|
---|
Category:Exemption from NRC Requirements
MONTHYEARML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation ML20324A0032020-12-0808 December 2020 Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L-2020-LLE-0182 (COVID-19)) ML20336A1112020-12-0303 December 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0221 (COVID-19)) ML20304A2862020-11-20020 November 2020 Federal Register Notice for COVID-19 October 2020 Group Exemptions AEP-NRC-2020-64, Unit 2 - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-0404 November 2020 Unit 2 - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic ML20283A2632020-10-0909 October 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0161) (COVID-19)) ML20265A0572020-10-0606 October 2020 Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.b and IV.F.2.c (EPID L-2020-LLE-0113 (COVID-19)) ML20191A0072020-10-0101 October 2020 Exemptions from Certain Requirements of 10 CFR 54.37 and 10 CFR 50.54 (L-2020-LLE-0052 and L-2020-LLE-0053) ML20171A6862020-07-21021 July 2020 Temporary Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L-2020-LLE-0104 (COVID-19)) 0CAN101901, Request for Exemption from Requirements of 10 CFR 72.212(b)(3)2019-10-11011 October 2019 Request for Exemption from Requirements of 10 CFR 72.212(b)(3) ML15056A3672015-03-16016 March 2015 Letter, Exemption from Certain 10 CFR 50.61 and 10 CFR 50, Appendix G Requirements to Allow Use of Alternate Method to Determine Initial Nil Ductility Reference Temperature for Linde 80 Welds ML14346A2102015-01-13013 January 2015 Letter, Exemption from 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water Cooled Power Reactors ML14346A2402015-01-12012 January 2015 Exemption from 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water Cooled Power Reactor NRC-2015-0008, Exemption from 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water Cooled Power Reactor2015-01-12012 January 2015 Exemption from 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water Cooled Power Reactor ML14353A4652014-12-19019 December 2014 Encl (Copy of Exemption) to Ltr s L Pyle, Arkansas Nuclear One, Request for Exemption from Holtec Intl CoC No. 1014 Fuel Specification and Loading Conditions at ANO ISFSI (72-1014, 72-13) TAC L24954 0CAN111405, Response to Request for Additional Information Request for Exemption from Holtec International Certificate of Compliance (CoC) (72-1014) Fuel Specification and Loading Conditions (TAC No. L24954)2014-11-0707 November 2014 Response to Request for Additional Information Request for Exemption from Holtec International Certificate of Compliance (CoC) (72-1014) Fuel Specification and Loading Conditions (TAC No. L24954) ML12142A2992012-08-23023 August 2012 Exemption from 10 CFR 50.46 and App. K of 10 CFR 50 to Permit Use of Optimized Zirlo NRC-2010-0314, Exemption from Requirements of 10 CFR 50.36a(a)(2) Submittal Date for Radioactive Effluent Release Report (TAC ME3548 and ME3549)2010-09-28028 September 2010 Exemption from Requirements of 10 CFR 50.36a(a)(2) Submittal Date for Radioactive Effluent Release Report (TAC ME3548 and ME3549) ML1009205752010-09-28028 September 2010 Exemption from Requirements of 10 CFR 50.36a(a)(2) Submittal Date for Radioactive Effluent Release Report ML1006306362010-03-23023 March 2010 Letter, Exemption from 10 CFR Part 73, Physical Security Requirements ML1006306762010-03-23023 March 2010 Exemption from 10 CFR Part 73 Physical Security Requirements NRC-2010-0111, Exemption from 10 CFR Part 73 Physical Security Requirements (TAC Nos. ME3089 and ME3090)2010-03-23023 March 2010 Exemption from 10 CFR Part 73 Physical Security Requirements (TAC Nos. ME3089 and ME3090) 0CAN031002, Exemption from the Requirements of 10 CFR 50.36a(a)(2) with Regards to Submittal Date for the Radioactive Effluent Release Report2010-03-18018 March 2010 Exemption from the Requirements of 10 CFR 50.36a(a)(2) with Regards to Submittal Date for the Radioactive Effluent Release Report ML0803700122008-03-19019 March 2008 Exemption from Requirements of 10 CFR Section 50.46 and Appendix K to 10 CFR Part 50, to Allow Use of Optimized ZIRLO-TM as Fuel Rod Cladding Material ML0517904172005-07-25025 July 2005 Exemption from 10 CFR 50.46 and 10 CFR Part 50, Appendix K ML0429601802005-04-15015 April 2005 Arkansas, Units 1 and 2 - Safety Evaluation and Exemption from the Requirements 10 CFR Part 50, Appendix a ML0435102072004-12-0303 December 2004 OCFR50 Appendix a Exemption Request for Steam Trap Isolation Valves ML0330701432003-10-30030 October 2003 CFR 50 Appendix a Exemption Request for Steam Trap Isolation Valves ML0302200732003-03-20020 March 2003 DC Cook, Unit 2, License Amendment, Reactor Vessel Pressure - Temperature Limits and Exemption from the Requirements of 10 CFR Part 50, Section 50.60(a) ML0225505592002-09-12012 September 2002 Exemption from Requirements of 10 CFR Part 20, Section 20.1003 Definition of Total Effective Dose Equivalent (TEDE) 2024-01-19
[Table view] Category:Letter type:
MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] |
Text
Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4710 David B. Bice Acting Manager, Licensing Arkansas Nuclear One 0CAN031002 March 18, 2010 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Exemption from the Requirements of 10 CFR 50.36a(a)(2)
Submittal Date for the Radioactive Effluent Release Report Arkansas Nuclear One, Units 1 and 2 Docket Nos. 50-313 and 50-368 License No. DPR-51 and NPF-6
REFERENCE:
- 1. Indiana Michigan Power Company Letter to the NRC, dated October 21, 2008, Request for License Amendment to Technical Specification 5.6.3 Radioactive Effluent Release Report, and One-Time Exemption from 10 CFR 50.36a(a)(2) (DC Cook Nuclear Power Plant, Units 1 and 2)
- 2. NRC Letter to Indiana Michigan Power Company, dated March 30, 2000, Donald C. Cook Nuclear Power Plant, Units 1 and 2 -
One-Time Exemption from the Requirements of 10 CFR 50.36a(a)(2),
Submittal Date for the 2008 Radioactive Effluent Release Report (TAC NOS. ME00002 and ME0003)
Dear Sir or Madam:
Pursuant to 10 CFR 50.12, Entergy Operations, Inc. (Entergy) requests an exemption from the requirements of 10 CFR 50.36a(a)(2) with regards to the submittal date for the Radioactive Effluent Release Report for Arkansas Nuclear One, Units 1 and 2 (ANO-1 and 2). The proposed exemption is administrative in nature and requests a change to the submittal date of the report to that of the Technical Specification (TS) date of prior to May 1 of each year.
ANO-1 TS 5.5.1 and ANO-2 TS 6.5.1 require the Radioactive Effluent Release Report to be submitted prior to May 1 of each year in accordance with 10 CFR 50.36a.
10 CFR50.36a(a)(2) states that the interval between submittals of the Radioactive Effluent Release Report must not exceed 12 months. Originally, both units TSs required this report be submitted either prior to March 1 or within 60 days after January 1 of each year. Later, through several TS changes, the requirement became prior to May 1 of each year.
0CAN031002 Page 2 of 3 While the TS changes revised the submittal date, they did not address the 12-month interval between submittals that is required by 10 CFR 50.36a(a)(2). As a result, the actual submittal date remained at the end of February of each year. Because of this, a period of only two months is available to prepare and submit the report. This presents an undue administrative burden on ANO personnel due to the compressed schedule for data collection, report preparation, and internal review following the closure of the reporting period. The proposed exemption allows an additional two months for these activities to match the current submittal date stated in the TS.
The proposed exemption alters the required submission date for the Radioactive Effluent Release Report. It does not change the information in the report and does not change the physical plant or affect plant operation.
This letter contains no new commitment.
This request is essentially the same as that made in Reference 1 and approved by the NRC in Reference 2.
The Radioactive Effluent Release Report for ANO for the Calendar Year 2009 has been submitted. Entergy requests that this exemption be approved by February 1, 2011. This is prior to the submittal of the ANO Radioactive Effluent Release Report for the Calendar Year 2010.
If you have any questions or require additional information, please contact me.
Sincerely, DBB/rwc
Attachment:
Exemption From the Requirements of 10 CFR 50.36a(a)(2) Submittal Date for the Radioactive Effluent Release Report
0CAN031002 Page 3 of 3 cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U.S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8 B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852
ATTACHMENT TO 0CAN031002 Exemption From the Requirements of 10 CFR 50.36a(a)(2)
Submittal Date for the Radioactive Effluent Release Report
Attachment to 0CAN031002 Page 1 of 3 Exemption From the Requirements of 10 CFR 50.36a(a)(2)
Submittal Date for the Radioactive Effluent Release Report 10 CFR 50.36a(a)(2) requires each licensee to submit a report to the NRC annually that specifies the quantity of each of the principal radionuclides released to unrestricted areas in liquid and in gaseous effluents during the previous 12 months, including any other information as may be required by the NRC to estimate maximum potential annual radiation doses to the public resulting from effluent releases. The report must be submitted as specified in 10 CFR 50.4, and the time between report submittals must be no longer than 12 months.
Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specification (TS) 5.5.1 and ANO-2 TS 6.5.1 require the Radioactive Effluent Release Report covering the operation of each unit in the previous year to be submitted prior to May 1 of each year in accordance with 10 CFR 50.36a.
10 CFR50.36a(a)(2) states that the interval between submittals of the Radioactive Effluent Release Report must not exceed 12 months. Originally, both units TSs required this report be submitted either prior to March 1 or within 60 days after January 1 of each year. Later, during the ANO-1 TS conversion, the submittal date for ANO-1 became May 1. ANO continued to send one submittal for the site as allowed by the TSs. The conservative date of the end of February was used. Entergy proposed to reorganize Section 6 of the ANO-2 TS in 2003. The proposed changes were to make the ANO-2 requirements consistent with the ANO-1 TS requirements. These changes were subsequently approved by the NRC and the submittal date became prior to May 1 of each year for both units.
While the submittal dates were consistent again between the two units TS, the 12-month interval between submittals was not addressed. The actual submittal date remained at the end of February of each year. As a result, a period of only two months is available to prepare and submit the report. This presents an undue administrative burden on ANO personnel due to the compressed schedule for data collection, report preparation, and internal review following the closure of the reporting period.
ANO has recognized this undue burden and is requesting an exemption from the 12-month reporting criteria specified in 10 CFR 50.36a(a)(2) for its submittal of the Radioactive Effluent Release Report. The proposed exemption allows an additional two months for the activities described above. Future submittals will be made in accordance with the units TSs, i.e., each year prior to May 1. Approving the exemption will relieve ANO of unnecessary burden while continuing to ensure the subject report is submitted on an annual basis.
It should be noted that this exemption request does not affect the information to be submitted or the time period the report covers, only the date the report is submitted.
10 CFR 50.12 DISCUSSIONS Pursuant to 10 CFR 50.12, the Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of 10 CFR Part 50 when (1) the exemptions are authorized by law, will not present an undue risk to public health or safety, and are consistent with the common defense and security, and (2) when special circumstances are present. These circumstances include the special circumstances that would provide only temporary relief from the applicable regulation and the licensee or applicant has made good faith efforts to comply with the regulation.
Attachment to 0CAN031002 Page 2 of 3 Authorized by Law This exemption would allow the licensee to submit the Radioactive Effluent Release Report for subsequent calendar years prior to May 1 of each year, in accordance with TSs. As stated above, 10 CFR 50.12 allows the NRC to grant exemptions from the requirements of 10 CFR Part 50. The NRC staff in the past has determined that granting a similar request for another licensee does not result in a violation of the Atomic Energy Act of 1954, as amended, or the Commissions regulation. The exemption will continue to ensure the subject annual report is submitted to the NRC in a timely manner each year. Based on the above, the exemption is authorized by law.
No Undue Risk to Public Health and Safety The underlying purpose of the reporting requirements specified in 10 CFR 50.36a(a)(2) is to report to the Commission annually the quantity of each of the principal radionuclides released to unrestricted areas in liquid and gaseous effluents during the previous 12 months, including any other information as may be required by the Commission to estimate maximum potential annual radiation doses to the public resulting from effluent releases. This exemption request does not affect the information required to be submitted or the time period the report covers or the frequency of the report, but only the date by which the report must be submitted. Based on the above, no new accident precursors are created by extending the submittal date for the Radioactive Effluent Release Report to prior to May 1. The probability of postulated accidents is not increased. Also, based on the above, the consequences of postulated accidents are not increased. Therefore, there is no undue risk to public health and safety.
Consistent with Common Defense and Security The proposed exemption has no relation to security issues. The common defense and security is, therefore, not impacted by this exemption.
Special Circumstances Special circumstances, in accordance with 10 CFR 50.12(a)(2)(v), are present whenever application of the regulation would provide only temporary relief from the applicable regulation and the licensee or applicant has made good faith efforts to comply with the regulation. As noted above, the purpose of this reporting requirement is to submit a report to the Commission annually that specifies the quantity of each of the principal radionuclides released to unrestricted areas in liquid and gaseous effluents, including any other information as may be required by the Commission to estimate maximum potential annual radiation doses to the public resulting from effluent releases. The proposed exemption does not affect the information required to be submitted or the time period the report covers, but only the date by which the report must be submitted. The requested exemption provides relief from the regulation in that it affords slightly more time for report preparation and establishes a consistent report due date in compliance with the units TSs. The current TSs require future reports be submitted on an annual basis as required by 10 CFR 50.36a(a)(2). Therefore, since the underlying purpose of 10 CFR 50.36a(a)(2) is achieved, the special circumstances of 10 CFR 50.12(a)(2)(v) for the granting of an exemption from 10 CFR 50.36a(a)(2) exists.
Attachment to 0CAN031002 Page 3 of 3 As demonstrated above, the requested exemption is authorized by law, does not present an undue risk to the public health and safety, and is consistent with the common defense and security. Also, special circumstances are present. Based on this, Entergy believes the requested exemption should be granted for ANO.
ENVIRONMENTAL IMPACT The proposed action does not significantly increase the probability or consequences of accidents. No changes are being made in the types of effluents that may be released offsite.
There is no significant increase in the amount of any effluent released offsite. There is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed actions.
With regard to potential non-radiological impacts, the proposed action does not have a potential to affect any historic sites. It does not affect non-radiological plant effluents and has no other environmental impact. Therefore, there are no significant non-radiological environmental impacts associated with the proposed action.
Based on the above, there are no significant environmental impacts associated with the proposed exemption.