MONTHYEARML20197H8581990-11-14014 November 1990 Summarizes ACRS 367th Meeting on 901108-10 Re SECY-90-353 Concerning Licensing Review Basis Document for C-E ML20059L0071990-09-12012 September 1990 Notification of 901003 Meeting W/Abb C-E in Rockville,Md to Discuss Sys 80+ Seismic Envelope & Design ML20246E2921989-08-17017 August 1989 Forwards Licensing Review Basis for CESSAR-DC.Document Establishes Schedule & Process for Design Certification Review of C-E Sys 80+ ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H7651989-04-25025 April 1989 Requests Input Re Acceptability of C-E 890330 Design Certification Application for Sys 80+ Std Design ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20195K3481988-11-28028 November 1988 Notification of 881220 Meeting w/C-E in Rockville,Md to Discuss Seismic Issues Involved in Containment Design for CESSAR-DC Sys 80e Re Soil/Structure Interaction Phase ML20197D8161988-06-0202 June 1988 Notification of 880628 Meeting w/C-E in Rockville,Md to Discuss Proposed Changes to CESSAR-DC,Sys 80+ QA Program ML20154E8081988-05-12012 May 1988 Notification of 880601 Meeting w/C-E in Rockville,Md to Discuss Proposed Changes to CESSAR-DC,Sys 80+ QA Program ML20148C8221988-01-13013 January 1988 Notification of 880126 Meeting w/C-E in Bethesda,Md to Discuss base-line PRA for Sys 80+ design,CESSAR-DC.Portions of Meeting Will Be Proprietary ML20147C3881988-01-11011 January 1988 Notification of 880127 Meeting w/C-E in Bethesda,Md to Discuss Steam Generator Vibration Issue for Sys 80 Design ML20236W9231987-12-0303 December 1987 Requests That Encl Matl Re Sys 80 Should Be Added to File for Docket.Info Transmitted by C-E Via Telecopy on 871130, Per 871119 Telcon ML20197A8741986-10-22022 October 1986 Notification of 861024 Meeting w/C-E in Bethesda,Md to Discuss Submittal Re CESSAR ML20136H6051985-08-16016 August 1985 Notification of 850821 Meeting w/C-E in Bethesda,Md to Discuss Status of CESSAR Sser 3 & FDA-2 Amend ML20140G8031985-06-13013 June 1985 Requests Set of Questions/Issues for Consideration as Discussion Topics at Upcoming ACRS C-E Subcommittee Meeting as Result of ACRS 302nd Meeting Re DHR Sys & Rapid Depressurization Capability ML20054G5821982-06-15015 June 1982 Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components ML20054G5871982-05-12012 May 1982 Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful ML20213E1231982-02-26026 February 1982 Notification of Assistant Director 820303 Meeting in Bethesda,Md to Resolve Outstanding Licensing Issues 1990-09-12
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20197H8581990-11-14014 November 1990 Summarizes ACRS 367th Meeting on 901108-10 Re SECY-90-353 Concerning Licensing Review Basis Document for C-E ML20059L0071990-09-12012 September 1990 Notification of 901003 Meeting W/Abb C-E in Rockville,Md to Discuss Sys 80+ Seismic Envelope & Design ML20246E2921989-08-17017 August 1989 Forwards Licensing Review Basis for CESSAR-DC.Document Establishes Schedule & Process for Design Certification Review of C-E Sys 80+ ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H7651989-04-25025 April 1989 Requests Input Re Acceptability of C-E 890330 Design Certification Application for Sys 80+ Std Design ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20195K3481988-11-28028 November 1988 Notification of 881220 Meeting w/C-E in Rockville,Md to Discuss Seismic Issues Involved in Containment Design for CESSAR-DC Sys 80e Re Soil/Structure Interaction Phase ML20197D8161988-06-0202 June 1988 Notification of 880628 Meeting w/C-E in Rockville,Md to Discuss Proposed Changes to CESSAR-DC,Sys 80+ QA Program ML20154E8081988-05-12012 May 1988 Notification of 880601 Meeting w/C-E in Rockville,Md to Discuss Proposed Changes to CESSAR-DC,Sys 80+ QA Program ML20148C8221988-01-13013 January 1988 Notification of 880126 Meeting w/C-E in Bethesda,Md to Discuss base-line PRA for Sys 80+ design,CESSAR-DC.Portions of Meeting Will Be Proprietary ML20147C3881988-01-11011 January 1988 Notification of 880127 Meeting w/C-E in Bethesda,Md to Discuss Steam Generator Vibration Issue for Sys 80 Design ML20236W9231987-12-0303 December 1987 Requests That Encl Matl Re Sys 80 Should Be Added to File for Docket.Info Transmitted by C-E Via Telecopy on 871130, Per 871119 Telcon ML20197A8741986-10-22022 October 1986 Notification of 861024 Meeting w/C-E in Bethesda,Md to Discuss Submittal Re CESSAR ML20136H6051985-08-16016 August 1985 Notification of 850821 Meeting w/C-E in Bethesda,Md to Discuss Status of CESSAR Sser 3 & FDA-2 Amend ML20140G8031985-06-13013 June 1985 Requests Set of Questions/Issues for Consideration as Discussion Topics at Upcoming ACRS C-E Subcommittee Meeting as Result of ACRS 302nd Meeting Re DHR Sys & Rapid Depressurization Capability ML20054G5821982-06-15015 June 1982 Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components ML20054G5871982-05-12012 May 1982 Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful ML20213E1231982-02-26026 February 1982 Notification of Assistant Director 820303 Meeting in Bethesda,Md to Resolve Outstanding Licensing Issues 1990-09-12
[Table view] |
Text
4 c
'. '. Hov2mber 28, 1988 Project No. 675 HEMORANDLH FOR: Charles L. Miller, Director z
Standardization and Non-Power Reactor Project Directorate I 1
Division of Reactor Projects ill, IV, Y and Special Projects r i
1 FRON: Guy S. Vissing, Project Manager Standardizaticn and Non-Power i Reactor Project Directorate '
Division of Reactor Projects III, IV, '
V and Specici Prcjects !
SUBJECT:
NOTICE OF NEETING TO DISCUSS CONTAIhMENT DESIGN, SE!SHIC DES!GN - SOIL / STRUCTURE INTERACTION
! PNASE - CESSAR-DC, SYSTEM 80+ DESIGN l l
- DATE & TIME
- December 20, 1988
- 9
- 00am - 4:00pm i i i 1 LOCATION: One White Flint North
! 115C5 Rockville Pike ,
t Rockville, Maryland 20852 :
) Room 14B-13 l l
l PURPOSE: To discuss Seismic issues involved in Containment [
. design for System 80+ - Soil / Structure Interaction ;
- Phase - See Agenda ;
i i t PARTICIPANTS: NRC COMBUSTION ENGINEERING :
a t
l G. Vissing S. Ritterbusch, CE !
i G. Bagcht G. David, CE :
l L. Reiter Wm. Fox, Duke Power I R. Pichumani R. Kennedy, Independent [
i Consultant !
N, Romney Woodward Clyde, Consultants l j /s/
Guy S. Vissing, Project Manager l
! Standardization and Non-Power '
Reactor Project Directorate ;
isivision of Reactor Projects - !!!, IV, j V and Special Projects ;
i 5
l Meetings between NRC technical staff and applicants or licensees are open for / lj !
l interested renbers of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff i j}.
'h,I '
Policy", 43 Federal Register 208058, 6/28/78.
~
,. 's !
l i 4
Ftt:
GV P
ng:cw OFo3 '[h 1
l l 11/e/88 ss120 t89 ss1123 { i1 !
i PDR j6
I
[,sa ue:\ UNITED STATES i ! a NUCLEAR REGULATORY COMMISSION
{ ] wAsHiwoTow, o. c. noses
,/ November 28, 1988 Pro, ject No. 675 MEMORANDUM FOR: Chaales L. Miller, Director Standardization and Non. Power Reactor Project Directorate Division of Reactor Projects !!!, IV, Y and Special Projects FROM: Guy S. Vissing, Project Manager StMdardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects
SUBJECT:
NOTICE OF MEETING TO DISCUSS CONTAINMENT DESIGN,
. SEISMIC DESIGN - S0IL/ STRUCTURE INTERACTION HlASE - CESSAR-DC, SYSTEM 80+ DESIGN
< DATE & TIME: Decen6er 20,1988 9:00am - 4:00 psi LOCATION: bre White Flint North f 11555 Rockville Pike Rockville, Maryland 20852 Room 14B-13 PURPOSE: To d'scuss Seismic issues involved in Containment design for System 80+ - Soil / Structure Interaction Phase - See Agenda PARTICIPANTS: NRC COMBUSTION ENGINEERING G. Vissing S. Ritterbusch, CE G. Bagchi G. David, CE L. Reiter Wm. Fox, Duke Power R. Pichumant R. Kennedy, Independent Consultant N. Ror.ney Woodward Clyde, Consultants Guy S. ' 1ssing, Project Manager Standaroization and Non-Power Reactor Project Directorate Division of Reactor Projects - I!!, IV, y and Special Projects Meetings between NRC technical staff and applicants or licensees are open for interested meebers of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Staterent of NRC Staff Policy", 43 Federal Register 208058,6/28/78.
C-E/ DOE ALWR CERTIFICATION CONTAINMENT DESIGN S0!L-STRUCTURE INTERACTION PHASE PROPOSED AGENDA NRC MEETING DECEMBER 20,1988 DISCUSSION ITEM SPEAKER
- 1) Introduction / Briefing on the ALWR Certification C-E Program
- 2) Design Basis Event: OBE vs. SSE C-E Specification of rock outcrop peak acceleration for OBE and SSE. Development of spectral amplifications.
- 3) Free-Field Ground Motion W/C Generation of free-field ground motion to be applied as control rotion for SS! analysis: site response r analysis methodology and results. t
- 4) Site Profiles and Soil Parameters W/C Development of site categories. Development of soil profiles and soil parameters for SS! analysis.
- 5) Structural Model Development Methodology C-E Methodology to develop finite element model of Reactor Building. Methodology to develop equivalent stick model for SSI analysis.
- 6) Soil-Structure Interaction Analyses Methodology C-E Methodology to perform soil-structure interaction analysis: modeling of soil, foundation embedment; coupling of structure to soil; applicatlon of control motion.
- 7) Utilization of SSI Results C-E
- 8) Conclusion of Topics Presentation C-E
- 9) Discussion / Questions and Answers All C-E - Combustior. Engineering W/C - Woodward Clyde Consultants
i
[ '
NRC POR !
J PDSNP Rdg i 4 TMurley/JSniezek !
FMiraglia l GHolahan f
- GVissing {
Kanning 0GC-Rockville r
, EJordan SGrimes NRC Participants ACRS(10)
GPA/PA 2
Wilson !
a !
.i ;
4 i b
i i
r i I I
r i
i i