ML20125E122

From kanterella
Revision as of 19:21, 12 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Feb 1992 for Cooper Nuclear Station
ML20125E122
Person / Time
Site: Cooper 
Issue date: 02/29/1992
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20125E109 List:
References
NUDOCS 9212160196
Download: ML20125E122 (1)


Text

.

OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT CNS DATE March 10. 1992 OPERATING STATUS TELEPHONE _( 402) 825-5766

1. Unit Name: COooet Nuclear Station Notes
2. Reporting Period; February 1992 3 Ucensed Thermal Power (MWt): 2381
4. Nameplate Rating (Gross MWe): 836
5. Design Electrical Rating (Net MWe): 778 6 Maximum Dependable Capacity (Gross MWe): 787
7. Maximum Dependable Capacity (Net MWe): 764 8 If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons: _
9. Power Level To Which Restricted, if Any (Net MWe):
10. Reasons For Restrict:on,if Any:

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 696 0 1.440.0 154.873 0
12. Number of Hours Reactor Was Critical 576 7 1,320.7 117.821.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Une 565_0_ 0 1.309 0 116.081.5
15. Unit Reserve Shutdown Hours 00 00 0.0
16. Gross Thermal Energy Generated (MWH) _1.280.256 0 3.041.544.0 236.597.596 0
17. Gross Electric Energy Generated (MWH) 426.823 0 1.018.966.0 76.589.118.0 18 Not Electric Energy Generated (MWH) 414.200.0 987.589 0 73.917.976 0
19. Unit Service Factor 81.2 90.9 75 0 20 Unit Availability Factor 81.2 90.9 75.0
21. Unit Capacity Factor (Using MDC Net) 77.9 89 8 62_5._
22. Unit Capacity Factor (U9q DER Net) 76 5 88.2 61.3
23. Unit Forced Outage Rate 18 8 9.1 4.6 24 Shutdown Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

BaMery replacement shutdown - April 17. Duration 7 days 25 If Shut Down At End of Report Period, Estimated Date of Startup:

26 Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITlAL CRITICAUTY INITIAL ELECTRICITY COMMERCLAL OPERATION 9212160196 921204 PDR ADOCK 05000298 R PDR

-- _ _ - __-__ _ - - __ _ _ _ - - _ _ - _ _ _ _ -___