ML20247P893

From kanterella
Revision as of 20:48, 9 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Improved Tech Specs 5.2.1 Re Onsite & Offsite Organizations
ML20247P893
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/22/1998
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20247P885 List:
References
NUDOCS 9805280145
Download: ML20247P893 (5)


Text

. _ _ _ _ _

i FLORIDA POWER CORPORATION CRYSTAL RIVER ' UNIT 3 DOCKET NUMBER 50-302/ LICENSE NUMBER DPR-72 ATTACHMENT A LICENSE AMENDMENT REQUEST #231 REVISION 1 REDLINE / STRIKEOUT ITS PAGE Shadow / Strikeout Changes Text being added Indicated by shadowed text '

Text being deleted ladicated4>y-strikeeut-text l

l lBR'**8!ei!!888802 PDR l P ,

(

I

l' Organization 5.2 f.

5.0 ADMINISTRATIVE CONTROLS 5.2 Or'ganization 5.2.1 Onsite and Offsite Organizations Onsi_ and offsite organizations shall be established for unit l operation and corporate management, respectively. The onsite and offsite organizations shall include the positions responsible for l

activities affecting safety of the nuclear power plant.

a. responsibility, and communications shall Lines be established of authority, and defined from the highest management levels through intermediate levels to and including all operating organization positions. These relationships shall as appropriate, in the form of be documented organization and updated,ional charts, funct descriptions of department responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These shall be documented in the FSAR;
b. The Senier Vice President, "ce'e r. Ope etion: ChiiffNucleaf Officer.shall be an officer; of'the company and~shall' have ~ l corporate responsibility for overall plant ~ nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety. The ; Chi ef? Nucl ear ~ 0fficer' shall! be; responsibl e ; for the:overall' control.oversafe those operationVofLthe onsite. activities.necessary2for plantiand shall;have c the sa

_ fe operationiand maintenance of;the; plant; and u.._,_,_ ,u,i, u __, __,4ti-

_ n. _ u u - n__,u__. n__2.._.: .

1": '. l,::,' i P ' ? 7:"1""r 1 "' , 'c' 7""' C"# ,'"Y . t!, F C C"' ' " ' '

1 "; . "li ' " ' '. _ '" L I, "r ! ' " I l "" ,"; 4 .'." L r ' "" ' _ """ . '::" h '. _"" '"

1

""I, .'. T 1. ."...' : L.. '.".." .o 7, 2., ".".

. l. l_: ." c,. ' l. C.

r I 'li. ..' _. . ' ' !, '!. .". . " ' ' ' " '

.r.

dci. The individuals who-train the operating staff, carry out health physics or perform quality assurance functions may report to the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.

5.2.2 Unit Staff The unit staff organization shall include the following:

a. One auxiliary nuclear operator shall be assigned to the operating shift any time there is fuel in the reactor and (continued)
Crystal' River Unit 3- 5.0-2 Amendment No. 449

_ _____________-__________O

t i FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKFsT NUMBER 50-302/ LICENSE NUMBER DPR-72 ATTACHMENT B LICENSE AMENDMENT REQUEST #231 REVISION 1 REVISION BAR ITS PAGE

- - - _ _ _ _ _ - - - - )

o

$ Organization 5.2 5.0 ADMINISTRATIVE CONTROLS 5.2 Organization 5.2.1 Onsite and Offsite Organizations Onsite and offsite organizations shall be established for unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions responsible for activities affecting safety of the nuclear power plant.

a. Lines of authority, responsibility, and communications shall be established and defined from the highest management levels through intermediate levels to and including all operating organization positions. These relationships shall be documented and updated, as appropriate, in the form of organization charts, functional descriptions of department responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These shall be documented in the FSAR;
b. The Chief Nuclear Officer shall be an officer of the company and shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety. The Chief Nuclear Officer shall be responsible for the overall safe operation of the plant and shall have control over those onsite activities necessary for the safe operation and maintenance of the plant; and
c. The individuals who train the operating staff, carry out health physics or perform quality assurance functions may report to the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.

5.2.2 Unit Staff The unit staff organization shall include the following:

a. One auxiliary nuclear operator shall be assigned to the operating shift any time there is fuel in the reactor and (continued)

Crystal River Unit 3 5.0-2 Amendment No.

1

-=__:=_ _ _ _ _ - -