list | - Information Notice 2005-02, Pressure Boundary Leakage Identified on Steam Generator Bowl Drain Welds (4 February 2005, Topic: Boric Acid, Stress corrosion cracking, Pressure Boundary Leakage)
- Information Notice 2005-04, Single-Failure and Fire Vulnerability of Redundant Electrical Safety Buses (14 February 2005, Topic: Safe Shutdown)
- Information Notice 2005-05, Improving Material Control and Accountability Interface with Criticality Safety Activities at Fuel Cycle Facilities (10 March 2005)
- Information Notice 2005-07, Results of Hemyc Electrical Raceway Fire Barrier System Full Scale Fire Testing (1 April 2005, Topic: Fire Barrier, Hemyc)
- Information Notice 2005-08, Monitoring Vibration to Detect Circumferential Cracking of Reactor Coolant Pump and Reactor Recirculation Pump Shafts (5 April 2005)
- Information Notice 2005-09, Official Exhibit - ENT000527-00-BD01 - NRC Information Notice 2005-09, Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-to Tubesheet Welds (Apr. 7, 2005) (7 April 2005)
- Information Notice 2005-11, Internal Flooding/Spray-Down of Safety-Related Equipment Due to Unsealed Equipment Hatch Floor Plugs And/Or Blocked Floor Drains (6 May 2005)
- Information Notice 2005-11, Internal Flooding/Spray-Down of Safety-Related Equipment Due to Unsealed Equipment Hatch Floor Plugs and/or Blocked Floor Drains (6 May 2005, Topic: Internal Flooding)
- Information Notice 2005-12, Excessively Large Criticality Safety Limits Fail to Provide Double Contingency at Fuel Cycle Facility (17 May 2005, Topic: Hemyc)
- Information Notice 2005-13, Potential Non-Conservative Error in Modeling Geometric Regions in the Keno-V. a Criticality Code (17 May 2005, Topic: Hemyc)
- Information Notice 2005-14, Fire Protection Findings on Loss of Seal Cooling to Westinghouse Reactor Coolant Pumps (1 June 2005, Topic: Safe Shutdown, Probabilistic Risk Assessment, Significance Determination Process, Fire Protection Program)
- Information Notice 2005-15, Three-Unit Trip and Loss of Offsite Power at Palo Verde Nuclear Generating Station (1 June 2005)
- Information Notice 2005-16, Outage Planning and Scheduling - Impacts on Risk (20 June 2005, Topic: Time to boil)
- Information Notice 2005-17, Manual Brachytherapy Source Jamming (23 June 2005, Topic: Brachytherapy)
- Information Notice 2005-18, Summary of Fitness-For-Duty Program Performance Reports for Calendar Years 2001, 2002 and 2003 (15 July 2005, Topic: Fitness for Duty, Contraband, Stolen)
- Information Notice 2005-20, Electrical Distribution System Failures Affecting Security Equipment (19 July 2005)
- Information Notice 2005-21, Plant Trip and Loss of Preferred AC Power From Inadequate Switchyard Maintenance (21 July 2005)
- Information Notice 2005-21, Plant Trip and Loss of Preferred AC Power from Inadequate Switchyard Maintenance (21 July 2005)
- Information Notice 2005-22, Inadequate Criticality Safety Analysis of Ventilation Systems At Fuel Cycle Facilities (29 July 2005, Topic: Brachytherapy)
- Information Notice 2005-22, Inadequate Criticality Safety Analysis of Ventilation Systems at Fuel Cycle Facilities (29 July 2005, Topic: Brachytherapy)
- Information Notice 2005-24, Nonconservatism in Leakage Detection Sensitivity (3 August 2005, Topic: Pressure Boundary Leakage)
- Information Notice 2005-26, Results of Chemical Effects Head Loss Tests In a Simulated PWR Sump Pool Environment (16 September 2005)
- Information Notice 2005-26, Results of Chemical Effects Head Loss Tests in a Simulated PWR Sump Pool Environment (16 September 2005)
- Information Notice 2005-27, Low-Dose-Rate Manual Brachytherapy Equipment-Related Medical Events (7 October 2005, Topic: Fire Barrier, RAMQC, Hemyc, Brachytherapy)
- Information Notice 2005-28, Inadequate Test Procedure Fails to Detect Inoperable Criticality Accident Alarm Horns (31 October 2005, Topic: Fire Barrier, RAMQC, Hemyc, Brachytherapy)
- Information Notice 2005-29, Steam Generator Tube and Support Configuration (27 October 2005)
- Information Notice 2005-30, Safe Shutdown Potentially Challenged by Unanalyzed Internal Flooding Events and Inadequate Design (7 November 2005, Topic: Safe Shutdown, Internal Flooding)
- Information Notice 2005-30, Safe Shutdown Potentially Challenged By Unanalyzed Internal Flooding Events and Inadequate Design (7 November 2005, Topic: Safe Shutdown, Internal Flooding)
|
---|