BECO-87-099, Number of Personnel & Man-REM by Work & Job Function,1986

From kanterella
Revision as of 10:34, 27 July 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Number of Personnel & Man-REM by Work & Job Function,1986
ML20214W810
Person / Time
Site: Pilgrim
Issue date: 12/31/1986
From: Bird R
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-87-099, BECO-87-99, NUDOCS 8706160192
Download: ML20214W810 (5)


Text

_ . . __ __ _ _ _ . . . - __ . _ _ _ . . . .- _ __ _ _ _ _ _. _ _ - __ . .- - _ . _ . _ _

NUMBER OF PERSONNEL AND MAN-REM BY HORK AND JOB FUtlCTION 1986 j

-PLAtlT: PILGRIM (BUR) l NUMBER OF PERS0flNEL (>100 m-rem) TOTAL MAN-REMS STATION UTILITY CONTRACT TOTAL STATIO!! UTILITY CONTRACT TOTAL-EMPLOYEES L OTHERS PERSONS EMPLOYEES EMPLOYEES & OTHERS MAN-REMS HORK L JOB FUNCTION EMPLOYEES REACTOR OPERATIONS & SURV.

0 1 9 0.623 0.175 18.790 MAINTENANCE PERSONNEL 16 12 1 21.501 4.733 0.716 OPERATING PERSONNEL 6 1 9 11.335 0.484 26.484 HEALTH PHYSICS PERS0tlNEL 4 0 5 1.849 0.026 2.204 SUPERVISORY PERSONNEL 2 3 3 0.644 0.628 0.819 ENGINEERING PERSONNEL

~

28 17 27 72 35.952 6.046 49.013 91.011 TOTAL liOUTINE MAINTENANCE '

54 1 405 29.824 0.221 274.834 MAINTENANCE PERSONNEL 30 11 10 6.860 3.414 5.258 l OPERATING PERSONNEL 24 4 100 7.574 1.190 46.407-ilEALTil PHYSICS PERSONNEL 23 5 10 6.474 1.406 3.868 SUPERVISORY PERSONNEL 13 7 31 3.512 4.285 17.814 ENGINEERING PERSONNEL

~

144 28 556 728 54.244 10.516 348.181 412.941 TOTAL l

iN-SERVICE ItiSPECTION 0 0 72 0.314 0.005 33.331 MAINTENANCE PERSONilEL 0 2 9 0.041 0.366 9.095 OPERATING PERSONNEL 0 ~0 17 0.000 0.041 6.290 HEALTH PHYSICS PER50tlNEL 0 0 0 0.041 0.010 0.196 SUPERVISORY PERSONNEL i 1 6 0.391 0.232 @.172 ENGINEERING PERSONNEL b 3 104 108 0.787 0.654 52.084 53.525 TOTAL SPECIAL MAINTENANCE 22 0 44 7.447 0.000 92.139 MAINTENANCE PERSONNEL l- 0 0 0.603 0.299 0.000 l h OPERATING PER50tlNEL 3 0 6 0.917 0.036 1.499 m HEALTH PHYSICS PERSONNEL 1.465 0.108 1.262 3 0 2 m SUPERVISORY PERSONNEL 3 0 1 1.082 0.335 0.237 e ENGINEERING PERSONNEL 0 53 85 11.514 0.778 95.137 107.429 TOTAL 32 8706160192 861231 PDR ADOCM 05000293 R PDR ^ ~

\ -_, .

Y NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION (CONT.)

1986 b, PLANT: PILGRIM (BWR)

TOTAL MAN-REMS NUMBER OF PERSONNEL (>100 m-rem)

TOTAL STATION UTILITY CONTRACT TOTAL STATION UTILITY CONTRACT

& OTHERS PERSONS EMPLOYEES EMPLOYEES & OTHERS MAN-REMS WORK L JOB FUNCTION EMPLOYEES EMPLOYEES HASTE PROCESSING 25.101 2 0 74 1.221 0.021 MAINTENANCE PERSONNEL 0.906 9 0 4 2.930 0.031 OPERATING PERSONNEL 8.023 9 0 34 3.615 0.149 HEALTH PHYSICS PERSONNEL 0.103 0.448 0 0 2 0.158 SUPERVISOR PERSONNEL 0.015 0.798 0 0 4 0.052 ENGINEERING PERSONNEL 0 118 138 7.976 0.319 35.276 43.571 TOTAL 20 REFUELING 9.548 0 0 0 0.082 0.000 MAINTENANCE PERSONNEL 1.138 0 0 0 0.021 0.026 OPERATING PERSONNEL 2.034 0 0 0 0.046 0.031 HEALTH PHYSICS PERSONNEL 0.000 0.288 0 0 0 0.000 SUPERVISORY PERSONNEL 0.242 0 0 0 0.000 0.000 ENGINEERING PERSONNEL 0 0 0 0.149 0.057 13.250 13.456 TOTAL 0 TOTAL BY JOB FUNCTION 0.422 453.743 493.676 78 2 604 684 39.511 MAINTENANCE PERSONNEL 17.113 57.938 56 25 24 105 31.956 8.869 OPERATING PERSONNEL 1.931 90.737 116.155-42 5 166 213 23.487 HEALTH PHYSICS PERSONNEL 8.266 19.906 30 5 19 54 9.987 1.653 SUPERVISORY PERSONNEL 5.495 23.082 34.258 19 11 45 75 5.681 ENGINEERING PERSONNEL 48 858 1,131 110.622 18.370 592.941 721.933 GRAND TOTAL 225

  • THE TOTAL NUMBER OF PERSONNEL IS HIGHER THAN THE
  • TRUE TOTAL DUE TO SOME INDIVIDUALS BEING REPORTED UNDER MORE THAN ONE CATEGORY.

~^

. ((

L~J 80STGVN Executive Offices 800 Boylston Street Boston, Massachusetts 02199 June 9, 1987 Ralph G. Bird BECo 87-099 Senior Vice President - Nuclear License DPR-35 Docket 50-293 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Reg. Guide 1.16 Annual Report

Dear Sir:

, In accordance with the reporting requirements of Pilgrim Nuclear Power Station i

Technical Specification 6.9.A.3, attached is the Regulatory Guide 1.16 annual report of personnel and man-rem exposure by job function.

Ylb R. G.hN&.

Bird --

GGH/ pac cc: U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station l l

l l

l Ygby

Attachment to 1986 U. S. NRC Reaulatory Guide 1.16 Renort

{ The collective dose measured by TLD for the Pilgrim Nuclear Power Station for t calendar year 1986 totalled 874.359 Person-Rem. The collective dose measured by TLD for station, utility and contractor personnel who were assigned to

radiation work permits during 1986 totalled 721.933 Person-Rem.

U. S. NRC Regulatory Guide 1.16 suggests that at least 80 percent of the total whole body dose received from external sources be assigned to specific

, major work functions. The collective dose accrued for individuals assigned to  :

specific major work functions versus the total collective dose measured by Pilgrim Station for 1986 was determined to be 82.6 percent.

f

'l i -

i i  ;

,i ,

h 1

I I

I l

l -

i i

i i

i r

REGULATORY GUIDE 1.16 JOB FUNCTION CATEGORIES 3

i The following information is offered in an effort to clarify Reg. Guide,l.16 job function categories: ,

Reactor Operations and Surveillances i

All extended RWPs, operator tours, inspections, surveillances, valve manipulations, etc.

Routine Maintenance

! All I&C surveillances and most maintenance functions.

I

In Service Inspections

! Erosion / corrosion inspections, weld inspections, component support

! Inspections, pressure tests and trevitesting.

Special Maintenance

TMI modifications, fire' protection, NRC mandated items or'other non-routine maintenance work.-

Waste Processinq

]

! Dlatomaceous earth and resin transfers, most work associated with the Radwaste j Truck Lock. All shipments and preparations of radioactive waste. i Refueling .

i Work performed on the 117' elevation from the shleid block removal to the' i re-installation of the shleid blocks after the refueling itself if it is a part of the refueling process (Feedwater Sparger Replacement is Special

Maintenance).

i i

i I