ML20234E817

From kanterella
Revision as of 12:18, 5 August 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Issuance of CPPR-145 & CPPR-146 to Gulf States Utils Co for Const of Two BWR in West Feliciana Parish,La
ML20234E817
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 03/25/1977
From: Valga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20234E555 List:
References
FOIA-87-873 NUDOCS 8801110184
Download: ML20234E817 (3)


Text

-

UNITED STATES NUCLEAR REGJIA'IORY COMMISSICN DOCKET NOS. 50-458 AND 50-459 GULF STATES UTILITIES 0]MPANY (RIVER BEND STATICN, UNM51 AND 2)

NCrrICE OF' ISSUANCE OF OCNSTRUCTICN PERMITS Notice is hereby given that, pursuant to Partial Initial Decisions, dated September 2,1975, Septenber 2,1976, and February 3,1977, all issued by the Atomic Safety an3 Licensing Board, and Memotandum and Order issued by the Atomic Safety and Licensing Appeal Board on March 22, 1977, the Nuclear Pegulatory Ccanission (the Coninission) has issued Construction Permits Nos. CPPR-145 and CPPR-146 to the Gulf States Utilities Company for construction of two boiling water nuclear reactors at the applicant's site in West Feliciana Parish, touisiana.

'Ihe proposed reactors, known as the River"Bsnd Station, Units 1 and 2 (the facilities), are each designed for a rated power of 2894 megawatts thermal with a net electrical output of 934 megawatts.

'Ihe Partial Initial Decisions set forth above are under review by an Atanic Safety ard Licensing A; peal Board and are thus not final.

Any decision or action taken by the Atanic Safety aM Licensing Appeal i Board in connection with the Initial Decisions may be reviewed by the Ccmnission.

i

~

8801110184 880105 PDR FOIA PEMBROK87-873 PDR

{. .

l

\

We Ccnn nsion has made appropriate findings as required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and registions in 10 CPR Chapter I, which are set forth in the i

construction permits. %e application for the constrxtion permits j complies with tne standards and requirements of the Act and the Commission's I rules and rectLations.

%e constextion permits are effective as of their dates of l

)

issuance. The earliest date for completion of Unit 1 is_ March 31, 1981, j l

and the latest date for completion is March 31, 1983. The earliest date for completim of Unit 2 is March 31, 1983, and the latest date for

)

completion is Miarch 31, 1985. The permits shall expire on the latest dates for ampLetion of the facilities.

A copy cf 11) the Partial Initial Decisions dated Septenber 2, 1975, Septaarer 2,1976, and February 3,1977, and the Appeal Board Mertorandum a:d Order dated March 22, 1977; (2) Construction Permits i l

Nos. CPPR-145 and CPPR-146; (3) the report of the Advi.sory Comnittee I on Reactor Safeguards, dated January 14, 1975; (4) the Office of Nuclear Reactor Regulation's Safety Evaluation Report dated September 1974, and 9mimts 1 and 2 thereto, dated Decenber 1974, and December 1975, respectively; (5) the Preliminary Safety Analysis Report and amendments thereto; (6) the Applicant's Environmen:tal Report dated Septard=r 1973, and supplements thereto; (7) the Draft Environmental Statement dated June 1974; and (8) the Final Environmental Statement dated Septan **r 1974, are available for public inspection at the Comnission's Putnic Doctznent Room at 1717 H Street, N. W., Washington

(

4

7. . .

6 D. C., the Audubon Library, West Feliciana Branch, Ferdinand Street, i

St. Francisville, Louisiana 707'5, and the Government Documents Department, Louisiana State Uni.Trsity, Baton Rouge, touisiana 70803.

L A copy of the construction permits may be obtained upon request addressed j to the U. S. Nuclear kgulatory Commission, Washington, D. C. 20555, <

);

l Attention: Director, Division of Project Management. }

Dated at Bethesda, Maryland, this 2, ay of March,1977.

I FOR THE NUCIZAR REGULA70RY CON 4ISSIOE OdyrPl ti Ied by StehbYk afga, Chief l

l Light Water Reactors Branch No. 4 )

Division of Project Management ]

1 I

I l

l l

1 s

l 1

i