(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:OPERATOR TRAINING/REQUALIFICATION PROGRAM
MONTHYEARML20065K7541990-11-0101 November 1990 Rev 5 to Adminstriative Procedure AP-09, Reactor Operator/ Senior Reactor Operator Requalification ML20215F9861986-12-16016 December 1986 Rev 3 to Administrative Procedure AP-07, Review of Procedures ML20215F9731986-12-15015 December 1986 Rev 3 to Administrative Procedure AP-09, Reactor Operator/ Senior Reactor Operator Requalification ML20211G9641986-10-27027 October 1986 Rev 2 to Administrative Procedure AP-09, Reactor Operator/ Senior Reactor Operator Requalification 1990-11-01
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212E7211999-06-30030 June 1999 Ohio State Univ Research Reactor Annual Rept for FY98/99. with ML20153E0961998-09-30030 September 1998 Oh State Univ Research Reactor Annual Rept for Fy 97/98. with ML20211B1661997-06-30030 June 1997 Oh State Univ Research Reactor Annual Rept for FY96/97 ML20136D6921997-03-0606 March 1997 Safety Evaluation Supporting Amend 17 to License R-75 ML20129D9601996-06-30030 June 1996 Oh State Univ Research Reactor Annual Rept for FY95/96 ML20092M8301995-06-30030 June 1995 Oh State University Research Reactor Annual Rept for FY94/95 ML20086A3611995-05-10010 May 1995 Trtr Peer Review for Oh State Univ Nuclear Reactor Lab, for 950214-15 ML20073G4251994-06-30030 June 1994 Oh State Univ Research Reactor Annual Rept for FY93/94. W/ ML20056F7721993-08-23023 August 1993 Safety Evaluation Supporting Amend 14 to License R-75 ML20118A7251992-06-30030 June 1992 Annual Rept for Ohio State Univ Research Reactor for 910701 Through 920630 ML20094E3301992-01-23023 January 1992 Ro:On 920109,determined That One of Two Level Safety Sys Was Malfunctioning Due to Failure of LM339 Comparator Chip.Chip Replaced & Monitoring Circuit Tested Satisfactorily on 920110 ML20083D8841991-09-26026 September 1991 Annual Rept for Ohio State Univ Research Reactor,Jul 1990 to June 1991 ML20062F0771990-11-14014 November 1990 Safety Evaluation Supporting Amend 13 to License R-75 ML20065K7541990-11-0101 November 1990 Rev 5 to Adminstriative Procedure AP-09, Reactor Operator/ Senior Reactor Operator Requalification ML20059N1751990-06-30030 June 1990 Annual Rept for License R-75 for Jul 1989 - June 1990 ML20247J9691989-03-0707 March 1989 QA Program for Ohio State Univ Nuclear Reactor Lab ML20236A8061989-03-0707 March 1989 Ro:On 890224,exhaust Fan Not Operating When Reactor Critical at 10W.Caused by Switch Snagged by Belt Loop as Individual Left Control Room.Reactor Scrammed & Fan Switch Returned to on Position ML20155A7251988-09-27027 September 1988 Safety Evaluation Supporting Order Converting License R-75 from High to Low Enriched U ML20215F9861986-12-16016 December 1986 Rev 3 to Administrative Procedure AP-07, Review of Procedures ML20215F9731986-12-15015 December 1986 Rev 3 to Administrative Procedure AP-09, Reactor Operator/ Senior Reactor Operator Requalification ML20211G9641986-10-27027 October 1986 Rev 2 to Administrative Procedure AP-09, Reactor Operator/ Senior Reactor Operator Requalification ML20209F2761986-09-0808 September 1986 Ro:On 860903,during Std Shutdown of Reactor,Automatic Scram That Normally Occurs When Count Rate of Startup Channel Below 2 Cps Failed to Occur.Caused by Shorting of Input Signal.Startup Channel Repaired ML20206M4091986-06-16016 June 1986 Safety Evaluation Supporting Amend 11 to License R-75 ML20076K8271983-08-24024 August 1983 Ro:During Reactor Operator Training Session,Air Monitor Near Bldg Exhaust Fan Briefly Did Not Monitor Reactor Room Effluent.Monitor Used in Sniffer Mode for Evaluating 150 Ar-41 Production.Monitor Will Be Run Normally in Future 1999-06-30
[Table view] |
Text
__ __ . _ ____-- _ _ _ _ _ _ _ _ _ _ _ _ _
~~
NRL OPERATING PROCEDURES Administrative AP-7 Review of Procedures n-- -u..-n-r ,
(
I . SCOPE :
This instruction details the method to certify that each reactor licensee or trainee has reviewed changes in the facility license, design, and procedures I 1. DISCUSSION:
To comply with the requirements of the NRL Requalification Program for Reactor Operators and Senior Operators, a re-cord of license, design, and procedure reviews shal l be maintaine.d.
!II.
REFERENCES:
NRL Procedure AP-9, Requali*ication Program for Licenced Operators and Senior Operetors.
o IV. PRECAUTIONS:
None.
f V. PROCEDURES:
1 A. Each licensee or trainee, after reviewing a new proce-dure, a revision to an existing procedure, or a change in R-75, s ha l l i rM t i a l and dete the attached routing s l i p. (Attachment A)
- 8. The licensee may then insert the new document into his or her Procedures Manual and discard the obsolete proce-dure.
C. The routing r.l i p (Attachment A) as returned to the Manager of Reactor Operations who cha l l enter it into the Master Copy Procedures Manual to document review.
IV. ATTACHMENTS:
A. ROU7!NG GLIP 9612240 yhSo
}- ' PDR AD PDR v
Revised By/Date Approved By/Date Revision No. Prccedure No.
M DJ 10SEP85 M){ /0/f[3f Rev. 3 AP-C7 Pagedof__
g --
,,.** ATTACHMENT A ROUTING SLIP
/.
I have reviewed Procedure __________ entitled _________________
A copy has been entered into my procedures manual and the others forwarded to the next person on this list.
Initials Date Brian Hajek ________ _ _ _ _ _ _ _ . _
Richard Myser ________ ________
Joe Talnagi ________ ________
Joel Hatch ________ ________
Mike Jones ________ ________
f Bob Weaver , ________ ________
. Control Room Copy Updated ________ ________
Master Copy Updated ________ ________
Copy Forwarded to Dr. Don W. Miller ________ ________
Copy Forwarded to Office of Radiation Safety (if applicable) ________ __[_____
Reactor Operations Committee Updated ________ __ ______
?
k Revision No. Procedure No.
Review of Procedures Rev. 3 AP-07 2 2 Page_of
- . . . .- . . _ . - ._._