ML21070A348

From kanterella
Revision as of 13:09, 26 March 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
March 3, 2021, Summary of Category 1 Public Teleconference to Discuss Westinghouse Request to Extend the AP1000 Design by 5 Years
ML21070A348
Person / Time
Site: 05200006
Issue date: 03/15/2021
From: Bavol B
NRC/NRR/DNRL/NRLB
To: Michael Dudek
NRC/NRR/DNRL/NRLB
Bavol B - NRC/NRR/DNRL/NRLB
References
Download: ML21070A348 (5)


Text

March 15, 2021 MEMORANDUM TO: Michael I. Dudek, Chief New Reactor Licensing Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation FROM: Bruce Bavol, Project Manager /RA/

New Reactor Licensing Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF THE MARCH 3, 2021, CATEGORY 1, PUBLIC TELECONFERENCE TO DISCUSS WESTINGHOUSE REQUEST TO EXTEND AP1000 DESIGN CERTIFICATION The U.S. Nuclear Regulatory Commission (NRC) held a Category 1 public teleconference on March 3, 2021, to discuss the Westinghouse Electric Co. (Westinghouse) five year extension request for the AP1000 design certification. Six members of the general public were present on the bridgeline but did not provide their names or ask any questions. One member from Naval Nuclear Labs participated.

The public meeting notice dated March 3, 2021, can be found in the NRCs Agencywide Documents Access and Management Systems (ADAMS) under Accession No. ML21060B427.

Presentation slides from Westinghouse can be found in ADAMS under Accession No. ML21060B211. This meeting notice was also posted on the NRC public website.

Enclosed is the meeting agenda (Enclosure 1), list of participants (Enclosures 2), and overview (Enclosure 3).

Docket No.52-006

Enclosures:

1. Meeting Agenda
2. List of Attendees
3. Meeting Overview CONTACT: Bruce M. Bavol, NRR/ DNRL 301-415-6715

ML21070A348 *via e-mail NRC-002 OFFICE NRR/DNRL/NRLB: PM NRR/DNRL/NRLB: LA NRR/DNRL/NRLB: PM NAME BBavol SGreen BBavol DATE 03/11/2021 03/11/2021 03/15/2021 U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE TO DISCUSS WESTINGHOUSE REQUEST TO EXTEND AP1000 DESIGN CERTIFICATION MEETING AGENDA March 3, 2021 Public Meeting 1:00 - 1:05 p.m. Welcome and Introductions 1:05 - 1:50 p.m. Opening Discussion & Westinghouse Presentation 1:50 - 2:00 p.m. Public - Questions and Comments 2:00 p.m. Adjourn Enclosure 1

U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE TO DISCUSS WESTINGHOUSE REQUEST TO EXTEND AP1000 DESIGN CERTIFICATION LIST OF ATTENDEES March 3, 2021 Name Organization Bruce Bavol U.S. Nuclear Regulatory Commission (NRC)

Dan Doyle NRC Anna Bradford NRC Bob Caldwell NRC Michael Dudek NRC Sheldon Clark NRC Ilka Berrios NRC Hanry Wagage NRC Brian Wittick NRC Becky Patton NRC Mary Spencer NRC Angelo Stubbs NRC Megan Wright NRC Ryan Nolan NRC George Tartal NRC Ken Irwin NRC Robert Schaaf NRC Joshua Miller NRC Shakur Walker NRC Cayetano Santos NRC Zachary Harper Westinghouse Electric Company (WEC)

Jennifer Meneeley WEC Michael Corletti WEC Lucas Burkett WEC Douglas Weaver WEC Zachary Harper WEC Ray Kuyler WEC Robin Armistead Naval Nuclear Laboratory Six members of public on (Did not identify themselves) call.

Enclosure 2

U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE TO DISCUSS WESTINGHOUSE REQUEST TO EXTEND AP1000 DESIGN CERTIFICATION On March 3, 2021, the Office of Nuclear Reactor Regulation staff held a public meeting with Westinghouse to discuss their five year extension request for the AP1000 Design Certification (DC). This request would extend the period for which the AP1000 DC is able to be referenced by a combined license applicant from 15 to 20 years, resulting in a new expiration date of February 27, 2026. In a related Staff Requirements Memorandum for SECY-20-0082, Rulemaking Plan to Extend the Duration of the AP1000 Design Certification, the Commission approved the staffs recommendations to initiate a limited-scope rulemaking to amend Section VII in Appendix D to Title 10 of the Code of Federal Regulations (10 CFR) Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants, to extend the duration of the AP1000 design certification for an additional 5 years beyond the current expiration date of February 27, 2021, and to use the direct final rule process.

In order for NRC staff to ensure a complete AP1000 design per 10 CFR 52.54, Issuance of standard design certification, and proceed with the direct final rule process, Westinghouse agreed to submit applicable AP1000 DC markups and references (via letter to the NRC) that illustrate how (1) five select technical issues have been corrected based on current Vogtle AP1000 construction, and (2) the DCD would be marked-up in accordance with those changes.

These AP1000 DC markups and references will be verified by NRC staff when they are submitted.

At the conclusion of the meeting NRC staff opened up the meeting to questions from the general public with no questions being asked.

Enclosure 3