Division of Nuclear Matl Safety FY97 Self-Assessment PlanML20216C159 |
Person / Time |
---|
Issue date: |
04/02/1998 |
---|
From: |
NRC |
---|
To: |
|
---|
Shared Package |
---|
ML20216B889 |
List: |
---|
References |
---|
PROC-980402, NUDOCS 9804140353 |
Download: ML20216C159 (8) |
|
Similar Documents from NRC |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217H0471999-09-30030 September 1999 Management Directive & Handbook 8.11, Review Process for 10CFR2.206 Petitions ML20212J8561999-09-13013 September 1999 Draft NRC Insp Manual,Insp Procedure 95001, Supplemental Insp for One or Two White Inputs in Strategic Performance ML20211F8961999-08-18018 August 1999 Revised Reactor Oversight Process Pilot Program Guidelines ML20211F9221999-08-13013 August 1999 Draft Inspection Procedure 71130, Physical Protection ML20211F9291999-08-11011 August 1999 Draft Inspection Procedure 71111, Initiating Events (10). Mitigating Systems (90) ML20217M9461999-06-30030 June 1999 Commissioner'S Assistant Handbook ML20216E1401999-06-0707 June 1999 SRP for Review of Decommissioning Plans & Other Info Submitted to Support Release of Nuclear Facilities, Draft for Review & Comment Only ML20195H6311999-05-20020 May 1999 Pilot Program Guidelines ML20195H7351999-05-19019 May 1999 Draft NRC Inspection Manual,Manual Chapter 0610, Inspection Repts. Also Encl,Draft Manual Chapter 06XX Entitled, Significance Determination Process ML20195H7071999-05-14014 May 1999 Draft NRC Inspection Manual,Inspection Procedure 71152, Identification & Resolution of Problems ML20210L3321999-05-10010 May 1999 Final USNRC Contingency Plan for Y2K Issue in Nuclear Industry ML20195H6381999-05-0909 May 1999 Draft NRC Insp Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase ML20195H6471999-05-0707 May 1999 Draft NRC Insp Manual,Inspection Procedure 71111, Reactor Safety-Initiating Events,Mitigating Systems,Barrier Integrity ML20195H6621999-05-0707 May 1999 Draft NRC Inspection Manual,Inspection Procedure 71114, Reactor Safety - Emergency Preparedness ML20206F2231999-04-27027 April 1999 NRC Manual Chapter 0350 Restart Action Plan for Clinton Power Station ML20195H6701999-04-21021 April 1999 Draft NRC Insp Manual,Inspection Procedure 71121, Occupational Radiation Safety ML20195H6871999-04-21021 April 1999 Draft NRC Insp Manual,Inspection Procedure 71150, Plant Status ML20195H6761999-04-21021 April 1999 Draft NRC Insp Manual,Inspection Procedure 71122, Public Radiation Safety ML20212J4721999-04-16016 April 1999 Proposed Final Rept, Integrated Matls Performance Evaluation Program Review of North Dakota Agreement State Program,9904013-16 ML20207L3591999-02-28028 February 1999 Budget Estimates and Performance Plan Fiscal Year 2000 ML20206M9521999-02-11011 February 1999 Preliminary Guidelines for Evaluating Dose Assessments in Support of Decommissioning ML20205J6741999-01-27027 January 1999 NRC Insp Manual Chapter 1360, Use of Physician & Scientific Consultants in Medical Consultant Program ML20151Z0531998-07-31031 July 1998 Instructions for Completing Nrc'S Uniform LOW-LEVEL Radioactive Waste Manifest ML20237A3321998-07-30030 July 1998 Audit Guidance,Severe Accident Management Implementation ML20236T4251998-07-22022 July 1998 Internal Commission Procedures ML20216C2041998-04-0202 April 1998 Fy 1998 Regional Operating Plan for Region II ML20216C1591998-04-0202 April 1998 Division of Nuclear Matl Safety FY97 Self-Assessment Plan ML20198P4001998-03-31031 March 1998 Radioactive Waste Mgt H-202, Training Manual ML20217G0231998-03-30030 March 1998 Govt Performance & Results Act, Performance Plan FY99 ML20216D0261998-02-28028 February 1998 Performance Plan Fy 1999 ML20216C5911998-02-27027 February 1998 FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 980227 IA-98-111, FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 9802271998-02-27027 February 1998 FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 980227 ML20203H3271998-02-0505 February 1998 Restart Assessment Plan Millstone Station ML20203M4861998-02-0202 February 1998 Draft Govt Performance & Results Act Performance Plan FY99 ML20199H9191997-11-30030 November 1997 NRC DRUG-FREE Workplace Plan ML20236K4981997-10-31031 October 1997 Nrc/Oas Training Working Group Recommendations for Agreement State Training Programs ML20202J2701997-10-31031 October 1997 NRC Strategic Plan.Fiscal Year 1997 - Fiscal Year 2002 ML20217J8081997-09-30030 September 1997 Strategic Plan for Fiscal Year 1997-2002 ML20211K3271997-09-30030 September 1997 Quality Management Program ML20210R7701997-08-11011 August 1997 Working Draft Entitled, Unsealed Byproduct Matl - Low Dose Diagnostic Studies, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7751997-08-11011 August 1997 Working Draft Entitled, Unsealed Byproduct Matl - High Dose Radiopharms for Therapy, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7371997-08-0707 August 1997 Working Draft Entitled, Teletherapy, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7421997-08-0707 August 1997 Working Draft Entitled, Low Dose Sealed Sources, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7591997-08-0707 August 1997 Working Draft Entitled, Gamma Stereotactic Radiosurgery, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7521997-08-0707 August 1997 Working Draft Entitled, High Dose Rate Remote Afterloaders as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20151L8431997-07-31031 July 1997 Handbook 10.131, Protection of NRC Employees Against Ionizing Radiation ML20151L8361997-07-31031 July 1997 Directive 10.131, Protection of NRC Employees Against Ionizing Radiation ML20198K9481997-07-22022 July 1997 Restart Assessment Plan Millstone Station ML20211F1261997-07-21021 July 1997 Restart Assessment Plan,Millstone Station ML20249C4451997-03-19019 March 1997 Directive 8.14, Evaluating Safety Performance of Nuclear Power Reactor Licensees 1999-09-30
[Table view]Some use of "" in your query was not closed by a matching "". Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20217H0471999-09-30030 September 1999 Management Directive & Handbook 8.11, Review Process for 10CFR2.206 Petitions ML20212J8561999-09-13013 September 1999 Draft NRC Insp Manual,Insp Procedure 95001, Supplemental Insp for One or Two White Inputs in Strategic Performance ML20211F8961999-08-18018 August 1999 Revised Reactor Oversight Process Pilot Program Guidelines ML20211F9221999-08-13013 August 1999 Draft Inspection Procedure 71130, Physical Protection ML20211F9291999-08-11011 August 1999 Draft Inspection Procedure 71111, Initiating Events (10). Mitigating Systems (90) ML20217M9461999-06-30030 June 1999 Commissioner'S Assistant Handbook ML20216E1401999-06-0707 June 1999 SRP for Review of Decommissioning Plans & Other Info Submitted to Support Release of Nuclear Facilities, Draft for Review & Comment Only ML20195H6311999-05-20020 May 1999 Pilot Program Guidelines ML20195H7351999-05-19019 May 1999 Draft NRC Inspection Manual,Manual Chapter 0610, Inspection Repts. Also Encl,Draft Manual Chapter 06XX Entitled, Significance Determination Process ML20195H7071999-05-14014 May 1999 Draft NRC Inspection Manual,Inspection Procedure 71152, Identification & Resolution of Problems ML20210L3321999-05-10010 May 1999 Final USNRC Contingency Plan for Y2K Issue in Nuclear Industry ML20195H6381999-05-0909 May 1999 Draft NRC Insp Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase ML20195H6471999-05-0707 May 1999 Draft NRC Insp Manual,Inspection Procedure 71111, Reactor Safety-Initiating Events,Mitigating Systems,Barrier Integrity ML20195H6621999-05-0707 May 1999 Draft NRC Inspection Manual,Inspection Procedure 71114, Reactor Safety - Emergency Preparedness ML20206F2231999-04-27027 April 1999 NRC Manual Chapter 0350 Restart Action Plan for Clinton Power Station ML20195H6701999-04-21021 April 1999 Draft NRC Insp Manual,Inspection Procedure 71121, Occupational Radiation Safety ML20195H6761999-04-21021 April 1999 Draft NRC Insp Manual,Inspection Procedure 71122, Public Radiation Safety ML20195H6871999-04-21021 April 1999 Draft NRC Insp Manual,Inspection Procedure 71150, Plant Status ML20212J4721999-04-16016 April 1999 Proposed Final Rept, Integrated Matls Performance Evaluation Program Review of North Dakota Agreement State Program,9904013-16 ML20207L3591999-02-28028 February 1999 Budget Estimates and Performance Plan Fiscal Year 2000 ML20206M9521999-02-11011 February 1999 Preliminary Guidelines for Evaluating Dose Assessments in Support of Decommissioning ML20205J6741999-01-27027 January 1999 NRC Insp Manual Chapter 1360, Use of Physician & Scientific Consultants in Medical Consultant Program ML20151Z0531998-07-31031 July 1998 Instructions for Completing Nrc'S Uniform LOW-LEVEL Radioactive Waste Manifest ML20237A3321998-07-30030 July 1998 Audit Guidance,Severe Accident Management Implementation ML20236T4251998-07-22022 July 1998 Internal Commission Procedures ML20216C2041998-04-0202 April 1998 Fy 1998 Regional Operating Plan for Region II ML20216C1591998-04-0202 April 1998 Division of Nuclear Matl Safety FY97 Self-Assessment Plan ML20198P4001998-03-31031 March 1998 Radioactive Waste Mgt H-202, Training Manual ML20217G0231998-03-30030 March 1998 Govt Performance & Results Act, Performance Plan FY99 ML20216D0261998-02-28028 February 1998 Performance Plan Fy 1999 ML20216C5911998-02-27027 February 1998 FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 980227 IA-98-111, FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 9802271998-02-27027 February 1998 FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 980227 ML20203H3271998-02-0505 February 1998 Restart Assessment Plan Millstone Station ML20203M4861998-02-0202 February 1998 Draft Govt Performance & Results Act Performance Plan FY99 ML20199H9191997-11-30030 November 1997 NRC DRUG-FREE Workplace Plan ML20202J2701997-10-31031 October 1997 NRC Strategic Plan.Fiscal Year 1997 - Fiscal Year 2002 ML20236K4981997-10-31031 October 1997 Nrc/Oas Training Working Group Recommendations for Agreement State Training Programs ML20217J8081997-09-30030 September 1997 Strategic Plan for Fiscal Year 1997-2002 ML20211K3271997-09-30030 September 1997 Quality Management Program ML20210R7701997-08-11011 August 1997 Working Draft Entitled, Unsealed Byproduct Matl - Low Dose Diagnostic Studies, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7751997-08-11011 August 1997 Working Draft Entitled, Unsealed Byproduct Matl - High Dose Radiopharms for Therapy, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7371997-08-0707 August 1997 Working Draft Entitled, Teletherapy, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7521997-08-0707 August 1997 Working Draft Entitled, High Dose Rate Remote Afterloaders as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7421997-08-0707 August 1997 Working Draft Entitled, Low Dose Sealed Sources, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7591997-08-0707 August 1997 Working Draft Entitled, Gamma Stereotactic Radiosurgery, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20151L8431997-07-31031 July 1997 Handbook 10.131, Protection of NRC Employees Against Ionizing Radiation ML20151L8361997-07-31031 July 1997 Directive 10.131, Protection of NRC Employees Against Ionizing Radiation ML20198K9481997-07-22022 July 1997 Restart Assessment Plan Millstone Station ML20211F1261997-07-21021 July 1997 Restart Assessment Plan,Millstone Station ML20249C4451997-03-19019 March 1997 Directive 8.14, Evaluating Safety Performance of Nuclear Power Reactor Licensees 1999-09-30
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
,
l u-t DIVISION OF NUCLEAR MATERIALS SAFETY.
FY97 SELF-ASSESSMENT PLAN i
i l
1 9804140353 980402 PDR ORG NOMA Attachment 26-p ,
1..
DNMS Self-Assessment Plan for Fiscal Year 1997 Objectives:
- 1. To establish a process by which the Division of Nuclear Materials Safety (DNMS) conducts its periodic assessment of performance.
- 2. To provide a systematic approach to evaluate strengths and weaknesses in the programs assigned to DNMS.
- 3. To provide input into decisions where the performance should be modified to make work better or improve to the expected level.
Process:
The routine process consists of the following:
- 1. Quarterly evaluations and reporting of results to the Division Director by {
each Branch, the Agreement State Program Officer, and the Technical !
Assistant (for laboratory activities) using the performance indicators and 1 measures specified in this plan. Some elements and their measures must be reviewed monthly to effectively correct poor performance. These are ;
indicated by an "*" next to the standard. '
- 2. Annual evaluations at the Division Director level, independent of the Branches, in program areas listed below for Fiscal Year 1996:
I
- a. Allegation plan timeliness and implementation (scheduled for March {
1997). l
- b. Inspection report quality (two peer reviews scheduled for December j 1996 and June 1997). '
- c. Review of implementation of IMPEP corrective actions (scheduled for i January 1997).
- d. Review of license exemptions issued (scheduled for February 1997).
- e. Materials licensing action quality (conformance to SRPs, etc.)
(scheduled for May 1997). !
- f. Review of fuel facility security and emergency plan changes (scheduled for November 1996).
- g. Security of Financial Assurance documents (requiied annually by MD 8.12) s
l.,
I 2
Performance will be measured in a " windows" format with an overall " roll-up" indir,ator for each Branch based on performance indicators for each element. The de6nition for the overall and each element indicators is as follows:
For Ratina Overall Performance in Each Branch GREEN All indicators in the elements are green.
YELLOW One or more yellow ratings for elements indicators.
RED One or more red ratings for element indicators.
For Ratina Each Element Indicator in Each Branch GREEN Performance meets or exceeds the expected standard.
YELLOW Performance generally satisfactory, but needs improvement to meet or exceed the standard.
RED Performance is unsatisfactory, since it does not generally meet the standard.
PERFORMANCE ELEMENTS AND STANDARDS Proaram Area: On Site
- 1. Performance Element: On site time Standard:
-For the materials program the Branch hours expended on inspections meets 28% of the time allocated for inspection.
-Onsite time in accordance with Regional goals for fuel facilities.
-Backshift inspections performed in accordance with Regional goals.
-Licensing site visits for significant changes to programs.
-lMPEP reviews assigned to the Agreement State Program Officer (ASPO) completed in accordance with assigned schedules.
-Support to Agreement States provided when requested by States and agreed to by Region ll management.
- 2. Performance Element: Use of technically qualified staff Standard:
i
)
Attachment U
l ;
,.? -'
_i l
3
-Staff training complated in accordance with MC_1246 (or MC 1245~
for staff previously qualified). .
l -For those staff qualified under MC 1245, completion of courses in MC 1246 in accordance with the Training Plan.
-Staff used are qualified for job assigned.
-incident response training completed as identified in regional training procedures. (10/3/95 memo from AEOD)
-Management oversight of staff in field in accordance'with ROI and.
MC.
-Annual IMPEP training completed for IMPEP team members.
' 3. . Performance Element: Appropriate backup for functions Standard:
-Qualified backup individuals for each key function performed by Branch.
-Individuals available to perform key functions each day of business (e.g., classified document handling in FFB, safe closure each day, processing license applications, processing reciprocity requests, evaluation of events).
- 4. Performance Element: Adequate use of budgeted FTE's Standard:
-Actual expenditures meet budgeted FTE's in Regional Operating Plan.
.. Proaram Area: On Time
- 1. Performance Element: Allegation follow-up Standard:
l-
-Allegations timely closed in accordance with MD 8.8 and ROI 1030.
-180 day total for closure
- -plans approved prior to inspection
-referrals to Agreement States within 30 days.
- 2. Performance Element: Inspections performed Standard:
-No overdue inspections (in accordance with IMC 2600,2800 and/or 2545).
Attachment
4
-Inspections of new materials licenses in accordance with IMC 28bO.
j -Inspections of Navy and reciprocity licenses in accordance with IMC.
-Survey meters calibrated and sample analyses completed in accordance with schedules established.
- 3. Performance Element: License reviews Standard:
-New materials licensing cases completed within timeliness specified in Regional Operating Plan. Effectively reduces backlog of old cases.
-Security plan reviews for fuel facilities and research reactors completed within the timeframes specified in Regional Operating Plan.
-Materials license and security plan change applications processed timely.
i
-Reciprocity reviews timely processed. (Within two working days of receipt).
-Acceptance reviews completed within 30 days of receipt.
- 4. Performance Element: Open items Standard:
-Unresolved items closed within six months of identification.
-lFI's closed within 12 months of identification in most cases with less than 10 cases over 12 months old and no case over two years old.
- 5. Performance Element: Event Response
-Events responded to in accordance with safety significance. !
-Response to medical events and abandoned sources meets )
timeframes specified in IMC.
l
-Abnormal occurrences identified within quarter of occurrence and !
processed in accordance with timeframes in MD 8.1 and guidance j from AEOD. '
l -Coordination of significant events to program office within one working day.
,_ -PNs and Morning Reports meet timeliness goals of ROls.
l
- 6. Performance Element: Documentation of results Standard:
-inspection reports issued within timeframes in IMC (max = 30 days I L for routine).
Attachment i L
( __ _
'/' ,
1 5
-Materials field note inspection reports reviewed and issued within 30 days of end of inspection.
-inspection reports and materials licenses timely filed in~ docket files.
-Draft IMPEP reports provided to SP within 30 days of exit (for those IMPEPs where ASPO is team leader). For those cases where Region 11 ASPO is a team member, draft inputs to the report in five working days.
- 7. Performance Element: Enforcement actions Standard:
-Routine enforcement cases' delegated to Region completed within 49 days of inspection completion date.
-Routine enforcement cases not delegated to Region - memorandum to OE within 42 days if inspection completion date.
-Exempt cases (less than 100 days total)
- 8. . Performance Element: Action items -
Standard:
-Completion of action items (DAFFYs and DAITs) within timeframes established by the requestor.
Proaram Area: On Taraet
- 1. Performance Element: Technical quality l
Standard:
-inspection findings well-founded (supported by facts and relationship to regulations clear).
-Inspection safety issues identified and followed up; generic safety issues addressed.
-Follow-up inspections address open items from previous inspections.
-inspections and license review performed in accordance with j guidance in IMC and NMSS P&G Directives. '
-Results and scope of inspections and license reviews are performance based.
.-Licenses address request or communicate difference to applicant.
- -inspection and license review findings reviewed by management.
-!MPEP reviews in accordance with MD 5.6 and IMPEP Manual. ,
Recommendations to Management Review Board well founded -
technically and performance-based. {
I Attachment
i ..
! l 6
l ~
l
-Sufficient number of operable survey meters a
- 2. Performance Element: Allegation follow-up Standard:
-Closure packages and documentation addiess allegations and reference inspection reports.
-Inspection plans adequate to address allegations and not discloce alleger.
-Findings reviewed by management.
-Safety significance addressed.
- 3. Performance Element: Completion of planned program Standard:
-Completion of budgeted core and total materials license casework (from C-3).
-Completion of budgeted core and totalinspections (from C-3 and Due List).
-Maintenance of fuel facility site activities matrix and review for trends.
-Technical assistance to states, state regulation reviews, and l 1
exchange of information is provided as needed.
- 4. Performance Element: Inspection report and license documentation Standard:
-Management review and signature in accordance with ROl's.
-Reports and licenses contain few typographical errors.
-Peer review results indicate reports consistent with IMC.
-Licenses consistent with NMSS P&G Directives and SRP's.
- 5. Performance Element: Enforcement actions Standard:
-Final actions taken in accordance with enforcement policy.
-Violations have basis in requirements and written to have parallelism between requirement and " contrary to" statement.
-NCV's issued in accordance with criteria in enforaement policy.
Attachment
, ', 4 s 7
- 6. Performance Element: Event response Standard:
-Incoming events evaluated and safety significance identified.
-Safety issues followed up.
-Special inspections (e.g., medical misadministrations, AIT's) follow guidance in MDs' and MC's.
-Incident response procedures for agency response followed.
-Generic safety issues addressed.
l l 4
i l
Attachment