ML20204B924

From kanterella
Revision as of 23:33, 30 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Rev 1 to Monthly Operating Repts for Jan 1987,including Operating Data for Unit 1 & Unit Shutdowns & Power Reductions for Unit 2
ML20204B924
Person / Time
Site: Oconee  
Issue date: 01/31/1987
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20204B860 List:
References
NUDOCS 8703250180
Download: ML20204B924 (2)


Text

_

o R:vicion 1
  • 1 OPERATING DATA REPORT DOCKET NO. 50-269 DATE 02-16-87 COMPLETED BY .7 A - Reavis TELEPHONE 704-373-7567 OPERATING STATUS e

OC "** 1 N*

1. Unit Names
2. Reporting Period: January 1. 1987-Ja min rv 31. 1987 Year-to-date and cumulative ,

2568 capacity factors are calcu-

3. Licensed Thermal Power (MWt): lated using a weighted 934
4. Nameplate Rating (Gross MWe): average for maximum 886
5. Design Electrical Rating (Net MWe): dependable capacity.
6. Maximum Dependable Capacity (Gross MWe): 899  !
7. Maximum Dependable Capacity (Net MWe); 860
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons: l None
9. Power Level To which Restricted. If Any (Net MWel: ha
10. Reasons For Restrictions.lf Any:

j j l l This Month Yr..to.Date Cumulative

11. Hours In Reporting Period 744,0 744.0
  • 118 753.0
12. Number Of Hours Reactor Was Critical 744.0 744.0 87 138.9
13. Reacter R tserve Shutdown Hours

,' , , 14. New Wa erator On.Line 744.0 744.0 83 746.1

% IS. Unit Rea<m Shutdown Hours .

j' 16. Gross Thermal Energy Generated (MWH) 1 838 472 1 838 472 202 764 577

@ 17. Gruss sicctrical Energy Generated (MWH) - 636 110 636 110 70 429 980

18. Net Electrical Energy Generated (MWH) 607 430 607 430 _ 66 790 474
19. Unit Service Factor 100.0 100.0 70.5
20. Unit Availability Factor 100.0 100.0 70.6
21. Unit Capacity Factor (Usmg MDC Net) 94.9 94.9 65.3 L. 92.2 92.2 63.5 f 22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.0 0.0 14.7
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:

_ Refueling-July 28,1987-10 weeks

25. If Shut Down At End Of Report Period. Estinated Date of Startup:
26. Units In Test Status a Prior to Commercial Operation): Forecast Achiesed

! INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8703250180 870313 (o/7; >

PDR ADOCK 05000269 R PDR c . _ , . , - , . - - ,- .,--+-.._,2. -

, _ - own..-.y--y , _ . - - - . - , -, --,w-..,.,_. -.---,.,.-p.,.--.v.., . . - , . . ,.,.-g

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-270 '

UNIY NAME OCONEE 2 DATE O 2/13/87 REPORT MONTH January COMPLETED BY GERALD REAVIS TELEPHONE (704)-373-7567 0 Revision 1 l MET- l R HDD l E OF l lT A SHU-l LICENSE l N Y S TING EVENT SYS- CAUSE AND CORRECTIVE D P DURATION . O DOWN REPORT TEM COMPONENT ACTION TO

. DATE T HOURS N R/X NO. CODE CODE PREVENT RECURRENCE l l-p 87 1 Fl --

A --

CH HTEXCH l HIGH STEAM GENERATOR LEVEL  ;

)

l l

'I 87- 1-18 Fl 14.93 A 1 CH HTEXCH LOOSE PARTS MONITOR NOISE INVESTIGA-TION AT TOP OF STEAM GENERATOR l

l2 87- 1-18 F 11.55 H 3 HB TURBIN FEEDWATER SWING & TURDINE CONTACT l BUFFER HAD NOT BEEN RESET l l l l 2-p 87- 1-19 F --

F --

RB l CONROD HOLD AT 63% POWER DUE TO ROD l

WITHDRAWAL LIMITS I

3-p 87- 1-19 F --

A --

CH l HTEXCH HIGH STEAM GENERATOR LEVEL l

  • 4-0 87- 1-26 F --

A -- ! IIB XXXXXX High Feedwater Flow I

I

/ .

l l

2' 3 4 1

F Forced Reason: Method: Exhibit G - Instructions A-Equipment Failure (Explain) 1-Manual for Preparation of Data S Scheduled B-Maintenance or test 2-Manual Scram Entry Sheets For License C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restr ic t ion 4-Other (Explain) File (NUREG-0161)

E-Operator Training & License Examination F-Administrative 5 G-Operator Error (Explain) Exhibit I - Same Source it-Other (Emplain)