February 26, 2004 ORGANIZATION: Nuclear Energy Institute (NEI)

SUBJECT:

SUMMARY

OF JANUARY 15, 2004, CATEGORY 2 SENIOR MANAGEMENT MEETING WITH NEI TO DISCUSS 10 CFR PART 52 COMBINED LICENSE (COL) ISSUES On January 15, 2004, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and NEI at NRC Headquarters in Rockville, MD. The purpose of this meeting was to discuss 10 CFR Part 52 COL issues. A list of meeting attendees is included as . The meeting agenda is provided as Attachment 2.

Handouts were provided during the meeting by both the staff and NEI. The handouts can be accessed through the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML040230652. This system provides text and image files of NRCs public documents. If you do not have access to ADAMS or if there are problems in accessing the handouts located in ADAMS, contact the NRC Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr@nrc.gov.

Highlights of the Meeting NEI requested the meeting with NRC senior managers to share information on priorities, schedules, and challenges in new plant licensing under 10 CFR Part 52. NEI discussed the 23 generic COL issues that have been identified and that are contained in the handouts from the meeting. The staff indicated that discussions have begun on many of the COL generic issues. The staff noted that fiscal year 2004 and 2005 new reactor resources were reduced to support additional license renewal reviews and that increased interactions on COL issues will be limited by resources. The staff stated that it is currently planning for one COL application in FY 2006 and that additional early site permit (ESP) or COL applications would be a challenge.

The staff emphasized the need to know industrys plans relative to COL applications as soon as possible.

The staff and NEI agreed to keep senior managers of both organizations informed of the status of the high priority COL generic issues. NRC senior managers stressed the need for NEI to work with the staff and the NRC line management (i.e., the Program Director New, Research and Test Reactors) to the maximum extent possible to resolve COL generic issues.

/RA/

Joseph Sebrosky, Senior Project Manager New Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No.52-006 Attachments: 1. List of attendees

2. Agenda cc w/ atts: See next page

ML040550002-Pkg.

OFFICE PM:RNRP SC:RNRP NAME JSebrosky LDudes DATE 2/25/04 2/25/04 Distribution for January 15, 2003, Meeting Summary dated February 26, 2004 Hard Copy RNRP R/F JMSebrosky LDudes E-Mail PUBLIC PMNS JDyer (RidsNrrOd)

RBorchardt TQuay JCraig (RidsNrrAdip) RMcIntyre BSheron (RidsNrrAdpt) TFoley AThadani DThatcher FEltawila SAlexander NRR/ADPT Secretary [RidsNrrAdpt] JAlbright (NRR Communication Coord)

RNRP Group ACRS (RidsAcrsMailCenter)

DMatthews OPA BBoger MEl-Zeftway CCarpenter CKonzman SRichards MAAshley DCoe JBlake TQuay RGardner JHannon CPaulk SWeerakkody LCampbell EWeiss JMoore JWermiel RWeisman FAkstulewicz GMizuno MRubin KBarber WBateman MLemoncelli ESullivan TKenyon GBagchi RWeisman, OGC SCoffin NIqbal TChan PQualls ALund DBarss GImbro BMusico DTerao DNelson, OE KManoly JCalvo EMarinos RJenkins JJolicoeur, EDO MJohnson MReinhart CCasto

Meeting With the Nuclear Energy Institute January 15, 2004 Attendance List NRC NEI James Dyer NRR Stephen Floyd William Borchardt NRR Ron Simard Ashok Thadani RES Russ Bell Farouk Eltawila RES David Matthews NRR/DRIP Other Interested Attendees James Lyons NRR/DRIP/RNRP J. Alan Beard General Electric Stuart Richards NRR/DIPM/IIPB Paige Noques General Electric Laura Dudes NRR/DRIP/RNRP Shinichi Hayafune Energy USA Jerry Wilson NRR/DRIP/RNRP Patricia Campbell Winston and Strawn Wes Held NRR/DRIP/RNRP Lane Hay SERCH Bechtel Joe Williams NRR/DRIP/RNRP Edward Burns Michael Dusaniwskyj NRR/DRIP/RPRP Charles Brinkman Westinghouse Mary Ann Ashley NRR/DIPM/IIPB Marcus King Numark Associates Joe Sebrosky NRR/DRIP/RNRP B.P. Singh DOE Bruce Musico NRR/DIPM Tom Miller DOE Daniel Barss NRR/DIPM Jenny Weil McGraw-Hill Rich McIntyre NRR/DIPM Deann Ralegh LIS, Scientech Dale Thatcher NRR/DIPM Goutam Bagchi NRR/DE/EMEB Barry Zalcman NRR/DRIP/RLEP Patrick Sekerak NRR/DE/EMEB Joelle Starefos RES/DSARE Mary Drouin RES Robert Weisman OGC Attachment 1

Agenda January 15, Senior Management Meeting with NEI 3:00 p.m. Introductory Comments NRC/NEI 3:10 p.m. Discussion of 10 CFR Part 52 combined license (COL) issues NEI/NRC 6 Integrated overview of current and imminent new plant licensing activities 6 Potential impacts on NRC and industry resources 6 Overview and status of COL policy and process implementation issues, vehicles and schedules for resolution 6 Status of responses to DOE solicitation for cooperative agreement on licensing demonstration projects 6 Potential COL licensing scenarios, timelines for submittal, impacts on NRC resources 4:00 p.m. Public Comment 4:15 p.m. Summary 4:30 p.m. Adjourn Attachment 2

Combination List: Ms. Marilyn Kray Vice President, Special Projects cc: Mr. Charles Brinkman Exelon Generation Westinghouse Electric Co. 200 Exelon Way, KSA3-E Washington Operations Kennett Square, PA 19348 12300 Twinbrook Pkwy., Suite 330 Rockville, MD 20852 Mr. Laurence Parme Manager, GT-MHR Safety &

Mr. David Lochbaum, Nuclear Safety Engineer Licensing Union of Concerned Scientists General Atomics Company 1707 H Street, NW, Suite 600 P.O. Box 85608 Washington, DC 20006-3919 San Diego, CA 92186-5608 Dr. Gail H. Marcus Mr. Joseph D. Hegner U.S. Department of Energy Lead Engineer - Licensing Office of Nuclear Energy, Science Dominion Generation

& Technology Early Site Permitting Project NE-1, Room 5A-143 5000 Dominion Boulevard 1000 Independence Avenue, SW Glen Allen, VA 23060 Washington, DC 20585 Mr. Edward L. Quinn Mr. Paul Gunter MDM Services Corporations Nuclear Information & Resource Service Utility Operations Division 1424 16th Street, NW, Suite 404 28202 Cabot Road, Suite 205 Washington, DC 20036 Laguna Nigual, CA 92677 Mr. James Riccio Lynn Connor Greenpeace Doc-Search Associates 702 H Street, NW, Suite 300 2211 sw 1ST Ave - #1502 Washington, DC 20001 Portland, OR 97201 Mr. Ron Simard Mr. Paul Leventhal Nuclear Energy Institute Nuclear Control Institute Suite 400 1000 Connecticut Avenue, NW 1776 I Street, NW Suite 410 Washington, DC 20006-3708 Washington, DC 20036 Mr. George Alan Zinke Mr. James F. Mallay, Director Project Manager Regulatory Affairs Nuclear Business Development FRAMATOME, ANP Entergy Nuclear 3315 Old Forest Road M-ECH-683 Lynchburg, VA 24501 1340 Echelon Parkway Jackson, MS 39213 Patricia Campbell Winston & Strawn Mr. Thomas P. Miller 1400 L St., NW U.S. Department of Energy Washington, DC 20005 NE-20, Rm. A286 Headquarters-Germantown Mr. W. Edward Cummins 19901 Germantown Road AP600 and AP1000 Projects Germantown, MD 20874-1290 Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355

Mr. Kelly R. Fletcher, Manager Mr. Edward F. Sproat, III Business Development and Advanced Vice President - Intl Projects Technologies Exelon Generation GE Nuclear Energy 200 Exelon Way 175 Curtner Avenue, MC 784 Kennett Square, PA 19348 San Jose, CA 95125 Mr. Vince Langman Mr. Jack W. Roe Licensing Manager SCIENTECH, INC. Atomic Energy of Canada Limited 910 Clopper Road 2251 Speakman Drive Gaithersburg, MD 20878 Mississauga, Ontario Canada L5K 1B2 Mr. Stephen P. Frantz Morgan, Lewis, & Bockius, LLP Dr. Regis A. Matzie 1111 Pennsylvania Avenue, NW Senior Vice President and Washington, DC 20004 Chief Technology Officer Westinghouse Electric Company Mr. Gary Wright, Manager 2000 Day Hill Road Office of Nuclear Facility Safety Windsor, CT 06095-0500 Illinois Department of Nuclear Safety 1035 Outer Park Drive Mr. Ed Wallace, General Manager Springfield, IL 62704 Projects PBMR Pty LTD Mr. David Ritter PO Box 9396 Research Associate on Nuclear Energy Centurion 0046 Public Citizens Critical Mass Energy Republic of South Africa and Environmental Program 215 Pennsylvania Avenue, SE Mr. Dobie McArthur Washington, DC 20003 Director, Washington Operations General Atomics Mr. Tom Clements 1899 Pennsylvania Avenue, NW 6703 Gude Avenue Suite 300 Takoma Park, MD 20912 Washington, DC 20006 Mr. Lionel Batty Nuclear Business Team Graftech 12300 Snow Road Parma, Ohio 44130 Mr. James Blyth Canadian Nuclear Safety Commission 280 Slater Street, Station B P.O. Box 1046 Ottawa, Ontario K1P 5S9 Dr. Atambir S. Rao Project Manager, ESBWR GE Nuclear Energy 175 Curtner Avenue, MC 365 San Jose, CA 95125 USA