ATTACHMENT 2 . Test Number RT-1 Revision Number /Date: 01. 10/01/88
(]y Frequency: Ardinal PWR SIMULATOR REAL TIME TEST I. OBJECTIVE The purpose of this procedure is to verify that the simulator is capable of operating in real time As required by ANSI /ANS 3.5-1985 " Nuclear Power Plant Simul, tor's for Use in Operator Training."
II. REFERENCES
- 1. . ANSI /ANS 3.5-1985: Nuclear Power Plant Simulator's for Use in Operator Training.
- 2. Reg Guide 1.149: Nuclear Power Plant Simulation Fecilities for Use in Operator License Examinations.
I
- 3. PWR Operations Guideline #12: Simulator Testing Program.
O 34t/1 5/89 8908020225 890727 DR ADOCK0500g{4 Q-_______-_________ _ .-_
g.
PWR SIMULATOR
, l'h REAL TIME TEST
- k. ,0 III. INITIAL CONDITIONS
- 1. The plant is at zero power, normal operating pressure and no-load temperature.
IV. DATA COLLECTION
- 1. See test instructions, step 5.
V. TEST INSTRUCTIONS
- 1. Initialize at a zero power, normal operating pressure, no-load temperature condition (IC-7).
- 2. Verify / withdraw the shutdown banks.
- 3. Verify / place rod control in manual.
4 Using a stopwatch, time the interval between Control Bank A at 0 steps until Control Bank A reaches 228 steps.
g ,
{
- 5. Record the time from Step 4. seconds y,)
VI. ACCEPTANCE CRITERIA
- 1. The simulator shall take 285 seconds i 1 second to move Control Bank A from 0 steps to 228 steps.