ML20141C032
| ML20141C032 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 04/02/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Leddick R LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20141C036 | List: |
| References | |
| NUDOCS 8604070169 | |
| Download: ML20141C032 (2) | |
See also: IR 05000382/1986005
Text
..
9
. ,
APR 0 21986
In Reply Refer To:
Docket: 50-382/86-05
Louisiana Power & Light Company
ATTN: R. S. Leddick, Sr. Vice President
Nuclear Operations
142 Delaronde Street
New Orleans, Louisiana 70174
Gentlemen:
This refers to the inspection conducted by Mr. J. G. Luehman of this office ,
during the period February 1-28, 1986, of activities authorized by NRC
Operating License NPF-38 for Waterford Steam Electric Station, Unit 3, and to
the discussions of our findings with Mr. R. P. Barkhurst and other members of
your staff at the conclusion of the inspection.
Areas examined during the inspection included plant status, routine inspection,
monthly maintenance, monthly surveillance, Licensee Event Report (LER) followup,
followup of previous inspection findings, followup of previously identified
items, allegation followup, and Inspection and Enforcement Circulars and Bulletins.
Within these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations by the
inspector. These findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter; and should include the total radiological
impact of the two inadvertent releases as well as why plant instrumentation and
control personnel.were allowed to conduct testing a second time without further
guidance or procedures.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Action of 1980, PL 96-511.
-
'
'
t
l
v,oi.w
J sus A g
,,,,,,/
} l
i
!
n k .~r
RI .RRI B/J RP / D:' &'S
ACN,l RPB
p eh n/ry Bufi nstable RB gart MEmerson JGagliardo
1 86 /86 5 //9 /86 86 S /6/86 3/3//86
i
!
j
B604070169 86040232
DR ADOCK O
( $60
o .
Louisiana Power & Light Company -2-
'Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Gag!n-! Signed By
J. E. Gagliardo
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1. Appendix A - Notice of Violation
2. Appendix B - NRC Inspection Report
50-382/86-05
cc w/ enclosures:
Louisiana Power &_ Light Company Louisiana Power & Light Company
ATTN: G. E. Wuller, Onsite ATTN: R. P. Barkhurst, Plant Manager
Licensing Coordinator P. O. Box B
P. O. Box B Killona, Louisiana 70066
Killona, Louisiana 70066
Middle South Services Louisiana Power & Light Company
ATTN: Mr. R. T. Lally ATTN: K. W. Cook, Nuclear Support
P. O. Box 6100 and Licensing Manager
New Orleans, Louisiana 70161 142 Delaronde Street
New Orleans, Louisiana 70174
Louisiana Radiation Control Program Director
-bec to DMB (IE01)
bcc distrib. by RIV
- RPB D. Powers, E0
- Resident Inspector R. D. Martin, RA
- Section Chief (RPB/C) DRSP
- EP&RPB *RIV File
- MIS System D. Crutchfield, NRR
- RSTS Operator RSB
MEmerson
- 766
i
(