Amendment 26 to GE Licensing Topical Report NEDE-24011-P-A, Gestar II - Implementing Improved GE STEADY-STATE Methods
ML993230184
Person / Time
Site: Boiling Water Reactor Owners Group
Issue date: 11/10/1999
From: Richards S
NRC/NRR/DLPM/LPD4
To: Watford G
General Electric Co
References
TAC MA6481
Download: ML993230184 (3)


Text

Mr. Glen A. Watford, Manager Nuclear Fuel Engineering GE Nuclear Energy November 10, 1999 P. 0. Box 780 Wilmington, NC 28402

SUBJECT:

AMENDMENT 26 TO GE LICENSING TOPICAL REPORT NEDE-2401 1-P-A, "GESTAR I'"- IMPLEMENTING IMPROVED GE STEADY-STATE METHODS (TAC NO. MA6481)

Dear Mr. Watford:

By letter dated October 22, 1999, General Electric Nuclear Energy (GENE), submitted a request for review of Amendment 26 to GESTAR as a standard amendment. GESTAR Amendment 26 was submitted by letter dated August 13, 1999, as an administrative change, and involved three areas. These areas were: (1) clarifying classification of BWR 6 pressure regulator failure downscale event; (2) implementing improved General Electric (GE) steady-state methods; and (3) incorporation of Boiling Water Reactor Owners Group (BWOG) approved stability options.

This submittal was later supplemented by letters of September 17 and October 14, 1999. The NRC staff has reviewed Item 2 of the submittal, in relation to the GE improved steady-state methods, and has prepared the enclosed safety evaluation. We find Item 2 of the proposed Amendment 26 is acceptable, as discussed in the safety evaluation. Items 1 and 3 will be addressed under a separate cover letter.

Sincerely, Original Signed By:

Stuart A. Richards, Director Project Directorate IV and Decommissioning Division of Licensing Project Management Office of Nuclear Regulator Regulation Project No. 691 DISTRIBUTION:

File Center

Enclosure:

Safety Evaluation PUBLIC PDIV-2 Reading cc w/encl: See next page SRichards RScholl (e-mail SE a . V ACRS . ...

OGC EKenderick

  • See previous concurrence Io receive a copy ot tills document, indicate 77, in the box OFFICE PDIII/2/PM C PDIV-2/LA C PDIV_2/SC PDIV/PD NAME RPulsifer:am* E. Peyton
  • SDembek* SRichards DATE 11/9/99 11/8/99 11/ 9/99 11/10/99

,UIWIEN I AIV-.: L:IP'IIII FICAULIIRIECOEa.wpd OFFICAL RECORD ONLY cr) Fý

'YA UNITED STATES

,0 NUCLEAR REGULATORY COMMISSION A'

La.

WASHINGTON, D.C. 20555-0001 November 10, 1999 Mr. Glen A. Watford, Manager Nuclear Fuel Engineering GE Nuclear Energy P. O. Box 780 Wilmington, NC 28402

SUBJECT:

AMENDMENT 26 TO GE LICENSING TOPICAL REPORT NEDE-24011-P-A, "GESTAR 11" - IMPLEMENTING IMPROVED GE STEADY-STATE METHODS (TAC NO. MA6481)

Dear Mr. Watford:

By letter dated October 22, 1999, General Electric Nuclear Energy (GENE), submitted a request for review of Amendment 26 to GESTAR as a standard amendment. GESTAR Amendment 26 was submitted by letter dated August 13, 1999, as an administrative change, and involved three areas. These areas were: (1) clarifying classification of BWR 6 pressure regulator failure downscale event; (2) implementing improved General Electric (GE) steady state methods; and (3) incorporation of Boiling Water Reactor Owners Group (BWOG) approved stability options. This submittal was later supplemented by letters of September 17 and October 14, 1999. The NRC staff has reviewed Item 2 of the submittal, in relation to the GE improved steady-state methods, and has prepared the enclosed safety evaluation. We find Item 2 of the proposed Amendment 26 acceptable, as discussed in the safety evaluation.

Items 1 and 3 will be addressed under a separate cover letter.

Sincerely, Stuart A. Richards, Director Project Directorate IV and Decommissioning Division of Licensing Project Management Office of Nuclear Regulator Regulation Project No. 691

Enclosure:

Safety Evaluation cc w/encl: See next page

Boiling Water Reactor Owners Group Project No. 691 cc:

Mr. W. Glenn Warren Mr. George T. Jones BWR Owners' Group Chairman PP& L, Inc.

Southern Nuclear Company MC GENA6-1 42 Inverness Parkway Two North Ninth Street PO Box 1295 Allentown, PA 18101 Birmingham, AL 35201 Mr. John Kelly Mr. James M. Kenny New York Power Authority BWR Owners' Group Vice Chairman 14th Floor Mail Stop 14K PP&L, Inc. Centroplex Building Mail Code GENA6-1 123 Main Street Allentown, PA 18101-1179 White Plains, NY 10601 Mr. Thomas J. Rausch Mr. Thomas G. Hurst RRG Chairman GE Nuclear Energy Commonwealth Edison Company M/C 182 Nuclear Fuel Services 175 Curtner Avenue 1400 Opus Place, 4th Floor San Jose, CA 95125 Downers Grove, IL 60515-5701 Mr. Thomas A. Green Mr. Drew B. Fetters GE Nuclear Energy PECO Energy M/C 182 Nuclear Group Headquarters 175 Curtner Avenue MC 61A-3 San Jose, CA 95125 965 Chesterbrook Blvd.

Wayne, PA 19087-5691 Mr. H. Lewis Sumner Southern Nuclear Company 40 Inverness Parkway PO Box 1295 Birmingham, GA 35201 Mr. Carl D. Terry Vice President, Nuclear Engineering Niagara Mohawk Power Corporation Nine Mile Point - Station OPS Bldg/2nd Floor PO Box 63 Lycoming, NY 13093