ML17209B282

From kanterella
Revision as of 12:16, 24 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Updated LER 80-039/03L-1:on 800303,During Containment Isolation Valve Operability Test,Pressurized Liquid Space Sample Valve 1AOV-SS9355A Failed to Close.Caused by Excessively Tight Packing.Packing Readjusted
ML17209B282
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 04/24/1981
Revision: 0
From: BINGGELI B
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML16341B616 List:
References
LER-80-039-03L, LER-80-39-3L, NUDOCS 8105080292
Download: ML17209B282 (2)