Finding | |
---|---|
Title | Fire Protection Program Change did not meet CNS License Condition Requirement 2.C.5 for Units 1 and 2 |
Description | The NRC identified a non-cited Severity Level IV violation of the Unit 1 and 2 CNS Facility Operating License, Condition 2.C.5, for the failure to implement and maintain in effect all provisions of the approved fire protection program (FPP). Specifically, the licensee made a change to the approved FPP which involved the de-rating of a credited three hour fire barrier between the control room and the cable spreading room(s) to only a pressure and smoke barrier. The licensee entered the issue in its corrective action program as AR 01932211 and it was added to existing fire watches for the area. The failure to comply with the CNS Operating License Condition 2.C.5 for a change to the approved FPP involving the de-rating of a credited three hour fire barrier between the control room and the cable spreading room(s) was a performance deficiency. The performance deficiency was more than minor because it was associated with the Mitigating Systems Cornerstone attribute of protection against external events (i.e. Fire.) The performance deficiency negatively affected the cornerstone objective in that the change to the FPP had the potential to adversely affect the availability of the control room to achieve and maintain stable plant conditions due to the increased likelihood of control room abandonment in the event of a fire in the cable spreading rooms. The licensees failure to submit the FPP change to the NRC was determined to impede the regulatory process because the FPP change required NRC review and approval prior to implementation. The finding was screened as Green because based upon inspection of the affected barriers, the inspectors determined that the barriers would provide a 1-hour or greater fire endurance rating. This violation was determined to be a Severity Level IV violation because the associated finding was evaluated by the SDP as having very low safety significance (i.e., Green finding). No cross cutting aspect was assigned because the finding was not indicative of current licensee performance. |
Site: | Catawba |
---|---|
Report | IR 05000413/2015012 Section 1R05 |
Date counted | Jun 30, 2015 (2015Q2) |
Type: | NCV: Green |
cornerstone | Initiating Events, Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | S Shaeffer D Jones J Dymek O Lopez-Santiago P Braaten P Braxton |
Violation of: | License Condition - Fire Protection License Condition |
INPO aspect | |
' | |
Finding - Catawba - IR 05000413/2015012 | |||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Catawba) @ 2015Q2