(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARDCL-98-066, Suppl to LAR 98-04 to Licenses DPR-80 & DPR-82,replacing Requirement for Operations Manager to Hold SRO License W/ Allowance,Operations Middle Manager Hold SRO License & Responsible for Directing Work of Shift Personnel1998-05-0101 May 1998 Suppl to LAR 98-04 to Licenses DPR-80 & DPR-82,replacing Requirement for Operations Manager to Hold SRO License W/ Allowance,Operations Middle Manager Hold SRO License & Responsible for Directing Work of Shift Personnel DCL-98-028, Supplemental Application for Amends to Licenses DPR-80 & DPR-82,changing Surveillance Frequency for Several TS from at Least Once Every 18 Months to at Least Once Per Refueling Interval1998-04-15015 April 1998 Supplemental Application for Amends to Licenses DPR-80 & DPR-82,changing Surveillance Frequency for Several TS from at Least Once Every 18 Months to at Least Once Per Refueling Interval ML20045H6481993-07-0707 July 1993 License Amend Request 93-04 to Licenses DPR-80 & DPR-82, Revising TS 5.1.3, Map Defining Unrestricted Areas & Site Boundary for Radioactive Gaseous & Liquid Effluents for Consistency W/Interpretation of Restricted Area Per 10CFR20 ML16342B9791993-05-0707 May 1993 License Amend Request 93-01 to Licenses DPR-80 & DPR-82, Changing TS 3/4.3.3.5, Remote Shutdown Instrumentation, to Add Remote Shutdown Control Functions & Increase Allowed Outage Time for Inoperable Function from 7 to 30 Days ML16341F8541990-10-18018 October 1990 Application for Amends to Licenses DPR-80 & DPR-82,revising Section 3/4.2.4, Quadrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map ML16341F8521990-10-18018 October 1990 Application for Amends to Licenses DPR-80 & DPR-82.Amends Revise Tech Spec 3/4.2.4, Quadrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map DCL-89-226, Application for Amends to Licenses DPR-80 & DPR-82,revising Tech Specs 3.4.2.1,3.4.2.2,Table 3.7-2 & Associated Bases for Pressurizer & Main Steam Line Safety Valves1989-09-0606 September 1989 Application for Amends to Licenses DPR-80 & DPR-82,revising Tech Specs 3.4.2.1,3.4.2.2,Table 3.7-2 & Associated Bases for Pressurizer & Main Steam Line Safety Valves ML20063P8521982-10-12012 October 1982 Suppl to 820719 Application for Amend to License DPR-76 Re Security Plan.Encl Withheld (Ref 10CFR73.21) ML20065F7791982-09-17017 September 1982 Application to Amend License DPR-76,revising Security Plan. Safeguards Info Deleted ML16341B4151980-08-28028 August 1980 Amend 85 to OL Application,Including Matl for FSAR Chapters 4,13,14 & 17 ML19263C1721979-02-0505 February 1979 Amends 75 & 76 to License Application.Includes Matl for Chapters 4,4A & 10 of Hosgri Seismic Evaluation ML20083K8871979-01-25025 January 1979 Amend 74 to License Application.Removes & Inserts Matl Re FSAR Chapter 13 ML20150C3301978-11-15015 November 1978 Amend 72 & Amend 73 to Oper Lic Appl W/Addl Matl for Hosgri Seismic Eval & Fsar,Respectively 1998-05-01
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARDCL-98-066, Suppl to LAR 98-04 to Licenses DPR-80 & DPR-82,replacing Requirement for Operations Manager to Hold SRO License W/ Allowance,Operations Middle Manager Hold SRO License & Responsible for Directing Work of Shift Personnel1998-05-0101 May 1998 Suppl to LAR 98-04 to Licenses DPR-80 & DPR-82,replacing Requirement for Operations Manager to Hold SRO License W/ Allowance,Operations Middle Manager Hold SRO License & Responsible for Directing Work of Shift Personnel DCL-98-028, Supplemental Application for Amends to Licenses DPR-80 & DPR-82,changing Surveillance Frequency for Several TS from at Least Once Every 18 Months to at Least Once Per Refueling Interval1998-04-15015 April 1998 Supplemental Application for Amends to Licenses DPR-80 & DPR-82,changing Surveillance Frequency for Several TS from at Least Once Every 18 Months to at Least Once Per Refueling Interval ML20045H6481993-07-0707 July 1993 License Amend Request 93-04 to Licenses DPR-80 & DPR-82, Revising TS 5.1.3, Map Defining Unrestricted Areas & Site Boundary for Radioactive Gaseous & Liquid Effluents for Consistency W/Interpretation of Restricted Area Per 10CFR20 ML16342B9791993-05-0707 May 1993 License Amend Request 93-01 to Licenses DPR-80 & DPR-82, Changing TS 3/4.3.3.5, Remote Shutdown Instrumentation, to Add Remote Shutdown Control Functions & Increase Allowed Outage Time for Inoperable Function from 7 to 30 Days ML16341F8541990-10-18018 October 1990 Application for Amends to Licenses DPR-80 & DPR-82,revising Section 3/4.2.4, Quadrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map ML16341F8521990-10-18018 October 1990 Application for Amends to Licenses DPR-80 & DPR-82.Amends Revise Tech Spec 3/4.2.4, Quadrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map DCL-89-226, Application for Amends to Licenses DPR-80 & DPR-82,revising Tech Specs 3.4.2.1,3.4.2.2,Table 3.7-2 & Associated Bases for Pressurizer & Main Steam Line Safety Valves1989-09-0606 September 1989 Application for Amends to Licenses DPR-80 & DPR-82,revising Tech Specs 3.4.2.1,3.4.2.2,Table 3.7-2 & Associated Bases for Pressurizer & Main Steam Line Safety Valves ML20153E5271988-08-29029 August 1988 Amends 31 & 30 to Licenses DPR-80 & DPR-82,respectively, Decreasing Max Closure Time for Containment Vacuum/Pressure Relief Valves from 10 to 5 ML20063P8521982-10-12012 October 1982 Suppl to 820719 Application for Amend to License DPR-76 Re Security Plan.Encl Withheld (Ref 10CFR73.21) ML20065F7791982-09-17017 September 1982 Application to Amend License DPR-76,revising Security Plan. Safeguards Info Deleted ML16341B4151980-08-28028 August 1980 Amend 85 to OL Application,Including Matl for FSAR Chapters 4,13,14 & 17 ML19263C1721979-02-0505 February 1979 Amends 75 & 76 to License Application.Includes Matl for Chapters 4,4A & 10 of Hosgri Seismic Evaluation ML20083K8871979-01-25025 January 1979 Amend 74 to License Application.Removes & Inserts Matl Re FSAR Chapter 13 ML20150C3301978-11-15015 November 1978 Amend 72 & Amend 73 to Oper Lic Appl W/Addl Matl for Hosgri Seismic Eval & Fsar,Respectively ML20236P4231976-05-25025 May 1976 Application for Extension of CPPR-39 from 760701 to 770101 ML20028D9671975-05-19019 May 1975 Application to Amend CPPR-39 & CPPR-69 Extending Const Completion Date to 760701 & 770731,respectively 1998-05-01
[Table view] |
Text
'
. ' Pacific Gas and Electric Company 245 Market Street. Room 937-N9B Gregory M. Rueger San Francisco. CA 94105 Senor Vice President and
.sta:Img .1ddnu General Manager Mad Code N90 Nuclear Power Generation
. . P.O. Box 770000 San Francisco, CA 94177 415973-4684 Fax 415973-2313 May 1,1998 PG&E Letter DCL-98-066 l
U.S. Nuclear Regulatory Commission I ATTN: Document Control Desk Washington, DC 20555 4 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Supolement to LAR 98-04. " Revision of TS 6.2.2a. and 6.3 to Eliminate Reauirement for the Operations Manaaer to Hold a Senior Reactor Operator License"
Dear Commissioners and Staff:
l On April 10,1998, PG&E submitted License Amendment Request (LAR) 98-04, j
" Revision of TS 6.2.2g. and 6.3 to Eliminate Requirement for the Operations Manager to Hold a Senior Reactor Operator License," in PG&E Letter l DCL-98-052. LAR 98-04 proposes to replace the requirement that the Operations Manager hold a senior reactor operator (SRO) license with the allowance that an Operations middle manager hold an SRO license and be responsible for directing the work of shift personnel.
During an April 28,1998, telephone call the NRC project manager for Diablo Canyon Power Plant indicated that during the NRC review of LAR 98-04, they had concluded that the wording of the proposed Technical Specification (TS) could be interpreted to allow the Operations middle manager position to be a rotational position. PG&E indicated that it did not intend to use the Operations middle manager position as a rotational assignment, but chose the proposed wording for the TS because the title of the position had not yet been identified.
Alternative wording of the proposed TS is provided. it is PG&E's understanding that the proposed TS included with this submittal will resolve the NRC's concerns.
r 9805060353 980501 P P
PDR ADOCK 05000275 N py ;
j }.
.~ ox
,JvAvd C
Docunpnt Control Desk PG&E Letter DCL-98-066 May 1,1998 Page 2 I . .
Replacement TS pages are attached. These pages replace the TS pages submitted as part of DCL-98-052. This submittal does not affect the conclusions of the safety evaluation or the no significant hazards consideration determination performed for LAR 98-04, Although PG&E requested that the LAR be assigned a medium priority, PG&E would like the additional flexibility provided by the LAR as soon as possible.
Sincerely, f
f tLff Wf -
Gregory M. Rueger Subscribed and sworn to before me Attorneys for Pacific Gas j this 1st day of May,1998 and Electric Company i Roger J. Peters l Richard F. Locke
[4 E)q ~
Notary Public F Richard F. Locke i cc: Edgar Bailey, DHS Steven D. Bloom James E. Dyer "^---~m .mm Kenneth E. Perkins DANA LOPEZ 0M
[
David L. Proulx ednyPudfcNb 3 Diablo Distribution j
-~----~~_
w@fl$'g f ___
Attachments PTN/
f- s