ML20199C482

From kanterella
Revision as of 01:22, 20 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Change in Room Number & Purpose for 971114 Meeting W/Fpc Re Control Complex Habitability Envelope - Working Level Techincal Discussions & Request for Addl Info Dtd 971105 Re SBLOCA
ML20199C482
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/04/1997
From: Raghavan L
NRC (Affiliation Not Assigned)
To: Hebdon F
NRC (Affiliation Not Assigned)
References
NUDOCS 9711200030
Download: ML20199C482 (4)


Text

_

0 11/6/97 - NOTE CHANGE IN ROOM NUMBER AND PURPOSE November 4, 1997 MEMOR/ NDUM T0: Frederick J. Hebdon. Director Project Directorate 11-3 Division of Reactor Projects - 1/11 FROM: L. Raghavan. Project Manager Project Directorate 11-3 Division of Reactor Projects - 1/11

SUBJECT:

MEETING WITH FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DATE & TIME: November 14, 1997 9:00 AM LOCATION: USNRC. One White Flint North 11555 Rockville Pike Rockville. Maryland Room 0 3B4 PURPCSE: Corarol complex habitability envelope Working level technical discussions, and the staff's Request for Additional Infor.,ation dated 11/5/97, regarding Small-Break LOCA.

  • PARTICIPANTS: igC Florida Power Corocration L. Raghavan M. Rencheck, et al.

F. Hebdon J. Hayes S. LaVei 0:un NBC RLE CENTER CDPV Docket No. 50 302 U"

  • 9" " "

cc: See next page 3bl4SN471  !

0

  • Meetings between NRC technical staff and applicants or licensees are open for inteiested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy." 59 Federal Reaister 48344. 9/20/94.

Document Name: G:\ CRYSTAL \971114_R.N0T ll}l ll

}l}lll lilllll Office PM:PDil-3 LA:PDil-3 PD:PDil-3 Name LRaghavan BClafypV FHebdonfqd ,_

Date 11/h /97 M 11/ b/97 11/l./97 Copy @/No Yes/No Yes/No 0FFICIAL RECORD COPY DR DON O 302 P PDR _ ,

p s * "'eg\ UNITED STATES

. s* P; NUCLEAR REGULATORY COMMISSION j WASHINGTON. D.C. speeHoot

% f 3....' 11/6/97 - NOTE CHANGE IN R00H NUMBER AND PURPOSE November 4. 1997 l

NEMORANDUM T0: Frederick J. Hebdon. Director Project Directorate 11-3 Division of Reactor Projects - I/II FROM: L. Raghavan. Project Manager b ,

Project Directorate 11 3 Division of Reactor Projects - I/II

SUBJECT:

HEETING WITH FLORIDA POWER CORPORATION CRYSTAL RIVER UNil,3 DATE & TIME: November 14, 1997 9:00 AM LOCATION: USNRC, One White Flint North 11555 Rockville Pike Rockville. Maryland Room 0-3B4 PURPOSE: Control complex habitability envelope - Working level technical discussions, and the staff's Request for Additional Infonaation dated 11/5/97, regarding Small-Break LOCA.

  • PARTICIPANTS: EG Florida Power Corooration L. Raghavan M. Rencheck, et al.
i. Hebdon J. Hayes S. LaVei R. Schin W. LeFave Docket No. 50-302 cc: See next page CONTACT: L. Raghavan. NRR 301/415-1471
  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, inter.anors, or other parties

< to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy." 59 Federal Reaister 48344. 9/20/94.

. Florida Power Corporation' CRYSTAL RIVER UNIT No. 3 GENERATING PLANT cc:

Mr. R. Alexander Glenn Mr. Robert E. Grazio, birector Corporate Counsel Nuclear Regulatory Affairs (SA2A) .

Florida Power Corporation Florida Power Corporation MAC-ASA Crystal River Energy Complex P.O. Box 14042 15760 W. Power Line Street St. Petersburg, Florida 33733-4042 Crystal River, Florida 34428-6708 Mr. Charles Pardee, Director Senior Resident Inspector Nuclear Plant Operations (NA2C) Crystal River Unit 3 Florida Power. Corporation U.S. Nuclear Regulatory Commission Crystal River Energy Complex 6745 N. Tallahassee Road 15760 W. Power Line Street Crystal River, Florida 34428 Crystal River, Florida 34428-6708 Mr. James S. Baumstark Mr. Bruce J. Hickle, Director Director, Quality Programs (SA20)

Pirector, Restart (NA20) Florida Power Corporation llorida Powe' ~poration Crystal River Energy Complex Crystal River E:.ergy Complex 15760 W. Power Line Street 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Regional Administrator, Region 11 Mr. Robert B. Borsum U.S. Nuclear Regulatory Commission framatome Technologies Inc. 61 Forsyth Street, SW., Suite 23T85 1700 Rockville Pike, Suite 525 Atlanta, GA 30303-3415 Rockville, Maryland 20852 Mr. John P. Cowan Mr. Bill Passetti Vice President - Nuclear Production Office of Radiation Control (NA2E)

Department of Health and Florida Power Corporation Rehabilitative Services Crystal River Energy Complex 1317 Winewood Blvd. 15760 W. Power Line Street

  • Tallahassee, Florida 32399-0700 Crystal River, Florida 34428-6708 Attorney General Mr. Roy A. Anderson Department of Legal Affairs Senior Vice President The Capitol Nuclear Operations Tallahassee, Florida 32304 Florida Power Corporation ATTN: Manager, Nuclear Licer. sing Mr. Joe Myers, Director Crystal River Energy Complex (SA2A)

Division of Emergency Preparedness 15760 W. Power Line Street Department of Community Affairs Crystal River, Florida 34422-6708 2740 Centerview Drive Tallahassee, Florida 32399-2100 Nr. Kerry Landis U.S. Nuclear Regulatory Commission Chairman 61 Forsyth Street, SW., Suite 23T85 Board of County Commissioners Atlanta, GA 30303-3415 Citrus County 110 North Apopka Avenue Iverness, Florida 34450-4245

-w-- , +-e - .e e er

a DISTRIBUTION FOR MEETING NOTICE DATED: November 6. 1997 E-Mail S. Collins /F. Miraglia R. Zinrnerman (RPZ)

B. Boger (BAB2)

J. Zwolinski (JAZ)

F. Hebdon (FJH)

L. Raghavan (LXRI)

B. Clayton (BAC2)

OPA (0PA)

J. Johnson (JRJ)

J. Jaudon (JPJ)

S. Cahill (SJC2)

K. Clark (KMC2), Region II J. Hayes S. LaVei R. Schin W. I.efave PMNS Hard Cooy Docket File PUBLIC Crystal River Rdg.

0GC ACRS Receptiorist ,

t i

- _