ML20204B924
| ML20204B924 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/31/1987 |
| From: | Reavis J DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20204B860 | List: |
| References | |
| NUDOCS 8703250180 | |
| Download: ML20204B924 (2) | |
Text
_
- o R:vicion 1
- 1 OPERATING DATA REPORT DOCKET NO. 50-269 DATE 02-16-87 COMPLETED BY .7 A - Reavis TELEPHONE 704-373-7567 OPERATING STATUS e
OC "** 1 N*
- 1. Unit Names
- 2. Reporting Period: January 1. 1987-Ja min rv 31. 1987 Year-to-date and cumulative ,
2568 capacity factors are calcu-
- 3. Licensed Thermal Power (MWt): lated using a weighted 934
- 4. Nameplate Rating (Gross MWe): average for maximum 886
- 5. Design Electrical Rating (Net MWe): dependable capacity.
- 6. Maximum Dependable Capacity (Gross MWe): 899 !
- 7. Maximum Dependable Capacity (Net MWe); 860
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons: l None
- 9. Power Level To which Restricted. If Any (Net MWel: ha
- 10. Reasons For Restrictions.lf Any:
j j l l This Month Yr..to.Date Cumulative
- 11. Hours In Reporting Period 744,0 744.0
- 118 753.0
- 12. Number Of Hours Reactor Was Critical 744.0 744.0 87 138.9
- 13. Reacter R tserve Shutdown Hours
,' , , 14. New Wa erator On.Line 744.0 744.0 83 746.1
% IS. Unit Rea<m Shutdown Hours .
j' 16. Gross Thermal Energy Generated (MWH) 1 838 472 1 838 472 202 764 577
@ 17. Gruss sicctrical Energy Generated (MWH) - 636 110 636 110 70 429 980
- 18. Net Electrical Energy Generated (MWH) 607 430 607 430 _ 66 790 474
- 19. Unit Service Factor 100.0 100.0 70.5
- 20. Unit Availability Factor 100.0 100.0 70.6
- 21. Unit Capacity Factor (Usmg MDC Net) 94.9 94.9 65.3 L. 92.2 92.2 63.5 f 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0.0 0.0 14.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
_ Refueling-July 28,1987-10 weeks
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units In Test Status a Prior to Commercial Operation): Forecast Achiesed
! INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8703250180 870313 (o/7; >
PDR ADOCK 05000269 R PDR c . _ , . , - , . - - ,- .,--+-.._,2. -
, _ - own..-.y--y , _ . - - - . - , -, --,w-..,.,_. -.---,.,.-p.,.--.v.., . . - , . . ,.,.-g
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-270 '
UNIY NAME OCONEE 2 DATE O 2/13/87 REPORT MONTH January COMPLETED BY GERALD REAVIS TELEPHONE (704)-373-7567 0 Revision 1 l MET- l R HDD l E OF l lT A SHU-l LICENSE l N Y S TING EVENT SYS- CAUSE AND CORRECTIVE D P DURATION . O DOWN REPORT TEM COMPONENT ACTION TO
. DATE T HOURS N R/X NO. CODE CODE PREVENT RECURRENCE l l-p 87 1 Fl --
A --
CH HTEXCH l HIGH STEAM GENERATOR LEVEL ;
)
l l
'I 87- 1-18 Fl 14.93 A 1 CH HTEXCH LOOSE PARTS MONITOR NOISE INVESTIGA-TION AT TOP OF STEAM GENERATOR l
l2 87- 1-18 F 11.55 H 3 HB TURBIN FEEDWATER SWING & TURDINE CONTACT l BUFFER HAD NOT BEEN RESET l l l l 2-p 87- 1-19 F --
F --
RB l CONROD HOLD AT 63% POWER DUE TO ROD l
WITHDRAWAL LIMITS I
3-p 87- 1-19 F --
A --
CH l HTEXCH HIGH STEAM GENERATOR LEVEL l
- 4-0 87- 1-26 F --
A -- ! IIB XXXXXX High Feedwater Flow I
I
/ .
l l
2' 3 4 1
F Forced Reason: Method: Exhibit G - Instructions A-Equipment Failure (Explain) 1-Manual for Preparation of Data S Scheduled B-Maintenance or test 2-Manual Scram Entry Sheets For License C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restr ic t ion 4-Other (Explain) File (NUREG-0161)
E-Operator Training & License Examination F-Administrative 5 G-Operator Error (Explain) Exhibit I - Same Source it-Other (Emplain)