ML20138J246
From kanterella
ML20138J246 | |
Person / Time | |
---|---|
Issue date: | 01/31/1997 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
NUREG-0040, NUREG-0040-V20-N03, NUREG-40, NUREG-40-V20-N3, NUDOCS 9702060133 | |
Download: ML20138J246 (147) | |
Similar Documents from Office of Nuclear Reactor Regulation | |
---|---|
Category:NUREG REPORTS
MONTHYEARML20216G0111999-09-30030 September 1999
[Table view]Some use of "" in your query was not closed by a matching "".Year 2000 Readiness in U.S. Nuclear Power Plants ML20211J9931999-08-31031 August 1999 Generic Environmental Impact Statement for License Renewal of Nuclear Plants.Main Report.Section 6.3 - Transportation, Table 9.1 Summary of Findings on NEPA Issues for License Renewal of Nuclear Power Plants.Final Report ML20206N2191999-04-30030 April 1999 Operator Licensing Examination Standards for Power Reactors ML20205A5291999-03-31031 March 1999 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1998.(White Book) ML20205A5991999-03-31031 March 1999 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1998.(White Book) ML20211K2851999-03-31031 March 1999 Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance ML20203D0541999-01-31031 January 1999 Fire Barrier Penetration Seals in Nuclear Power Plants ML20155A9281998-10-31031 October 1998 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,April-June 1998.(White Book) ML20154C2081998-09-30030 September 1998 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,January-March 1998.(White Book) ML20153D3371998-07-31031 July 1998 Assessment of the Use of Potassium Iodide (Ki) as a Public Protective Action During Severe Reactor Accidents.Draft Report for Comment ML20203A1521998-07-31031 July 1998 Assessment of the Use of Potassium Iodide (Ki) as a Public Protective Action During Severe Reactor Accidents.Draft Report for Comment ML20236S9771998-06-30030 June 1998 Knowledge and Abilities Catalog for Nuclear Power Plant Operators.Pressurized Water Reactors ML20236S9591998-06-30030 June 1998 Knowledge and Abilities Catalog for Nuclear Power Plant Operators.Boiling Water Reactors ML20236S9681998-06-30030 June 1998 Evaluation of AP600 Containment THERMAL-HYDRAULIC Performance ML20247E3951998-04-30030 April 1998 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1997.(White Book) ML20217F3801998-03-31031 March 1998 Risk Assessment of Severe ACCIDENT-INDUCED Steam Generator Tube Rupture ML20197B2091997-12-31031 December 1997 Standard Review Plan on Antitrust Reviews.Final Report ML20202J3051997-11-30030 November 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1997.(White Book) ML20197B0431997-11-30030 November 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,April-June 1997.(White Book) ML20211L2931997-09-30030 September 1997 Aging Management of Nuclear Power Plant Containments for License Renewal ML20198G2881997-08-31031 August 1997 Environmental Standard Review Plan.Standard Review Plans for Environmental Reviews for Nuclear Power Plants ML20210K7801997-08-31031 August 1997 Topical Report Review Status ML20149G9431997-07-31031 July 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,January-March 1997.(White Book) ML20140F0801997-05-31031 May 1997 Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design.Supplement No. 1.Docket No. 52-001.(General Electric Nuclear Energy) ML20140J4301997-05-31031 May 1997 Safety Evaluation Report Related to the Department of Energy'S Proposal for the Irradiation of Lead Test Assemblies Containing TRITIUM-PRODUCING Burnable Absorber Rods in Commercial LIGHT-WATER Reactors ML20210R2131997-05-31031 May 1997 Final Safety Evaluation Report Related to the Certification of the System 80+ Design.Docket No. 52-002.(Asea Brown Boveri-Combustion Engineering) ML20141J9391997-04-30030 April 1997 Safety Evaluation Report Related to the Renewal of the Operating License for the Research Reactor at North Carolina State University ML20141A5791997-04-30030 April 1997 Proposed Regulatory Guidance Related to Implementation of 10 CFR 50.59 (Changes, Tests, or Experiments).Draft Report for Comment ML20141C2411997-04-30030 April 1997 Circumferential Cracking of Steam Generator Tubes ML20137A2191997-03-31031 March 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1996.(White Book) ML20135E8131997-02-28028 February 1997 Evaluation Criteria for COMMUNICATIONS-RELATED Corrective Action Plans ML20134L3601997-01-31031 January 1997 Standard Review Plan on Antitrust.Draft Report for Comment ML20134L3631997-01-31031 January 1997 Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance.Draft Report for Comment ML20138J2461997-01-31031 January 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1996.(White Book) ML20135D5711997-01-31031 January 1997 Operator Licensing Examination Standards for Power Reactors ML20133E9161996-12-31031 December 1996 License Renewal Demonstration Program: NRC Observations and Lessons Learned ML20135A5121996-11-30030 November 1996 Standard Review Plan Maintenance Program Implementing Procedures Document ML20135A4981996-10-31031 October 1996 Historical Data Summary of the Systematic Assessment of Licensee Performance ML20149L8261996-10-31031 October 1996 Reactor Pressure Vessel Status Report ML20058N6411993-11-30030 November 1993 Guidelines for Inservice Testing at Nuclear Power Plants. Draft Report for Comment ML20058N5831993-11-30030 November 1993 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1993.(White Book) ML20062J4761993-10-31031 October 1993 Revised Livermore Seismic Hazard Estimates for 69 Nuclear Power Plant Sites East of the Rocky Mountains.Draft Report for Comment ML20057E5921993-09-30030 September 1993 Auxiliary Feedwater System RISK-BASED Inspection Guidance for the DAVIS-BESSE Nuclear Power Plant ML20057E7001993-09-30030 September 1993 Shutdown and LOW-POWER Operation at Nuclear Power Plants in the United States.Final Report ML20149D4111993-08-31031 August 1993 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,April-June 1993.(White Book) ML20057B2491993-08-31031 August 1993 Historical Data Summary of the Systematic Assessment of Licensee Performance ML20128N7781993-01-31031 January 1993 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1992.(White Book) ML20128N2891993-01-31031 January 1993 Operator Licensing Examiner Standards ML20126F0051992-12-31031 December 1992 Status of Safety Issues at Licensed Power Plants.Tmi Action Plan Requirements.Unresolved Safety Issues.Generic Safety Issues.Other Multiplant Action Issues ML20127H0941992-12-31031 December 1992 Improvements to Technical Specifications Surveillance Requirements 1999-09-30 Category:RAINBOW BOOKS MONTHYEARML20205A5291999-03-31031 March 1999
[Table view]Some use of "" in your query was not closed by a matching "".Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1998.(White Book) ML20205A5991999-03-31031 March 1999 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1998.(White Book) ML20155A9281998-10-31031 October 1998 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,April-June 1998.(White Book) ML20154C2081998-09-30030 September 1998 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,January-March 1998.(White Book) ML20247E3951998-04-30030 April 1998 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1997.(White Book) ML20202J3051997-11-30030 November 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1997.(White Book) ML20197B0431997-11-30030 November 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,April-June 1997.(White Book) ML20149G9431997-07-31031 July 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,January-March 1997.(White Book) ML20137A2191997-03-31031 March 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1996.(White Book) ML20138J2461997-01-31031 January 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1996.(White Book) ML20058N5831993-11-30030 November 1993 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1993.(White Book) ML20149D4111993-08-31031 August 1993 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,April-June 1993.(White Book) ML20128N7781993-01-31031 January 1993 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1992.(White Book) ML20126E0741992-11-30030 November 1992 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1992.(White Book) ML20058H4921990-11-30030 November 1990 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1990.(White Book) ML20058F9251990-10-31031 October 1990 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,April-June 1990.(White Book) ML20055C3581990-01-31031 January 1990 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1989.(White Book) ML20247N3031989-08-31031 August 1989 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,April-June 1989.(White Book) ML20246F2761989-04-30030 April 1989 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,January-March 1989.(White Book) ML20246D5251989-04-30030 April 1989 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1988.(White Book) ML20154D4081988-08-31031 August 1988 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,April-June 1988.(White Book) ML20195D7601988-05-31031 May 1988 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,January-March 1988.(White Book) ML20149L3221988-02-29029 February 1988 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1987.(White Book) ML20236K5621987-10-31031 October 1987 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1987.(White Book) ML20237L1151987-08-31031 August 1987 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,April-June 1987.(White Book) ML20214W6181987-05-31031 May 1987 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,January-March 1987.(White Book) ML20128F3041985-06-30030 June 1985 Unresolved Safety Issues Summary.Data as of May 17, 1985. (Aqua Book) 1999-03-31 Category:TEXT-SAFETY REPORT MONTHYEARML20216G0111999-09-30030 September 1999
[Table view]Some use of "" in your query was not closed by a matching "".Year 2000 Readiness in U.S. Nuclear Power Plants ML20206N2191999-04-30030 April 1999 Operator Licensing Examination Standards for Power Reactors ML20205A5291999-03-31031 March 1999 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1998.(White Book) ML20211K2851999-03-31031 March 1999 Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance ML20205A5991999-03-31031 March 1999 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1998.(White Book) ML17313A7791999-02-0505 February 1999 Safety Evaluation Accepting Licensee Rev to Emergency Plan That Would Result in Two Less Radiation Protection Positions Immediatelu Available During Emergencies ML20203D0541999-01-31031 January 1999 Fire Barrier Penetration Seals in Nuclear Power Plants ML20155A9281998-10-31031 October 1998 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,April-June 1998.(White Book) ML20154C2081998-09-30030 September 1998 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,January-March 1998.(White Book) ML15261A4681998-09-0404 September 1998 Safety Evaluation Supporting Amends 232,232 & 231 to Licenses DPR-38,DPR-47 & DPR-55,respectively ML20203A1521998-07-31031 July 1998 Assessment of the Use of Potassium Iodide (Ki) as a Public Protective Action During Severe Reactor Accidents.Draft Report for Comment ML20153D3371998-07-31031 July 1998 Assessment of the Use of Potassium Iodide (Ki) as a Public Protective Action During Severe Reactor Accidents.Draft Report for Comment ML20236S9771998-06-30030 June 1998 Knowledge and Abilities Catalog for Nuclear Power Plant Operators.Pressurized Water Reactors ML20236S9681998-06-30030 June 1998 Evaluation of AP600 Containment THERMAL-HYDRAULIC Performance ML20236S9591998-06-30030 June 1998 Knowledge and Abilities Catalog for Nuclear Power Plant Operators.Boiling Water Reactors ML20217Q7971998-05-0404 May 1998 Safety Evaluation Supporting Amends 227 & 201 to Licenses DPR-53 & DPR-69,respectively ML20247E3951998-04-30030 April 1998 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1997.(White Book) ML20217F3801998-03-31031 March 1998 Risk Assessment of Severe ACCIDENT-INDUCED Steam Generator Tube Rupture ML20202J3051997-11-30030 November 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1997.(White Book) ML20197B0431997-11-30030 November 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,April-June 1997.(White Book) ML20211L2931997-09-30030 September 1997 Aging Management of Nuclear Power Plant Containments for License Renewal ML20210K7801997-08-31031 August 1997 Topical Report Review Status ML20149G9431997-07-31031 July 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,January-March 1997.(White Book) ML20140J4301997-05-31031 May 1997 Safety Evaluation Report Related to the Department of Energy'S Proposal for the Irradiation of Lead Test Assemblies Containing TRITIUM-PRODUCING Burnable Absorber Rods in Commercial LIGHT-WATER Reactors ML20210R2131997-05-31031 May 1997 Final Safety Evaluation Report Related to the Certification of the System 80+ Design.Docket No. 52-002.(Asea Brown Boveri-Combustion Engineering) ML20140F0801997-05-31031 May 1997 Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design.Supplement No. 1.Docket No. 52-001.(General Electric Nuclear Energy) ML20141J9391997-04-30030 April 1997 Safety Evaluation Report Related to the Renewal of the Operating License for the Research Reactor at North Carolina State University ML20141C2411997-04-30030 April 1997 Circumferential Cracking of Steam Generator Tubes ML20141A5791997-04-30030 April 1997 Proposed Regulatory Guidance Related to Implementation of 10 CFR 50.59 (Changes, Tests, or Experiments).Draft Report for Comment ML20137A2191997-03-31031 March 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,October-December 1996.(White Book) ML20135D5711997-01-31031 January 1997 Operator Licensing Examination Standards for Power Reactors ML20134L3631997-01-31031 January 1997 Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance.Draft Report for Comment ML20134L3601997-01-31031 January 1997 Standard Review Plan on Antitrust.Draft Report for Comment ML20138J2461997-01-31031 January 1997 Licensee Contractor and Vendor Inspection Status Report. Quarterly Report,July-September 1996.(White Book) ML20133E9161996-12-31031 December 1996 License Renewal Demonstration Program: NRC Observations and Lessons Learned ML20149L8261996-10-31031 October 1996 Reactor Pressure Vessel Status Report ML20135A4981996-10-31031 October 1996 Historical Data Summary of the Systematic Assessment of Licensee Performance ML20128P4381996-10-0909 October 1996 Safety Evaluation Accepting Review of Cracked Weld Operability Calculations & Staff Response to NRC Task Interference Agreement ML20107F5611996-04-17017 April 1996 Safety Evaluation Providing Guidance on Submitting plant- Specific Info W/Respect to IST Program Alternatives Request ML14183A6951995-09-18018 September 1995 Safety Evaluation Approving Relocation of Technical Support Ctr ML20236L5971994-12-29029 December 1994 SER in Response to 940314 TIA 94-012 Requesting NRR Staff to Determine Specific Mod to Keowee Emergency Power Supply Logic Must Be Reviewed by Staff Prior to Implementation of Mod ML20128Q0761994-11-0404 November 1994 Coordinating Group Evaluation,Conclusions & Recommendations ML20149H0671994-11-0404 November 1994 Safety Evaluation Supporting Amend 27 to Amended License R-103 ML20149G4281994-09-28028 September 1994 NRC Perspectives on Accident Mgt, Presented at 940928 Severe Accident Mgt Implementation Workshop in Alexandria, VA ML20149F7581994-08-25025 August 1994 Topical Rept Evaluation of WCAP-13864,Rev 1, Rod Control Sys Evaluation Program ML20149F4151994-08-0404 August 1994 Safety Evaluation Concluding That Unit 1 Can Be Safely Operated During Next Operating Cycle (Cycle 14) ML20149E8831994-08-0202 August 1994 Safety Evaluation Accepting Interim Relief Request IRR-03 Re Drywell Isolation Check Valves in Equipment Drain Lines & Reactor Equipment Closed Cooling Water Sys ML20248C5731994-07-19019 July 1994 SER Step 1 Review of Individual Plant Exam of External Fire Events for Millstone Unit 3 ML20059J4591994-01-25025 January 1994 Safety Evaluation Supporting Request for Relief from ASME Code Re Inservice Testing Requirements to Measure Vibration Amplitude Displacement ML20059H4991994-01-24024 January 1994 Safety Evaluation Accepting Revised Responses to IEB-80-04 Re MSLB Reanalysis 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20138J246&oldid=2866426"