ML20244A628
| ML20244A628 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 04/03/1989 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bird R BOSTON EDISON CO. |
| Shared Package | |
| ML20244A630 | List: |
| References | |
| NUDOCS 8904180110 | |
| Download: ML20244A628 (3) | |
See also: IR 05000293/1988037
Text
_. - - _ _ _ _ - _ _ . - _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ - _ _ - _ _
..l
l l': A
.1
APR 031989
Docket No; 50-293-
Boston Edison Company
!-
,
ATTN: - Mr. Ralph G. Bird
h
'
Senior Vice President.- Nuclear
. RFD #1 Rocky Hill Road i
Plymouth, Massachusetts 02360
Gentlemen:
Subject: .NRC Region I Inspection Report No. 50-293/88-37-
~
This refers to-the inspection (50-293/88-37) conducted by the NRC Restart Staff
on December 27, 1988 to February 5,1989, at the Pilgrim Nuclear Power Station,
Plymouth, Massachusetts. Areas examined during this inspection are described
in the NRC Region I Inspection Report which is enclosed with this ' letter.
The Re' start Staff, through selected around-the-clock shift inspections and rou-
tine program . inspections, observed management controls, conduct:of. operations,
and startup testing activities during the initial phase of the' . licensee's Power
1
-Ascension Program. Based on these reviews conducted per. the NRC inspection.
plan specifically developed to cover this period, the Restart Staff determined
~
that licensee management provided ' active and effective oversight and was
T , directly Linvolved in assuring ~ safe operation.
. Results of the NRC Restart Staff inspections and assessments are taken into
'
'
- consideration . by the NRC Restart Assessment Panel during ongoing lic_ensee
performance, reviews and deliberation's at each Power Ascension Program approval
point.
<
Sincerely,
i
Original Sinned RV
Samuel J. Collins, Deputy Director
Division of Reactor Projects
Enclosure:
NRC Region I Inspection Repcrt No. 50-293/88-37
%
G
D P
OFFICIAL RECORD COPY IR PILGRIM 50-293/88-37 - 0001.0.0
03/30/89
c - - - - - - -- -- - - - - - --
g~ -
E ,
y1
t'
' Boston Edison Company. 2l -
_
-
.
cc w/ enc 1: *-
yl ..-- K. H.ighfill;: Station' Director
l; .R.l Anderson,. Plant Manager
J.< Keyes,: Licensing Division Manager
E. Robinson,~ Nuclear Information Manager
RL Swanson,. Nuclear Engineering Department Manager
The Honorable Edward J. Markey
The Honorable Edward P. Kirby ,
n The Honorable Peter V. Forman *
L .The~ Honorable Nicholas J. Costello'
The. Honorable Lawrence R. Alexander
B. McIntyre, Chairman,' Department of Public Utilities-
'
,
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Plymouth Civil: Defense Director
P- Agnes, Assistant: Secretary of Public Safety, Commonwealth of Massachuset'ts
.
S. Pollard, Massachusetts Secretary of Energy Resources
'R.'Shimshak, MASSPIRG
Public. Document Room'(PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident-Inspector
Commonwealth of Massachusetts (2)
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1) ~
-W. Russell, RA
W. Kane;-DRP
S.~ Collins, DRP
T. Martin, DRS
M. Knapp,'DRSS
J. Wiggins., DRP
L. Bettenhausen, DRP.
E.'Wenzinger, DRP
R. Blough, DRP
J. Lyash, DRS 1
i
M. Kohl, DRP
C. Warren, SRI - Pilgrim
T. Kim, RI - Pilgrim
R. Bellamy, DRSS
W.'Pasciak, DRSS (See Paragraph 5.1)
R. Bores, DRSS
J. Durr, DRS .
R.~Gallo, DRS
M. Miller, SLO
K. Abraham, PA0
B. Boger, NRR
R. Wessman, NRR
D. Mcdonald, NRR
OFFICIAL RECORD COPY IR PILGRIM 50-293/88-37 - 0002.0.0
03/29/89
- _ _ _ - _ - - - _ - _ _ _ _ - - _ - - - _ _ - _ -__ -__---- __ - _ _ --____- _ __ __ _ __ _ __ - _ _ _ _- _ _ _ _ _
-_ . _ _ _
,, ,
,
r ,
Boston Edison Company 3
APR 031989
l
J
l
.
i
.
!
h RI:DRP
CWarren/mjd
RI:DRP
RBlough
RI:DRP
%yq JWiggins
.DRP
o ins
3/d/89 3/A,/89 38//89 h/4 /89 i
0FFICIAL RECORD COPY IR PILGRIM 50-293/88-37 - 0003.0.0
03/29/89
_ - _ _ _ _ _ _ _ .__________---__-_______-____-___-____-____--_a