ML20204F785
| ML20204F785 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/18/1987 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | James O'Reilly GEORGIA POWER CO. |
| References | |
| NUDOCS 8703260270 | |
| Download: ML20204F785 (2) | |
See also: IR 05000321/1986037
Text
..
SAFEGUARDS INFORMATION
MAR 18 887
Georgia Power Company
ATTN: Mr. James P. O'Reilly
Senior Vice President - Nuclear
Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-321/86-37 AND 50-366/86-37
Thank you for your responses of January 16 and 30,1987, to our Notice of
Violation issued on December 17, 1986, concerning activities conducted at your
Hatch facility. We have evaluated your response and found that it meets the
requirements 10 CFR 2.201. We will examine the implementation of your
corrective actions during future inspections.
After careful consideration of the basis for your request that the violations be
withdrawn, we have concluded for the reasons presented in the enclosure to this
letter that the violations should remain as presented in the Notice of
Violation.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, Safeguards Information is
exempt from public disclosure. Therefore, the enclosure to this letter will not
be placed in the NRC's Public Document Room.
Should you have any questions about this letter, please contact us.
Sincerely,
Luis A. Reyes, Director
Division of Reactor Projects
i Enclosure:
'
Staff Assessment of Licensee Response
! (Safeguards Information)
'
cc w/ enc 1:
J. T. Beckham, Vice President, Nuclear
Operations
- H. C. Nix, Site Operations, General
Manager
r A. Fraser, Acting Site QA Supervisor
l L. Gucwa, Manager, Nuclear Safety
and Licensing
l ENCLOSURE CONTAINS
SAFEGU.m0S INFORMATION
bec w/ encl: (See page 2) tJPON SEPARATION THIS
PAGE IS DECONTROLLED.
g?832a88cR E88@p EGUARDS INFORMATION M \
'
'
SAFEGUARDS INFORMATION
Georgia Power Company 2 MAR 181987
bec w/ enc 1:
IE File
NMSS/SGPL
NRR/DL/SSPB
bec w/o encl:
NRC Resident Inspector
Document Control Desk, 016
State of Georgia
.
RII I --
I
'
ATillman:er re / Cli b JStohr
03/f/87 03//g/87 03/ /B7
03//7 /87
RII RII RII.'
FCan 11 VBro ee GJ En0LCSURE CONTAINS
03/jy/87 :!>.P :CL'AROS INFCFMATION
03/gj/87 03/f/87
/ LPOi! SEPARATION Ti!IS
PACE IS DEC0!ITROLLSD.
SAFEGUARDS INFORMATION
j-
,
Ge$rg;a N*ev Company
- 333 Pecmont Avenue .
,, Atlanta. Georg<a 30308 r
Teiephone 404 526 6526 t.
'
tJRCi;GN,_n
Ma ong Accress
i tlan:a Ga'
Nst Office Bos 4545
Attanta. Georgia 30302
GeorgiaPower
37 FEB 3* P l: 04
L T. oucwe $(-1941
Manager Nuclear safety
and Ucensing
0093b
January 30, 1987
U.S. Nuclear Regulatory Comission
ATTN: Document Control Desk
Washington, D.C. 20555
NRC 00CKETS 50-321, 50-366
OPERATING LICENSES DPR-57, NPF-5
EDWIN 1. HATCH NUCLEAR PLANT UNITS 1, 2 ~
INSPECTION REPORT 86-37
Inspection 6
Gentlemen:
1987, in response to I.E. it a complete
By our letter dated January 16,
Report 86-37, Georgia Power Company 1, 1987. noted
Due our intent to subm
to unforeseen
the Security Plan by FebruaryThe revised plan is scheduled to be
revision to
circumstances, this has been delayed.
submitted by March 31, 1987.
If you have any questions, please contact this office.
Sincerely, .
4 r.h [G .
_
L. T. Gucwa
HJB/sjb
U.S. Nuclear Regulatory Commission _ l
c: Georgia Powar Company Dr. J, N. Grace,, Regional Administrator -
Mr. J. P. O'Reilly Mr. P. Holmes-Ray, Senior Resident
Mr. J. T. Beckham, Jr. Inspector - Hatch
Mr. H. C. Nix, Jr.
_
g -fl9 N
_
l' ; Georg a Nws' Comcam
- an Ge ga * ,
wemum
-
4
Ma t;r'g Add'955
N5t O't.ce Bos 4$4$
At'aMa Georg a 30302
ENCLOSURE CONTAINS SAFEGUARDS INFORMATION Georgia '
Pbwer
,
L. t ove.,.
UPON SEPARATION THIS PAGE DECONTROLLED
Managet Nuctear Safety
and Licens ng
SL-1837
00llb
January 16, 1987
a
U.S. Nuclear Regulatory Commission w
--
,
ATTN: Document Control Desk
Washington, D.C. 20555 g
- UI?
NRC DOCKETS 50-321,50-366 EO
OPERATING LICENSES DPR-57, NPF-5 "
EDWIN I. HATCP NUCLEAR PLAN UNITS 1, 2 2 $
INSPECTION REPORT 86-37_
.. fz
-
a M
4-
Gentlemen:
This letter is in response to the Notice of Violation cited in Inspection The
Report Nos. 50-321/86-37 and SC-366/86-37, dated December 17, 1986.
referenced report relates to an NRC inspection conducted November 17-20,
1986. The inspection covered a broad range of the security operations at the
plant and resulted in the identiff cation of two . Severity Level V findings.- .
Georgia Power Company (GPC) has undertaken numercus security improvements
at both Plant Hatch and Plant Vogtie, and at our Corporate office to further
enhance the Nuclear Security Program, as indicated in previous correspondence
and meetings. We specifically wt.sh to note that GPC has created and fully
- staffed a corporate nuclear security organization that monitors andRegulatory
The recent provides
assistance and direction to Plant: Security Operations.
Effectiveness Review of Plant Hatch, which concentrated - on actual physical
security issues, resulted in a favorable preliminary report on the security
We belfewe this review is but another confirmation of
operation of the plant.our efforts to achieve excellenc:e and the exemplary results a
! the past year.
Georgia Power Company beliewes that the effort and attention given to
of perforinance
these two minor _ findings and the related implications
indicators and noncompliance stat-istics is contrary to effective and eff.icient 2~,
regulatory practices inherent im the NRC's Enforcement Policy (10 CFR
safeguards
Appendix C). In our view, neither of the findings had
significance. The enclosure to this letter addresses in detail these two
!
'
taken by GPC. In addition, the enclosure
minor findings and the actions
l describes the reasons which suppcort our request that these two violations be
withdrawn. Our request that thesse two proposals be withdrawn is respectfully
l
j
i submitted. An affirmative response would reinforce the positive movement our
nuclear security program has alrenady made.
ENCLOSURE CONTFAINS SAFEGUARDS INFORMATION
UPON SEPARATI0!6N THIS PAGE IS DECONTROLLED
M NI
i .
- '
.. .
Georgia Power A
ENCLOSURE CONTAINS SAFEGUARDS INFORMATI0f.
UPON SEPARATIWN THIS PAGE 15 DECONTROLLED
U.S. Nuclear Regulatory Commission
January 16, 1987
Page 2
The enclosure to this letter is exempt from disclosure in accordance with
10 CFR 2.790(d) and 10 CFR 73.27. If you have any questions, please contact
this office.
Sincerely,
ff & =
L. T. Gucwa
JMF/sjb
Enclosure
c: w/o Enclosure
Georgia Power Company U.S. Nuclear Regulatory Commission ~
Mr. J. P. O'Reilly Dr. J. N. Grace, Regional Administrator
Mr. J. T. Beckham, Jr. Mr. P. Holmes-Ray, Senior Resident
Mr. H. C. Nix, Jr.
_
Inspector - Hatch
. _
_
ENCLOSURE CONTAINS SAFEGUARD INFORMATION
UPON SEPARATIUJN TH15 PAGE 15 ULCUNTRULLED
'
-
-
.
e
. _ .
__ . _ . . _ _ _ . _ . _ _ _ _ _ _ . _ _ . _ , . . . , _ . _ _ _ _ _ _. _. __ . _ _ _ _ _ , _ . _ _ _ . _ _ _ _ _ . . _ _ _ . _ ., _