ML20155A848

From kanterella
Revision as of 03:17, 22 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-395/88-17 on 880801-31 & Notice of Violation
ML20155A848
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/16/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Bradham O
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20155A851 List:
References
NUDOCS 8810060097
Download: ML20155A848 (2)


See also: IR 05000395/1988017

Text

_ _ _ _ _ _ _ _ - _ _ _ .

. _ _ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

~

.

'

..

  • -

01 '

,

SEP 16 Beg

Docket No. 50-395

License No. NPF-12

South Carolina Electric and Gas Company

ATTN://Mr.O.S.Bradham,VicePresident

Nuclear Operations

P. O. Box 88

Jenkinsville, SC 29065

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT N0. 50-?95/88-17)

1his refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by R. L. Prevatte on August 1 - 31, 1988. The inspection included a review

of activities authorized for your V. C. Sumer Nuclear Facility. At the

conclusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed inspection Report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation ci

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violation, references to pertinent requirements, and

elements to be included in your response are described in the enclosed Notice

of Violation.

Your attention is invited to the unresolved iten identified in the Inspection

Report. This matter will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosures are not subject to

the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

8G10060097 880916

PCR ADOCK 05000395 (l\

Q FDC

2 0/

<

, . .

.

South Carolina Electric and Gas 2

SEP 16 bd8

Company

Should you have any questions concerning tnis letter, please contact us.

Sincerely,

ORiotNAL 3roppo gy

DAVID M. VERREtu

David M. Verrelli, Chief

Reector Projects Branch 1

Division of Reactor Projects

Enclosures:

1. Notica of Violation

2. NRC inspection Report

cc w/encls:

V. S L. Skolds, General Manager

~ Nuclear Plant Operations

J. B. Knotts, Jr.

, Bishop, Cook, Purcell & Reynolds

'W. A. Williams, Jr., Technical

Assistant, Nuclear Operations -

Santee Cooper

'A. R. Koon, Jr. , Manager

Nuclear Licensing

",R. E. Rainear, Executive Vice President,

South Carolina Public Service Authority

LK. E. Beale, Manager

Nuclear Protection Services

State of South Carolina

bcc w/encis:

UNRC Resident Inspector

ORS, Technical Assistant

LJ. J. Hayes, Project Manager, NRR

Ri! RIl

90S gD

SVias:ser HDance

09/j(/88 09/g(/88