ML993230184

From kanterella
Jump to navigation Jump to search

Amendment 26 to GE Licensing Topical Report NEDE-24011-P-A, Gestar II - Implementing Improved GE STEADY-STATE Methods
ML993230184
Person / Time
Site: Boiling Water Reactor Owners Group
Issue date: 11/10/1999
From: Richards S
NRC/NRR/DLPM/LPD4
To: Watford G
General Electric Co
References
TAC MA6481
Download: ML993230184 (3)


Text

Mr. Glen A. Watford, Manager Nuclear Fuel Engineering GE Nuclear Energy P. 0. Box 780 Wilmington, NC 28402

SUBJECT:

November 10, 1999 AMENDMENT 26 TO GE LICENSING TOPICAL REPORT NEDE-2401 1-P-A, "GESTAR I'" - IMPLEMENTING IMPROVED GE STEADY-STATE METHODS (TAC NO. MA6481)

Dear Mr. Watford:

By letter dated October 22, 1999, General Electric Nuclear Energy (GENE), submitted a request for review of Amendment 26 to GESTAR as a standard amendment. GESTAR Amendment 26 was submitted by letter dated August 13, 1999, as an administrative change, and involved three areas. These areas were: (1) clarifying classification of BWR 6 pressure regulator failure downscale event; (2) implementing improved General Electric (GE) steady-state methods; and (3) incorporation of Boiling Water Reactor Owners Group (BWOG) approved stability options.

This submittal was later supplemented by letters of September 17 and October 14, 1999. The NRC staff has reviewed Item 2 of the submittal, in relation to the GE improved steady-state methods, and has prepared the enclosed safety evaluation. We find Item 2 of the proposed Amendment 26 is acceptable, as discussed in the safety evaluation. Items 1 and 3 will be addressed under a separate cover letter.

Sincerely, Original Signed By:

Stuart A. Richards, Director Project Directorate IV and Decommissioning Division of Licensing Project Management Office of Nuclear Regulator Regulation Project No. 691

Enclosure:

Safety Evaluation cc w/encl: See next page DISTRIBUTION:

File Center PUBLIC PDIV-2 Reading SRichards RScholl (e-mail SE a V

ACRS OGC EKenderick

  • See previous concurrence I o receive a copy ot tills document, indicate 77, in the box OFFICE PDIII/2/PM C PDIV-2/LA C PDIV_2/SC PDIV/PD NAME RPulsifer:am*

E. Peyton

  • SDembek*

SRichards DATE 11/9/99 11/8/99 11/ 9/99 11/10/99

, UIWIEN I AIV-.: L:IP'IIII FICAULIIRIECOEa.wpd OFFICAL RECORD ONLY cr) Fý

La. A' cc w/encl: See next page

'YA UNITED STATES

,0 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 10, 1999 Mr. Glen A. Watford, Manager Nuclear Fuel Engineering GE Nuclear Energy P. O. Box 780 Wilmington, NC 28402

SUBJECT:

AMENDMENT 26 TO GE LICENSING TOPICAL REPORT NEDE-24011-P-A, "GESTAR 11" - IMPLEMENTING IMPROVED GE STEADY-STATE METHODS (TAC NO. MA6481)

Dear Mr. Watford:

By letter dated October 22, 1999, General Electric Nuclear Energy (GENE), submitted a request for review of Amendment 26 to GESTAR as a standard amendment. GESTAR Amendment 26 was submitted by letter dated August 13, 1999, as an administrative change, and involved three areas. These areas were: (1) clarifying classification of BWR 6 pressure regulator failure downscale event; (2) implementing improved General Electric (GE) steady state methods; and (3) incorporation of Boiling Water Reactor Owners Group (BWOG) approved stability options. This submittal was later supplemented by letters of September 17 and October 14, 1999. The NRC staff has reviewed Item 2 of the submittal, in relation to the GE improved steady-state methods, and has prepared the enclosed safety evaluation. We find Item 2 of the proposed Amendment 26 acceptable, as discussed in the safety evaluation.

Items 1 and 3 will be addressed under a separate cover letter.

Sincerely, Stuart A. Richards, Director Project Directorate IV and Decommissioning Division of Licensing Project Management Office of Nuclear Regulator Regulation Project No. 691

Enclosure:

Safety Evaluation

Boiling Water Reactor Owners Group Project No. 691 cc:

Mr. W. Glenn Warren BWR Owners' Group Chairman Southern Nuclear Company 42 Inverness Parkway PO Box 1295 Birmingham, AL 35201 Mr. James M. Kenny BWR Owners' Group Vice Chairman PP&L, Inc.

Mail Code GENA6-1 Allentown, PA 18101-1179 Mr. Thomas J. Rausch RRG Chairman Commonwealth Edison Company Nuclear Fuel Services 1400 Opus Place, 4th Floor Downers Grove, IL 60515-5701 Mr. Drew B. Fetters PECO Energy Nuclear Group Headquarters MC 61A-3 965 Chesterbrook Blvd.

Wayne, PA 19087-5691 Mr. H. Lewis Sumner Southern Nuclear Company 40 Inverness Parkway PO Box 1295 Birmingham, GA 35201 Mr. Carl D. Terry Vice President, Nuclear Engineering Niagara Mohawk Power Corporation Nine Mile Point - Station OPS Bldg/2nd Floor PO Box 63 Lycoming, NY 13093 Mr. George T. Jones PP& L, Inc.

MC GENA6-1 Two North Ninth Street Allentown, PA 18101 Mr. John Kelly New York Power Authority 14th Floor Mail Stop 14K Centroplex Building 123 Main Street White Plains, NY 10601 Mr. Thomas G. Hurst GE Nuclear Energy M/C 182 175 Curtner Avenue San Jose, CA 95125 Mr. Thomas A. Green GE Nuclear Energy M/C 182 175 Curtner Avenue San Jose, CA 95125