February 26, 2004 ORGANIZATION:

Nuclear Energy Institute (NEI)

SUBJECT:

SUMMARY

OF JANUARY 15, 2004, CATEGORY 2 SENIOR MANAGEMENT MEETING WITH NEI TO DISCUSS 10 CFR PART 52 COMBINED LICENSE (COL) ISSUES On January 15, 2004, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and NEI at NRC Headquarters in Rockville, MD. The purpose of this meeting was to discuss 10 CFR Part 52 COL issues. A list of meeting attendees is included as. The meeting agenda is provided as Attachment 2.

Handouts were provided during the meeting by both the staff and NEI. The handouts can be accessed through the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML040230652. This system provides text and image files of NRCs public documents. If you do not have access to ADAMS or if there are problems in accessing the handouts located in ADAMS, contact the NRC Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr@nrc.gov.

Highlights of the Meeting NEI requested the meeting with NRC senior managers to share information on priorities, schedules, and challenges in new plant licensing under 10 CFR Part 52. NEI discussed the 23 generic COL issues that have been identified and that are contained in the handouts from the meeting. The staff indicated that discussions have begun on many of the COL generic issues. The staff noted that fiscal year 2004 and 2005 new reactor resources were reduced to support additional license renewal reviews and that increased interactions on COL issues will be limited by resources. The staff stated that it is currently planning for one COL application in FY 2006 and that additional early site permit (ESP) or COL applications would be a challenge.

The staff emphasized the need to know industrys plans relative to COL applications as soon as possible.

The staff and NEI agreed to keep senior managers of both organizations informed of the status of the high priority COL generic issues. NRC senior managers stressed the need for NEI to work with the staff and the NRC line management (i.e., the Program Director New, Research and Test Reactors) to the maximum extent possible to resolve COL generic issues.

/RA/

Joseph Sebrosky, Senior Project Manager New Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No.52-006 Attachments: 1. List of attendees

2. Agenda cc w/ atts: See next page

ML040550002-Pkg.

OFFICE PM:RNRP SC:RNRP NAME JSebrosky LDudes DATE 2/25/04 2/25/04

Distribution for January 15, 2003, Meeting Summary dated February 26, 2004 Hard Copy RNRP R/F JMSebrosky LDudes E-Mail PUBLIC PMNS JDyer (RidsNrrOd)

RBorchardt JCraig (RidsNrrAdip)

BSheron (RidsNrrAdpt)

AThadani FEltawila NRR/ADPT Secretary [RidsNrrAdpt]

RNRP Group DMatthews BBoger CCarpenter SRichards DCoe TQuay JHannon SWeerakkody EWeiss JWermiel FAkstulewicz MRubin WBateman ESullivan GBagchi SCoffin TChan ALund GImbro DTerao KManoly JCalvo EMarinos RJenkins JJolicoeur, EDO MJohnson MReinhart CCasto TQuay RMcIntyre TFoley DThatcher SAlexander JAlbright (NRR Communication Coord)

ACRS (RidsAcrsMailCenter)

OPA MEl-Zeftway CKonzman MAAshley JBlake RGardner CPaulk LCampbell JMoore RWeisman GMizuno KBarber MLemoncelli TKenyon RWeisman, OGC NIqbal PQualls DBarss BMusico DNelson, OE

Meeting With the Nuclear Energy Institute January 15, 2004 Attendance List NRC NEI James Dyer NRR Stephen Floyd William Borchardt NRR Ron Simard Ashok Thadani RES Russ Bell Farouk Eltawila RES David Matthews NRR/DRIP Other Interested Attendees James Lyons NRR/DRIP/RNRP J. Alan Beard General Electric Stuart Richards NRR/DIPM/IIPB Paige Noques General Electric Laura Dudes NRR/DRIP/RNRP Shinichi Hayafune Energy USA Jerry Wilson NRR/DRIP/RNRP Patricia Campbell Winston and Strawn Wes Held NRR/DRIP/RNRP Lane Hay SERCH Bechtel Joe Williams NRR/DRIP/RNRP Edward Burns Michael Dusaniwskyj NRR/DRIP/RPRP Charles Brinkman Westinghouse Mary Ann Ashley NRR/DIPM/IIPB Marcus King Numark Associates Joe Sebrosky NRR/DRIP/RNRP B.P. Singh DOE Bruce Musico NRR/DIPM Tom Miller DOE Daniel Barss NRR/DIPM Jenny Weil McGraw-Hill Rich McIntyre NRR/DIPM Deann Ralegh LIS, Scientech Dale Thatcher NRR/DIPM Goutam Bagchi NRR/DE/EMEB Barry Zalcman NRR/DRIP/RLEP Patrick Sekerak NRR/DE/EMEB Joelle Starefos RES/DSARE Mary Drouin RES Robert Weisman OGC

Agenda January 15, Senior Management Meeting with NEI 3:00 p.m.

Introductory Comments NRC/NEI 3:10 p.m.

Discussion of 10 CFR Part 52 combined license (COL) issues



Integrated overview of current and imminent new plant licensing activities



Potential impacts on NRC and industry resources



Overview and status of COL policy and process implementation issues, vehicles and schedules for resolution



Status of responses to DOE solicitation for cooperative agreement on licensing demonstration projects



Potential COL licensing scenarios, timelines for submittal, impacts on NRC resources NEI/NRC 4:00 p.m.

Public Comment 4:15 p.m.

Summary 4:30 p.m.

Adjourn

Combination List:

cc:

Mr. Charles Brinkman Westinghouse Electric Co.

Washington Operations 12300 Twinbrook Pkwy., Suite 330 Rockville, MD 20852 Mr. David Lochbaum, Nuclear Safety Engineer Union of Concerned Scientists 1707 H Street, NW, Suite 600 Washington, DC 20006-3919 Dr. Gail H. Marcus U.S. Department of Energy Office of Nuclear Energy, Science

& Technology NE-1, Room 5A-143 1000 Independence Avenue, SW Washington, DC 20585 Mr. Paul Gunter Nuclear Information & Resource Service 1424 16th Street, NW, Suite 404 Washington, DC 20036 Mr. James Riccio Greenpeace 702 H Street, NW, Suite 300 Washington, DC 20001 Mr. Ron Simard Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708 Mr. George Alan Zinke Project Manager Nuclear Business Development Entergy Nuclear M-ECH-683 1340 Echelon Parkway Jackson, MS 39213 Mr. Thomas P. Miller U.S. Department of Energy NE-20, Rm. A286 Headquarters-Germantown 19901 Germantown Road Germantown, MD 20874-1290 Ms. Marilyn Kray Vice President, Special Projects Exelon Generation 200 Exelon Way, KSA3-E Kennett Square, PA 19348 Mr. Laurence Parme Manager, GT-MHR Safety &

Licensing General Atomics Company P.O. Box 85608 San Diego, CA 92186-5608 Mr. Joseph D. Hegner Lead Engineer - Licensing Dominion Generation Early Site Permitting Project 5000 Dominion Boulevard Glen Allen, VA 23060 Mr. Edward L. Quinn MDM Services Corporations Utility Operations Division 28202 Cabot Road, Suite 205 Laguna Nigual, CA 92677 Lynn Connor Doc-Search Associates 2211 sw 1ST Ave - #1502 Portland, OR 97201 Mr. Paul Leventhal Nuclear Control Institute 1000 Connecticut Avenue, NW Suite 410 Washington, DC 20036 Mr. James F. Mallay, Director Regulatory Affairs FRAMATOME, ANP 3315 Old Forest Road Lynchburg, VA 24501 Patricia Campbell Winston & Strawn 1400 L St., NW Washington, DC 20005 Mr. W. Edward Cummins AP600 and AP1000 Projects Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. Kelly R. Fletcher, Manager Business Development and Advanced Technologies GE Nuclear Energy 175 Curtner Avenue, MC 784 San Jose, CA 95125 Mr. Jack W. Roe SCIENTECH, INC.

910 Clopper Road Gaithersburg, MD 20878 Mr. Stephen P. Frantz Morgan, Lewis, & Bockius, LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. Gary Wright, Manager Office of Nuclear Facility Safety Illinois Department of Nuclear Safety 1035 Outer Park Drive Springfield, IL 62704 Mr. David Ritter Research Associate on Nuclear Energy Public Citizens Critical Mass Energy and Environmental Program 215 Pennsylvania Avenue, SE Washington, DC 20003 Mr. Tom Clements 6703 Gude Avenue Takoma Park, MD 20912 Mr. Lionel Batty Nuclear Business Team Graftech 12300 Snow Road Parma, Ohio 44130 Mr. James Blyth Canadian Nuclear Safety Commission 280 Slater Street, Station B P.O. Box 1046 Ottawa, Ontario K1P 5S9 Dr. Atambir S. Rao Project Manager, ESBWR GE Nuclear Energy 175 Curtner Avenue, MC 365 San Jose, CA 95125 USA Mr. Edward F. Sproat, III Vice President - Intl Projects Exelon Generation 200 Exelon Way Kennett Square, PA 19348 Mr. Vince Langman Licensing Manager Atomic Energy of Canada Limited 2251 Speakman Drive Mississauga, Ontario Canada L5K 1B2 Dr. Regis A. Matzie Senior Vice President and Chief Technology Officer Westinghouse Electric Company 2000 Day Hill Road Windsor, CT 06095-0500 Mr. Ed Wallace, General Manager Projects PBMR Pty LTD PO Box 9396 Centurion 0046 Republic of South Africa Mr. Dobie McArthur Director, Washington Operations General Atomics 1899 Pennsylvania Avenue, NW Suite 300 Washington, DC 20006