ML20216E463

From kanterella
Revision as of 03:39, 6 March 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Change Eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula,Since Corbicula & Zebra Mussels Have Already Been Identified & Control & Treatment Plans Are Implemented
ML20216E463
Person / Time
Site: Perry 
Issue date: 09/09/1999
From:
CENTERIOR ENERGY
To:
Shared Package
ML20216E460 List:
References
NUDOCS 9909140077
Download: ML20216E463 (2)


Text

.

Atttchm nt 3 PY-CEl/NRR-2406t.

Page i of 2

2.0 Environmental Protection Issues i

associated with the operation of the two-unit Perry Nucl Certain environmental issues were identified which required study or license conditions of the environment. to resolve environmental concerns and to assure adequate protection 2.1 Aquatic Issues (1)

NRC staff in the FES-OL.No specific nonradiological aquatic impact issuel i

(2) t The presence of Asiatic clams (Corbicula sp) in western Lake Erie renders I their eventual presence near Perry as likely. Should the presence of Corbicula in the vicinity of Perry threaten the operation of a safety system, due to biofouling, measures'to control Corbicula will be undertaken (FESSection4.3.6.2).

Cae+4-= a a 1 E AL-een (Mau 1800) .=*=anadwme ek-naeanHal enfatu ralmead pf55ES

'praarte 75!:brEM th;t :::: ht!'e'* E5545555,' ~5f555:5'tk'1IA=a==A'c maaH5/4E{ l (e) e= 714aa cf the his f; '

carde ]:, Seth at Parry and at :::,;f C,41j;,;ge;'; ;r ;;rg th: preraare ef-

';;;j]_';;;];j rrT5h0;;;;; C^a(S)addr;;:::

==intanance inenacHans th: hte e=-alia; ia ead (c) ::r;;illerce i.uti,,3 (5)the'::.- _

2.2 Terrestrial Iss'ues (

I ,I (1) l Cooling tower drift was not expected to cause adverse effects but the need the for operational data to confim this conclusion was identified by staff. (FESSection5.5.1.5) i (2)

Herbicide use should conform with current Federal and State regulation.

(FESSection5.5.1.4) .

m. l 2-1

__l PDR A PDR P

Attachm:nt 3

.. PY-CEl/NRR-2406L pig 3 2 of 2 4.0' Environmental Conditions 4.1 Unusual or Important Environmental Events Any occurrence of an unusual or important event that indicates or could result in significant environmental impact causally related to plant operation shall be recorded and reported to the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> followed by a written report per Subsection 5.4.2. The following are examples:

excessive bird impaction events, onsite plant or animal disease outbreaks, mortality or unusual occurrence of any species protected by the Endangered Species Act of 1973, fish kills, increase in nuisance organisms or conditions, and unanticipated or emergency discharge of waste water or chemical substances.

No routine monitoring programs are required to implement this condition. I 4.2 Environmental Monitoring 4.2.1 Aquatic Monitoring (1) The cer'ifications t and permits required under the clean dater Act provide mechanisms aquatic biota.

for protecting water quality and, indirectly, The NRC will rely on the decisions made by the U. S. Environmental Protection Agency and the State of Ohio under the authority of the Clean Water Act for any requirements for aquatic monitoring.

_(?) w i-annual (late spring eald early f:11) ;;;.plir.; cf ;rae; at-parry ead the lic;,;;;'; [estle' gg plant ;h;il b; ;;adgcted to detect th pretene: ef Cerbicela.

The ===n11ng methndnlany che11 h-by tha 14c ac = in its 1 tter dated that  ;;,,;,,itted t: 7,d dre ihed 0 teber ?,19n7 (py crt/ won-

-0707L}.

m __

e

'l 4-1 Amendment No. 15

,