ML993470345
From kanterella
ML993470345 | |
Person / Time | |
---|---|
Site: | Boiling Water Reactor Owners Group |
Issue date: | 12/10/1999 |
From: | Pulsifer R NRC/NRR/DLPM/LPD3 |
To: | Klapproth J General Electric Co |
References | |
Download: ML993470345 (4) | |
Similar Documents at Boiling Water Reactor Owners Group | |
---|---|
Category:Letter
MONTHYEARML14176A9612014-06-24024 June 2014
[Table view]Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML0924401762009-09-29029 September 2009 Cover Letter Transmitting the Draft Safety Evaluation of Boiling Water Reactors Owners' Group Topical Report NEDC-33347, Revision 0, Containment Overpressure Credit for Net Positive Suction Head (Npsh). ML0717106152007-07-18018 July 2007 Potential Adverse Flow Effects in Nuclear Power Plants ML0632502582006-11-16016 November 2006 Response to NRC Request for Additional Information Regarding TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action, Dated March 21, 2005 ML0612205532006-05-0303 May 2006 (Bwrog), (Rai), Topical Report (TR) SIR-05-044, Pressure Temperature Limits Report Methodology for Boiling Water Reactors, Revision 0 ML0601700492005-12-0909 December 2005 BWROG, Cover Letter ML0121102662001-07-30030 July 2001 Boiling Water Reactor Group, Ltr, NEDC-32988 Rev 2, Technical Justification to Support Risk-Informed Modification to Selected Required Action End States for BWR Plants, Request for Additional Informaiton (Tac No. MB1054) ML9935603731999-12-20020 December 1999 Request for Withholding Information from Public Disclosure ML9934703351999-12-10010 December 1999 Response to Letter Dated 06/18/1999 & Affidavit Dated 06/15/1999 Requesting That Topical Report NEDC-32900P, Be Withheld from Public Disclosure. NRC Has Determined That Submitted Information Should Be Withheld from Public Disclosure ML9934703451999-12-10010 December 1999 Request for Withholding Information from Public Disclosure Re Info Contained in GE 990820 Submittal of Procedure for Fuel Property & Performance Model Rev ML9935101791999-12-0808 December 1999 Letter Advising That NRC Determined Amendment 26 to GE Licensing Topical Report NEDE-24011-P-A, Gestar Submitted by August 13, 1999 Letter and Revised Pages to August 13, 1999 Submittal Should Be Withheld from Public Disclosure Pursuant to ML9934703021999-12-0808 December 1999 the Response to a Request for Additional Information Regarding Supplemental Information to GE Licensing Topical Report NEDC-32721P, Submitted by GE Nuclear Energy, Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.790(b)(5) ML9933502841999-12-0101 December 1999 Transmittal of Approved GE Licensing Topical Report NEDO-3229 1-A Supplement 1, System Analysis for the Elimination of Selected Response Time Testing Requirements Dated October 1999 ML9932301841999-11-10010 November 1999 Amendment 26 to GE Licensing Topical Report NEDE-24011-P-A, Gestar II - Implementing Improved GE STEADY-STATE Methods ML9932404071999-11-0808 November 1999 Letter Informing That Presentation Slides Entitled, Tracg Methodology for Application to BWR Transient Events, Will Be Withheld from Public Disclosure, as Requested by July 27, 1999 Letter ML9932404051999-11-0808 November 1999 Letter Informing That Presentation Slides Entitled GEs Thermal Power Optimization Program, Will Be Withheld from Public Disclosure, as Requested by September 16, 1999 Letter ML9931901101999-10-26026 October 1999 Assignment of New Project Manager for Boiling Water Reactor Owners Group and GE Nuclear Energy 2014-06-24 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML993470345&oldid=3278439"