ML20135D172
| ML20135D172 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 12/31/1996 |
| From: | BOSTON EDISON CO. |
| To: | |
| Shared Package | |
| ML20135D169 | List: |
| References | |
| NUDOCS 9703050104 | |
| Download: ML20135D172 (2) | |
Text
_.
NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION ALL PERSONNEL
- TOTAL MAN-REM Station I
Utility Contractors Station Utility Contractors WORK & JOB FUNCTION Employees Employees and Others Employees Employees and Others REACTOR OPERATION &
SURVEILLANCES
-Maintenance 28 11 18 1.083 0.473 0.360
-Operations Personnel 69 1
81 14.334 0.203 2.766
-Health Physics 24 0
0 1.399 0.000 0.000
-Supervisory Personnel 17 1
3 0,945 0.017 0.036
-Engineering Personnel 12 2
1 0.796 0.001 0.001 ROUTINE MAINTENANCE
-Maintenance 144 59 289 43.814 6.131 11.150
-Operations Personnel 74 7
30 7.732 0.052 0.515
-Health Physics 44 3
26 13.510 0.008 1.734
-Supervisory Personnel 104 11 54 7.151 0.561 0.453
-Engineering Personnel 110 22 61 4.333 0.502 1.910 INSERVICE INSPECTION
-Maintenance 2
0 44 0.112 0.000 5.726
-Operations Personnel 0
0 0
0.000 0.000 0.000
-Health Physics 0
0 1
0.000 0.000 0.I10
-Supervisory Personnel 4
0 3
0.063 0.000 0.614
-Engineering P,7sonnel 9
0 4
0.654 0.000 1.863 SPECIAL MAINTENANCE * * *
-Maintenance 12 4
47 0.077 0.053 0.691
-Operations Personnel 20 0
1 0.152 0.000 0.003
-Health Physics 11 0
0 0.241 0.000 0.000
-Supervisory Personnel 7
0 6
0.084 0.000 0.048
, -Engineering Personnel 3
1 7
0.105 0.002 0.030 9703050104 970226 PDR ADOCK 05000293 R
PDR.
i
-_ALL PERSONNEL TOTAL MAN-REM Station Utility Contractors 5tatic.,
Utility Contractors WORK & JOB FUNCTION Employees Employees and Others l Employees Employees and Others WASTE PROCESSING
-Maintenance 36 7
5 0.376 0.107 0.042
-Operations Personnel 12 1
1 0.906 0.I14 0.009
-Health Physics 28 0
1 1.055 0.000 0.013
-Supervisory Personnel 6
0 0
0.245 0.000 0.000
-Engineering Personnel 1
0 1
0.462 0.000 0.000 REFUELING j
-Maintenance 79 37 3
1.088 0.532 0.003
-Operations Personnel 26 0
1 0.123 0.000 0.003
-Health Physics 20 0
1 0.206 0.000 0.000
-Supervisory Personnel 8
0 0
0.106 0.000 0.000
-Engineering Personnel 10 2
6 0.202 0.001 0.025 TOTALS BY JOB FUNCTION
-Maintenance 301 118 406 46.549 7.296 17.972
-Operations Personnel 201 9
114 23.247 0.369 3.296
-Health Physics 127 3
29 16.412 0.008 1.858
-Supervisory Personnel 146 12 66 8.594 0.578 1.151 4
-Engineering Personnel 145 27 80 6.553 0.506 3.829
-_R_ A_ _N_D_T_O_T_A_L_S_* *__ _ _ _ _ _ _ _ __ _ _ _92_0_ _ _ _ _ _ _ _1_6_9_ _ _ _ _ _ _ _6_9_5_ _ _ _ _ __ _ _
G Workers may be counted in more than one category.
Total dose by self-indicating dosimeter is 138.215. Actual record dose by TLD is 115.569.
GL 89-10 MOV work Boraflex Testing ofFuel Racks ECCS Suction Strainers Radwaste System Walkdowns i
iauniu v
w-
-