Forwards Request for Addl Info Re Generic Ltr 83-28,Items 2.2.1,2.2.2,4.3,4.5.2 & 4.5.3 on safety-related Items, Nuclear Util Task Action Committee Program & Tech Spec Proposal,Per Generic Ltr 85-09
ML20199K066
Person / Time
Site: Beaver Valley
Issue date: 06/27/1986
From: Tam P
Office of Nuclear Reactor Regulation
To: Carey J
DUQUESNE LIGHT CO.
References
GL-83-28, GL-85-09, GL-85-9, NUDOCS 8607090029
Download: ML20199K066 (3)


Text

.

June 27, 1986 Docket No. 50-412 , DISTRIBUTION Docket = File.9 P. Tam NRC PDR D. Miller Local PDR ACRS (10)

Mr. J. J. Carey, Vice President PAD #2 Rdg N. Thompson, DHFT Duquesne Light Company T. Novak D. Lasher Nuclear Group OELD EICSB Post Office Box 4 E. Jordan Gray File Shippingport, PA 15077 8. Grimes J. Partlow

Dear Mr. Carey:

Subject:

Request for Additional Information, Beaver Valley Unit 2, Response to Items 2.2.1, 2.2.2, 4.3, 4.5.2 and 4.5.3 of Generic Letter 83-28 By letter dated Merch 30, 1984, Duquesne Light Company responded to the subject Generic Letter. Our review of your submittal is ongoing. However, we determined that additional information is needed to complete our review of the subject items. Details may be found in the enclosure. Please respond within 45 days '

of receipt of this letter.

This information request affects fewer than 10 respondents; therefore OMB clearance is not required under P.L.96-511.

Sincerely,

/s/

Peter S. Tam, Project Manager PWR Project Directorate #2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation cc: See next page L : pap #2 PM: PAD # EICS M v UkIDMcDpnald

. PAD #2 DM er PTam:he k- DL 6/

EF 86 U

, / 6/73 /86 6/).'f/86 8607090029 860627 PDR ADOCK 05000412 A PDR

Mr. J. J. Carey Duquesne Light Company Beaver Valley 2 Power Station cc:

Gerald Charnoff, Esq. Mr. R. E. Martin, Manager Jay E. Silberg, Esq. Regulatory Affairs Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 1800 M Street, N.W. Beaver Valley Two Project Washington, DC 20036. P. O. Box 328 Shippingport, Pennsylvania 15077 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager Assistant Counsel Quality Assurance Department Governor Energy Council Duquesne Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 Director, Pennsylvania Emergency Management Agency Room B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17120 Mr. T. J. Lex Mr. Thomas Gerusky Westinghouse Electric Corporation Bureau of Radiation Protection Power Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg, Pennsylvania 17170 Mr. P. RaySircar Stone & Webster. Engineering Corporation BVPS-2 Records Management Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. W. Troskoski U. S. NRC John A. Lee, Esq.

P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 15229 t

REQUEST FOR ADDITIONAL INFORMATION

. BEAVER VALLEY UNil 2 GENERIC LtIItR 83-28 (1) Item 2.2.1 - Incomplete Applicant responded to items 2.2.1.1 to 2.2.1.6 but still needs to provide additional information in response to items 2.2.1.2 and 2.2.1.4. For Item 2.2.1.2, applicant should describe how new safety-related items are entered; how _ changes in classification of listed items are made; how listed items are verified; how unauthorized changes to the infomation system are prevented; and how the information system will be maintained and distributed to users as a single, unambiguous and consistent version.

For Item 2.2.1.4, the applicant should describe the means by which the plant and corporate management assure themselves that these procedures are being correctly and consistently applied.

(2) Item 2.2.2 - Incomplete Applicant needs to present his evaluation of NUTAC program and describe how it will be implemented at Beaver Valley Unit 2. Accordingly, the applicant will need to supplement his response to address the concerns associated with implementation at Beaver Valley Unit 2 of measures to improve the NPRDS and SEE-IN programs outlined in the NUTAC report.

(3) Item 4.3 - Incomplete Applicant needs to commit to and implement the WOG design or its equivalent for automatically actuating the shunt trip attachment on the reactor trip breakers and address the plant-specific concerns put forth in the NRC SER on the WOG design.

(4) Item 4.3 Technical Specifications - Incomplete Applicant should submit proposed technical specification in accordance with the guidance provided in Generic Letter 85-09.

(5) Item 4.5.2 - Incomplete Applicant should verify that on-line testing of the RTS will be perfomed on a regular basis as per technical specifications, which includes independent on-line testing of the diverse trip features.

l (6) Item 4.5.3 - Incomplete Need a description of the specific implementation plan for Beaver Valley Unit 2 after NRC reviewed the technical report WCl,P-10271 and supplement 1.