|
---|
Category:FEDERAL REGISTER NOTICES
MONTHYEARML20206K4731999-04-27027 April 1999 Notice of Withdrawal of 981016 Application for Amend to FOL DPR-72 to Change CR-3 Fsar,Improved TSs & ITS Bases to Resolve Unreviewed Safety Question ML20196C3031998-11-24024 November 1998 Notice of Withdrawal of Application for Amend to Facility Operating License.Amend Would Revise CR3 TS Re Decay Heat Removal Requirements in Mod 4 ML20128H3981996-10-0707 October 1996 Notice of Issuance of Director'S Decision Re Action Taken on 960328 Petition for Action Under 10CFR2.206 Filed on Behalf of Bl Bennett Re Plant ML20125A4661992-11-27027 November 1992 Notice of Withdrawal of Application for Amend to License DPR-72.Proposed Amend Would Have Revised TS to Add New Action to Containment Air Lock Spec ML20248E7991989-09-25025 September 1989 Notice of Consideration of Issuance of Amend to License DPR-72 & Proposed NSHC Determination & Opportunity for Hearing.Amend Permits one-time Delay of 18-month Diesel Generator full-load Test Until Next Refueling Outage ML20245C8461989-04-20020 April 1989 Notice of Withdrawal of 840116 & 850329 Applications for Amends to License DPR-72 to Modify Tech Specs to Include silicon-controlled Rectifiers in Appropriate Surveillance & Test Sections ML20236T3031987-11-24024 November 1987 Notice of Consideration of Issuance of Amend to License DPR-72 & Proposed NSHC Determination & Opportunity for Hearing.Amend Changes Surveillance Requirement for Emergency Diesel Generator Loading DD-87-18, Notice of Issuance of Director'S Decision DD-87-18 Under 10CFR2.206 Denying Ucs Petition to Suspend B&W OLs & CPs1987-10-19019 October 1987 Notice of Issuance of Director'S Decision DD-87-18 Under 10CFR2.206 Denying Ucs Petition to Suspend B&W OLs & CPs ML20210Q0551986-05-0202 May 1986 Notice of Consideration of Issuance of Amend to License DPR-72 & Proposed NSHC Determination & Opportunity for Hearing.Amend Permits Plant Operation W/Redesigned Reactor Coolant Pump Supports ML20128G3701985-06-18018 June 1985 Notice of Consideration of Issuance of Amend to License DPR-72 & Proposed NSHC Determination & Opportunity for Hearing.Amend Resolves Conflicts Between Current Tech Specs & Commitments Re Low Temp Overpressurization Protection ML20062B2321978-07-24024 July 1978 Notice of Issuance of Amend 15 to License DPR-72 & Negative Declaration 1999-04-27
[Table view] Category:TEXT-CODE OF FEDERAL REGULATIONS
MONTHYEARML20206K4731999-04-27027 April 1999 Notice of Withdrawal of 981016 Application for Amend to FOL DPR-72 to Change CR-3 Fsar,Improved TSs & ITS Bases to Resolve Unreviewed Safety Question ML20196C3031998-11-24024 November 1998 Notice of Withdrawal of Application for Amend to Facility Operating License.Amend Would Revise CR3 TS Re Decay Heat Removal Requirements in Mod 4 ML20128H3981996-10-0707 October 1996 Notice of Issuance of Director'S Decision Re Action Taken on 960328 Petition for Action Under 10CFR2.206 Filed on Behalf of Bl Bennett Re Plant ML20125A4661992-11-27027 November 1992 Notice of Withdrawal of Application for Amend to License DPR-72.Proposed Amend Would Have Revised TS to Add New Action to Containment Air Lock Spec ML20248E7991989-09-25025 September 1989 Notice of Consideration of Issuance of Amend to License DPR-72 & Proposed NSHC Determination & Opportunity for Hearing.Amend Permits one-time Delay of 18-month Diesel Generator full-load Test Until Next Refueling Outage ML20245C8461989-04-20020 April 1989 Notice of Withdrawal of 840116 & 850329 Applications for Amends to License DPR-72 to Modify Tech Specs to Include silicon-controlled Rectifiers in Appropriate Surveillance & Test Sections ML20236T3031987-11-24024 November 1987 Notice of Consideration of Issuance of Amend to License DPR-72 & Proposed NSHC Determination & Opportunity for Hearing.Amend Changes Surveillance Requirement for Emergency Diesel Generator Loading DD-87-18, Notice of Issuance of Director'S Decision DD-87-18 Under 10CFR2.206 Denying Ucs Petition to Suspend B&W OLs & CPs1987-10-19019 October 1987 Notice of Issuance of Director'S Decision DD-87-18 Under 10CFR2.206 Denying Ucs Petition to Suspend B&W OLs & CPs ML20210Q0551986-05-0202 May 1986 Notice of Consideration of Issuance of Amend to License DPR-72 & Proposed NSHC Determination & Opportunity for Hearing.Amend Permits Plant Operation W/Redesigned Reactor Coolant Pump Supports ML20128G3701985-06-18018 June 1985 Notice of Consideration of Issuance of Amend to License DPR-72 & Proposed NSHC Determination & Opportunity for Hearing.Amend Resolves Conflicts Between Current Tech Specs & Commitments Re Low Temp Overpressurization Protection ML20062B2321978-07-24024 July 1978 Notice of Issuance of Amend 15 to License DPR-72 & Negative Declaration 1999-04-27
[Table view] |
Text
W -
( r -
l 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION FLORIDA POWER CORPORATION DOCKET NO. 50-302 NOTICE OF WITHDRAWAL OF APPLICATIONS FOR AMENDMENTS TO FACILITY OPERATING LICENSE The United States Nuclear Regulatory Comission (the Comission) has
~
granted the request of Florida Power Corporation (the licensee) to withdraw two applications for proposed amendments to Facility Operating License No. DPR-72 for the Crystal River Unit 3 Generating Plant, located in Citrus County, Florida.
One of the proposed amendments would have modified the facility Technical Specifications to include the silicon-controlled rectifiers in appropriate surveillance and test sections. The Comission previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on May23,1984(49FR21829). However, by . Proposed Changes Will Be Incorporated in Tech Spec Improvement Program|letter dated April 11, 1989]], the licensee withdrew the proposed change.
The other proposed amendment would have added operability and surveillance requirements for the reactor trip breaker shunt trip attachment. The Comission previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on November 30, 1988 (53 FR 48330). However, by . Proposed Changes Will Be Incorporated in Tech Spec Improvement Program|letter dated April 11, 1989]], the licensee withdrew the proposed change.
In both cases the licensee committed to incorporate the proposed changes consistent with NRC guidance in the Technical Specification Improvement Program (TSIP), and until approval of the TSIP submittal, to maintain operability requirements and surveillance procedures in accordance with current NRC guidance.
e904270416 890420
\ DR ADOCK0500g2 I
- a. .
For further details with respect to this action, see the applications for I amendments dated January 16, 1984 and March 29, 1985, respectively, and the licensee's letters dated April 11, 1989, which withdrew the applications for license amendnents. The~above documents are available for public inspection at the Comission's Public Document Room, 2120 L Street, N.W., Washington, D.C. , and at.the Crystal River Public Library, 668 N.W. First Avenue, Crystal River, Florida 32629.
Dated at Rockville, Maryland, this 20th day of April 1989.
FOR THE NUCLEAR EGULATORY COMhlSSION l
0 l
. a.v" b -
Harley Si er, Project Manager Project rectorate II-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation