staff has determined, as explained below, that granting the licensees proposed exemption will not result in a violation of the Atomic Energy Act of 1954, as amended, or the Commissions regulations. Therefore, the exemption is authorized by law.
3
B. No Undue Risk to the Public Health and Safety The underlying purpose of 10 CFR 50.71(e)(4) is to ensure that licensees periodically update their FSARs so that they accurately reflect the plant design and operation, which includes changes required pursuant to 10 CFR 54.37(b) and 10 CFR 50.54(a)(3). The NRC has determined by rule that a frequency not exceeding 24 months between successive updates is acceptable for maintaining FSAR content up-to-date. The requested exemption would provide an equivalent level of protection to the existing requirements because it ensures that updates to the CNP FSAR are submitted with no greater than 24 months between successive updates.
The requested exemption would also meet the intent of the rule with respect to regulatory burden reduction. Additionally, based on the nature of the requested exemption and the fact that updates will not exceed 24 months from the last submittal as described above, no new accident precursors would be created by the exemption; therefore, neither the probability nor the consequences of postulated accidents would be increased. In conclusion, the requested exemption will not present an undue risk to the public health and safety.
C. Consistent with the Common Defense and Security The requested exemption from 10 CFR 54.37(b) and 10 CFR 50.54(a)(3) with respect to their references to 10 CFR 50.71(e) would allow I&M to continue to submit its periodic updates to the CNP FSAR within 6 months after each CNP, Unit No. 1 refueling outage, not to exceed 24 months from the last submittal. Neither these regulations nor the proposed exemption thereto has any relation to security issues. Therefore, the common defense and security is not impacted by the requested exemption.
D. Special Circumstances Special circumstances, in accordance with 10 CFR 50.12(a)(2)(ii), are present whenever application of the regulation in the particular circumstances is not necessary to achieve the underlying purpose of the rule.
4
The underlying purpose of 10 CFR 54.37(b) and 10 CFR 50.54(a)(3) is to ensure that licensees periodically update their FSARs with changes required by these regulations so that the FSARs remain up-to-date and accurately reflect the plant design and operation. As previously decribed, the references in 10 CFR 54.37(b) and 10 CFR 50.54(a)(3) to 10 CFR 50.71(e) can be interpreted to include the reporting frequency prescribed in 10 CFR 50.71(e)(4). If interpreted in this way, strict compliance with the 10 CFR 54.37(b) and 10 CFR 50.54(a)(3) reporting requirements at CNP, where the FSAR is updated at a frequency permitted by the March 3, 1998 exemption, would create a disconnect between these report updates and the FSAR update. Specifically, since CNP is a dual-unit facility with a single shared FSAR and staggered refueling outages, application of the phrase after each refueling outage in 10 CFR 50.71(e)(4), as it relates to 10 CFR 54.37(b) and 10 CFR 50.54(a)(3), would result in more frequent report updates than are necessary to achieve the underlying purpose of the rule. Therefore, special circumstances are present per 10 CFR 50.12(a)(2)(ii).
E. Environmental Considerations With respect to its impact on the quality of the human environment, the NRC has determined that the issuance of the exemption discussed herein meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(25). Under 10 CFR 51.22(c)(25), the granting of an exemption from the requirements of any regulation of 10 CFR Chapter I (which includes 10 CFR 54.37 and 10 CFR 50.54) is an action that is a categorical exclusion, provided that:
(i) There is no significant hazards consideration; (ii) There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (iii) There is no significant increase in individual or cumulative public or occupational radiation exposure; (iv) There is no significant construction impact; 5
(v) There is no significant increase in the potential for or consequences from radiological accidents; and (vi) The requirements from which an exemption is sought involve:
(A) Recordkeeping requirements; (B) Reporting requirements; (C) Inspection or surveillance requirements; (D) Equipment servicing or maintenance scheduling requirements; (E) Education, training, experience, qualification, requalification or other employment suitability requirements; (F) Safeguard plans, and materials control and accounting inventory scheduling requirements; (G) Scheduling requirements; (H) Surety, insurance or indemnity requirements; or (I) Other requirements of an administrative, managerial, or organizational nature.
The NRC staffs determination that all of the criteria for this categorical exclusion are met is as follows:
I. 10 CFR 51.22(c)(25)(i): There is no significant hazards consideration.
Staff Analysis: The criteria for determining whether an action involves a significant hazards consideration are found in 10 CFR 50.92. The proposed action involves only a schedule change regarding the submission of an update to the application. Therefore, there are no significant hazards considerations because granting the exemption would not:
(1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) Create the possibility of a new or different kind of accident from any accident previously evaluated; or 6
(3) Involve a significant reduction in a margin of safety.
II. 10 CFR 51.22(c)(25)(ii): There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite.
Staff Analysis: The proposed action involves only a schedule change, which is administrative in nature, and does not involve any changes in the types or significant increase in the amounts of any effluents that may be released offsite.
III. 10 CFR 51.22(c)(25)(iii): There is no significant increase in individual or cumulative public or occupational radiation exposure.
Staff Analysis: Since the proposed action involves only a schedule change, which is administrative in nature, it does not contribute to any significant increase in individual or cumulative public or occupational radiation exposure.
IV. 10 CFR 51.22(c)(25)(iv): There is no significant construction impact.
Staff Analysis: Since the proposed action involves only a schedule change, which is administrative in nature, it does not involve any construction impact.
V. 10 CFR 51.22(c)(25)(v): There is no significant increase in the potential for or consequences from radiological accidents.
Staff Analysis: The proposed action involves only a schedule change, which is administrative in nature and does not impact the potential for or consequences from radiological accidents.
7
VI. 10 CFR 51.22(c)(25)(vi): The requirements from which the exemption is sought involve scheduling requirements and other requirements of an administrative, managerial, or organizational nature.
Staff Analysis: The proposed action involves scheduling requirements and other requirements of an administrative, managerial, or organizational nature because it is associated with the requirement in 10 CFR 50.71(e)(4), which stipulates that revisions to the FSAR must be filed annually or 6 months after each refueling outage provided the interval between successive updates does not exceed 24 months.
Based on the above, the NRC staff concludes that the proposed exemption meets the eligibility criteria for the categorical exclusion set forth in 10 CFR 51.22(c)(25). Therefore, in accordance with 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the NRCs issuance of this exemption.
IV. Conclusions.
The NRC has determined that, pursuant to 10 CFR 50.12 and 10 CFR 54.15, the exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security. Also, special circumstances are present. Therefore, the NRC hereby grants I&M an exemption from the requirements of 10 CFR 54.37(b) and 10 CFR 50.54(a)(3) with respect to their references to 10 CFR 50.71(e) to allow I&M to continue to submit its periodic updates to the CNP FSAR within 6 months after each CNP, Unit No. 1 refueling outage, not to exceed 24 months from the last submittal.
This exemption is effective upon issuance.
8
Dated October 1, 2020.
For the Nuclear Regulatory Commission.
David J. Digitally signed by David J. Wrona Date: 2020.10.01 11:19:32 -04'00' Wrona David J. Wrona, Acting Deputy Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.