EPID:L-2021-LLR-0031, American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code Request for Alternative IST RR 9 Proposed Alternative (Open) |
|
MONTHYEARML21117A3872021-04-26026 April 2021 American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code Request for Alternative IST RR 9 Proposed Alternative Project stage: Request ML21133A4912021-05-13013 May 2021 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, Proposed Alternative Request IST-RR-9 Project stage: Acceptance Review ML21244A3452021-09-20020 September 2021 Proposed Alternative IST RR 9 to the Requirements of the ASME OM Code for Test Plan Group 6 Relief Valves Project stage: Other ML22208A1952022-08-0303 August 2022 Summary of July 26, 2022, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Alternative Request for Excess Flow Check Valves at Monticello Nuclear Generating Plant Project stage: Meeting 2021-05-13
[Table View] |
|
---|
Category:Report
MONTHYEARCNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information WBL-23-018, Revised Pressure and Temperature Limits Report (PTLR)2023-04-10010 April 2023 Revised Pressure and Temperature Limits Report (PTLR) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu WBL-22-034, Update to Fire Protection Report Figures Redacted2022-08-0101 August 2022 Update to Fire Protection Report Figures Redacted WBL-21-057, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-12-16016 December 2021 Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report CNL-21-018, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance .2021-12-0909 December 2021 Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance . WBL-21-056, Revised Pressure and Temperature Limits Report (PTLR)2021-12-0909 December 2021 Revised Pressure and Temperature Limits Report (PTLR) ML21244A3452021-09-20020 September 2021 Proposed Alternative IST RR 9 to the Requirements of the ASME OM Code for Test Plan Group 6 Relief Valves CNL-21-055, Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-07-20020 July 2021 Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report CNL-21-040, Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)2021-03-23023 March 2021 Supplement to Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) ML21060A9132021-03-17017 March 2021 Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Watts Bar ISFSI CNL-21-011, Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)2021-02-25025 February 2021 Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) WBL-21-006, Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-02-11011 February 2021 Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report WBL-20-066, Revised Pressure and Temperature Limits Report (PTLR)2020-12-16016 December 2020 Revised Pressure and Temperature Limits Report (PTLR) CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User2020-12-16016 December 2020 10 CFR 71.95 Report for 3-60B Casks User CNL-20-074, Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2020-08-28028 August 2020 Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) WBL-20-004, Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program2020-04-16016 April 2020 Analysis of Capsule U from Watts Bar Unit 2 Reactor Vessel Radiation Surveillance Program CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2019-10-10010 October 2019 License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report2019-06-18018 June 2019 Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report L-19-026, Revised Pressure and Temperature Limits Report (PTLR)2019-04-0404 April 2019 Revised Pressure and Temperature Limits Report (PTLR) ML19039A0492019-02-0808 February 2019 Amd 1 to USAR Chapter 9 Auxiliary System NRC Additional Redactions ML19003A5692019-01-16016 January 2019 Review of the Fall 2017 Steam Generator Tube Inspection Report ML18242A0382018-08-30030 August 2018 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report CNL-18-092, Application to Revise the Technical Specifications to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (WBN-TS-18-02)2018-08-0101 August 2018 Application to Revise the Technical Specifications to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (WBN-TS-18-02) CNL-18-007, Seismic Probabilistic Risk Assessment Supplemental Information2018-04-10010 April 2018 Seismic Probabilistic Risk Assessment Supplemental Information ML17356A2692017-12-20020 December 2017 Construction Lessons Learned Report ML17313A1282017-11-0909 November 2017 Revised Pressure and Temperature Limits Report (PTLR) CNL-17-134, Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations2017-10-13013 October 2017 Transmittal of WCAP-18191-NP, Watts Bar Unit 2 Heatup and Cooldown Limit Curves for Normal Operation and Supplemental Reactor Vessel Integrity Evaluations ML17272A0192017-09-29029 September 2017 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report ML17263A1162017-09-20020 September 2017 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report ML17209A5542017-07-28028 July 2017 Cycle 14 Steam Generator Tube Inspection Report CNL-17-050, Submission of Technical Reports to Support a Public Meeting Regarding the Transition to the Reactor Oversight Process for the Mitigating Systems Performance Index2017-05-30030 May 2017 Submission of Technical Reports to Support a Public Meeting Regarding the Transition to the Reactor Oversight Process for the Mitigating Systems Performance Index ML16215A1042016-08-0202 August 2016 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System Report ML16113A0202016-04-22022 April 2016 Submittal of Title 10, Code of Federal Regulations 50.59 Summary Report CNL-16-038, Application to Revise Technical Specification 4.2.1, Fuel Assemblies and Radioactive Waste System Design Basis Source Term Supplement to Response to NRC Request for Additional Information2016-03-31031 March 2016 Application to Revise Technical Specification 4.2.1, Fuel Assemblies and Radioactive Waste System Design Basis Source Term Supplement to Response to NRC Request for Additional Information CNL-16-034, TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program2016-02-19019 February 2016 TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program CNL-15-263, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory2015-12-29029 December 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory CNL-15-204, Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit2015-09-21021 September 2015 Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit CNL-15-165, Submittal of Electromagnetic Interference (EMI) Survey Results2015-08-20020 August 2015 Submittal of Electromagnetic Interference (EMI) Survey Results CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report2015-07-31031 July 2015 the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report CNL-15-131, Individual Plant Examination of External Events (IPEEE) Report, Revision 32015-07-15015 July 2015 Individual Plant Examination of External Events (IPEEE) Report, Revision 3 CNL-15-106, 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information2015-07-0808 July 2015 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information CNL-15-097, Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-06-16016 June 2015 Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML15121A6562015-05-0101 May 2015 NRC Region II - CIB1 Watts Bar 2 Ip&S 194 Additional Questions Request List CNL-15-039, Severe Accident Management Alternatives for Reactor Coolant Pump Seals2015-04-10010 April 2015 Severe Accident Management Alternatives for Reactor Coolant Pump Seals CNL-15-043, Flood Hazard Reevaluation Report for Watts Bar, Response to NRC Request for Information Per Title 10 of CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc2015-03-25025 March 2015 Flood Hazard Reevaluation Report for Watts Bar, Response to NRC Request for Information Per Title 10 of CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid ML15030A5082015-01-30030 January 2015 Tritium Production Program, Updated Plans for Cycle 13 Operation and Updated Evaluation of the Radiological Impacts of Tritium Permeation Into the Reactor Coolant System CNL-14-212, Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2014-12-30030 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident 2024-01-03
[Table view] Category:Miscellaneous
MONTHYEARML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods WBL-22-034, Update to Fire Protection Report Figures Redacted2022-08-0101 August 2022 Update to Fire Protection Report Figures Redacted ML21244A3452021-09-20020 September 2021 Proposed Alternative IST RR 9 to the Requirements of the ASME OM Code for Test Plan Group 6 Relief Valves ML19003A5692019-01-16016 January 2019 Review of the Fall 2017 Steam Generator Tube Inspection Report ML18242A0382018-08-30030 August 2018 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report CNL-18-092, Application to Revise the Technical Specifications to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (WBN-TS-18-02)2018-08-0101 August 2018 Application to Revise the Technical Specifications to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (WBN-TS-18-02) CNL-18-007, Seismic Probabilistic Risk Assessment Supplemental Information2018-04-10010 April 2018 Seismic Probabilistic Risk Assessment Supplemental Information ML17313A1282017-11-0909 November 2017 Revised Pressure and Temperature Limits Report (PTLR) ML17272A0192017-09-29029 September 2017 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report ML17263A1162017-09-20020 September 2017 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report ML17209A5542017-07-28028 July 2017 Cycle 14 Steam Generator Tube Inspection Report ML16215A1042016-08-0202 August 2016 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System Report ML16113A0202016-04-22022 April 2016 Submittal of Title 10, Code of Federal Regulations 50.59 Summary Report CNL-16-038, Application to Revise Technical Specification 4.2.1, Fuel Assemblies and Radioactive Waste System Design Basis Source Term Supplement to Response to NRC Request for Additional Information2016-03-31031 March 2016 Application to Revise Technical Specification 4.2.1, Fuel Assemblies and Radioactive Waste System Design Basis Source Term Supplement to Response to NRC Request for Additional Information CNL-16-034, TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program2016-02-19019 February 2016 TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program CNL-15-263, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory2015-12-29029 December 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory CNL-15-165, Submittal of Electromagnetic Interference (EMI) Survey Results2015-08-20020 August 2015 Submittal of Electromagnetic Interference (EMI) Survey Results CNL-15-131, Individual Plant Examination of External Events (IPEEE) Report, Revision 32015-07-15015 July 2015 Individual Plant Examination of External Events (IPEEE) Report, Revision 3 CNL-15-106, 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information2015-07-0808 July 2015 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information ML15121A6562015-05-0101 May 2015 NRC Region II - CIB1 Watts Bar 2 Ip&S 194 Additional Questions Request List CNL-15-043, Flood Hazard Reevaluation Report for Watts Bar, Response to NRC Request for Information Per Title 10 of CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc2015-03-25025 March 2015 Flood Hazard Reevaluation Report for Watts Bar, Response to NRC Request for Information Per Title 10 of CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid CNL-14-212, Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2014-12-30030 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML14163A6582014-09-18018 September 2014 Closeout of Generic Letter, 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML14212A6032014-07-31031 July 2014 WBRD-50-391/86-60 - Final Report and Revised Completion Schedule IR 05000391/19860602014-07-31031 July 2014 WBRD-50-391/86-60 - Final Report and Revised Completion Schedule ML14149A1502014-06-16016 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14133A5422014-05-23023 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13246A0222013-08-28028 August 2013 Submittal of Pre-op Test Instruction ML13178A2812013-06-26026 June 2013 10 CFR 50.59 Summary Report Supplement ML13144A5762013-05-22022 May 2013 Watt Bar, Units 1 & 2, Report of Drug Testing Error in Accordance with 10 CFR 26.719(c)(1) ML13126A2942013-04-29029 April 2013 10 CFR 50.59 Summary Report ML13121A0602013-04-29029 April 2013 Commitment Summary Report ML13080A3632013-03-18018 March 2013 Enclosure 3, Summer 2011 Compliance Survey for Watts Bar Nuclear Plant Outfall Passive Mixing Zone ML13080A3662013-03-18018 March 2013 Enclosure 1, Summer 2010 Compliance Survey for Watts Bar Nuclear Plant Outfall Passive Mixing Zone ML13080A0732013-03-12012 March 2013 Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation.. ML13175A1352013-03-0505 March 2013 2-PTI-092-03, Revision 0, Nuclear Instrumentation Source Range Noise Checks During Hot Functional Testing. ML12356A3172012-12-17017 December 2012 Submittal of Pre-op Test Instruction, 2-PTI-063-06, Revision 0, Safety Injection System Check Valve Test. ML12335A3402012-11-27027 November 2012 Tennessee Valley Authority - Fleet Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Flooding Walkdown Results of Recommendation 2.3 of the Near-Term Task Force Review of ML13108A2842012-11-12012 November 2012 Unit 1, Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report ML13175A1362012-11-0808 November 2012 2-PTI-099-06, Revision 0, Reactor Protection Setpoint Verification. ML13175A1342012-11-0101 November 2012 2-PTI-082-02, Revision 0, Rod Control - Non Hft. ML13175A1332012-10-22022 October 2012 2-PTI-085-01, Revision 0, Rod Control Functional Test. ML12236A1642012-07-19019 July 2012 Enclosure 1 Evaluation of Proposed Changes Tennessee Valley Authority Watts Bar Nuclear Plant, Unit 1 ML12223A1832012-03-29029 March 2012 Environmental Protection Agency 2012 - Facility Detail Report - Environmental Facts Warehouse Fii - Moccasin Bend Wwtp ML11362A0562011-12-20020 December 2011 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 7 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 7 ML11341A1572011-11-30030 November 2011 Attachments 7 Through 9, WNA-CN-00157-WBT-NP, Revision 1, CAW-11-3316, and WBT-D-3566 Np, Incore Instrument System Signal Processing System Isolation Requirement ML11326A2842011-11-18018 November 2011 Commitment Summary Report ML11257A0502011-08-31031 August 2011 Attachment 7, WCAP-17427-NP, Rev. 1, Watts Bar Nuclear Plant Unit 2 Common Q Post Accident Monitoring System Computer Security Assessment, Attachment 8, Application for Withholding Proprietary Information from Public Disclosure and Attachme ML1104003852011-02-0707 February 2011 Enclosure 2, Appendix a, Hydrothermal Effects on the Ichthyhoplankton from the Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Outfall in Upper Chickamauga Reservoir ML1104003842011-02-0707 February 2011 Enclosure 1, Hydrothermal Effects on the Ichthyoplankton from Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Outfall in Upper Chickamauga Reservoir 2024-01-03
[Table view] |
Text
September 20, 2021 WATTS BAR NUCLEAR PLANT, UNIT 1 - AUTHORIZATION AND SAFETY EVALUATION FOR ALTERNATIVE REQUEST NO. IST-RR-9 (EPID L-2021-LLR-0031)
LICENSEE INFORMATION Recipients Name and Address: Mr. James Barstow Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801 Licensee: Tennessee Valley Authority Plant Name(s) and Unit(s): Watts Bar Nuclear Plant, Unit 1 Docket No(s).: 50-390 APPLICATION INFORMATION Submittal Date: April 26, 2021 Submittal Agencywide Documents Access and Management System (ADAMS)
Accession No.: ML21117A387 Applicable Inservice Inspection (ISI) or Inservice Testing (IST) Program Interval and Interval Start/End Dates: Third 10-Year IST Interval, October 19, 2016 to October 18, 2026 Alternative Provision: The applicant requested an alternative under Title 10 of the Code of Federal Regulations (10 CFR), Codes and standards, paragraph 50.55a(z)(2).
ISI or IST Requirement: American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code, Division 1, Mandatory Appendix I, lnservice Testing of Pressure Relief Devices in Light-Water Reactor Nuclear Power Plants, Section I-1350(a), Test Frequency, Classes 2 and 3 Pressure Relief Valves 10-Year Test Interval.
Applicable Code Edition and Addenda: ASME OM Code 2004 Edition through 2006 Addenda Brief Description of the Proposed Alternative: In accordance with 10 CFR 50.55a(z)(2),
Tennessee Valley Authority (TVA) requests Nuclear Regulatory Commission (NRC) approval of alternative request IST-RR-9 for Watts Bar Nuclear Plant (Watts Bar), Unit 1. This alternative request proposes a one-time extension of the test frequency for the Watts Bar, Unit 1 Test Plan Group 6 relief valves 1-RFV-62-1221, 1-RFV-62-1222, and 1-RFV-63-835.
The 2004 Edition through 2006 Addenda of the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code, Mandatory Appendix I, Subsection I-1350(a),
Test Frequency, Classes 2 and 3 Pressure Relief Valves 10-Year Test Interval, mandates, in part, that a minimum of 20 percent of the valves from each valve group shall be tested within any 48-month interval. Additionally, Code Case OMN-20, Inservice Test Frequency, permits a 6-month grace period for test frequencies that are greater than or equal to 2 years. Because of a change to the schedule for the upcoming Watts Bar, Unit 1 Cycle 17 refueling outage (U1R17) in the fall of 2021, TVA is requesting an approximate 6-week extension for the test frequency of these relief valves from the current late date of October 12, 2021, until no later than the end of U1R17, currently scheduled for November 27, 2021.
Compliance with Mandatory Appendix I, Subsection I-1350(a) would cause a hardship or unusual difficulty without a compensating increase in the level of quality or safety due to the need to perform a mid-cycle shutdown in order to perform the required testing. Therefore, TVA is submitting this alternative request in accordance with 10 CFR 50.55a(z)(2).
For additional details on the licensees request, please refer to the documents located at the ADAMS Accession Number identified above.
STAFF EVALUATION Subparagraph I-1350(a) of Mandatory Appendix I to the ASME OM Code mandates that Classes 2 and 3 relief valves shall be tested every 10 years. In addition, a minimum of 20 percent of the valves in a group shall be tested within any 48-month interval. Relief valves 1-RFV-62-1221, 1-RFV-62-1222, and 1-RFV-63-835 in Test Plan Group 6 are scheduled to be tested during U1R17; originally scheduled to begin September 18, 2021, and end October 18, 2021. Testing the three relief valves during this time period would meet the test interval in I-1350(a) after applying the 6-month grace extension allowed by Code Case OMN-20. The test interval would be 54 months.
The licensee changed the U1R17 schedule so that the refueling outage now begins on October 29, 2021 and ends on November 27, 2021. This means that the three valves will exceed the 54 month test interval by approximately 6 weeks and the licensee would have to perform a mid-cycle shutdown to test the valves and comply with Subparagraph I-1350(a) of Mandatory Appendix I. The NRC staff finds that performing a mid-cycle shutdown to test the three relief valves is a hardship.
The licensee requests to delay the testing of the three valves approximately 6 weeks so that the valves can be tested during U1R17. With this delay in testing, the three valves will still meet the requirement in Subparagraph I-1350(a) of Mandatory Appendix I that they be tested every 10 years. The licensee stated that five valves from Test Plan Group 6 were tested in 2017.
There was one failure in this test sample, and none of the three valves listed above were tested.
Also, the licensee stated that there have been 38 as-found set point tests performed for the Test Plan Group 6 valves since 1995, and there were three test failures. None of the failures involved the three valves listed above. The three valves listed above were last pressure tested in 2012, and all three valves were tested successfully.
Based on the information described above for relief valves 1-RFV-62-1221, 1-RFV-62-1222, and 1-RFV-63-835, identified in the licensees submittal, the NRC staff finds that (1) previous testing of these relief valves indicate their acceptable historical performance; (2) no current concerns with the performance of these relief valves have been identified; and (3) periodic maintenance activities are not modified by this request.
CONCLUSION The NRC staff has determined that complying with the specified requirements described in the licensees request referenced above would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The proposed alternative provides reasonable assurance that relief valves 1-RFV-62-1221, 1-RFV-62-1222, and 1-RFV-63-835 are operationally ready.
The NRC staff concludes that the licensee has adequately addressed the regulatory requirements set forth in 10 CFR 50.55a(z)(2).
The NRC staff authorizes the use of proposed alternative IST-RR-9 at Watts Bar, Unit 1, from October 12, 2021, until no later than the end of U1R17, currently scheduled for November 27, 2021.
All other ASME OM Code requirements for which an alternative was not specifically requested and approved remain applicable.
Principal Contributors: R. Wolfgang, NRR Y. Wong, NRR M. Farnan, NRR Date: September 20, 2021 Digitally signed by David J. David J. Wrona Date: 2021.09.20 Wrona 12:18:45 -04'00' David J. Wrona, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc: Listserv