Al Bates Manager, Regulatmy Affairs &
Oversight An EDISON llfl'ERNATTONALt> Company January 5, 2021 10 CFR 50.54{q)
U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555-0001
Subject:
Docket Nos. 50-206, 50-361, 50-362, and 72-41 Revised Emergency Plan Implementing Procedures (EPIPs)
San Onofre Nuclear Generating Station (SONGS) Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation
Dear Sir or Madam:
Pursuant to 10 CFR 50.54{q)(5), Attachment 1 of this letter provides a copy of the following revised Emergency Plan Implementing Procedure:
Procedure Rev. Effective Date EPP-1, Emergency Response 1 December 7, 2020 As specified in 10 CFR 50.54(q)(5), Attachment 2 provides a report and analysis summary for the EPIP changes. These changes do not reduce the effectiveness of the Emergency Plan or the EPIPs.
There are no commitments contained in this letter or its attachments.
Document Control Desk If you have any questions, please contact me at (949) 368-7024.
Attachments: 1. Revised Emergency Plan Implementing Procedure
- 2. Report and Analysis Summary cc: Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 1)
S. A. Morris, Regional Administrator, NRC Region IV A. M. Snyder, NRC Project Manager, SONGS Units 1, 2 and 3