Review of Combustion Engr Topical Rept#CENPD-169-P COLSS- Assessment of the Accuracy of PWR Oper Limits as Determined by the Core Oper Limit Supervisory Sys. Finds Rept Is Acceptable Reference for Methodology
ML20147E363
Person / Time
Issue date: 12/13/1978
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20147E348 List:
References
NUDOCS 7812210051
Download: ML20147E363 (4)


Text

-

.. . OEC 131973 REVIEW 0F TOPICAL REPORT CENPD-169-P Report

Title:

Assessment of the Accuracy of PWR Operating Limits as Determined by the Core Operating Limit Supervisory System (COLSS)

Report Number: CENPD-169-P (Proprietary)

Report Date: July 1975 Originating Organization: Combustion Engineering, Inc.

l Reviewed by: Core Performance Branch, DSS Summary of Topical Report The primary objective of CENPD-169-P is to present the methodology fnr ascertaining the uncertainty in the core power distribution determined by the Core Operating Limit Supervisory System (COLSS) synthesis pro-cedure. In addition, the report serves as a reference for the basic concepts employed to transform the signals from five-level incore detectors into forty-node representations of the radially averaged core axial power shape (CAPS). Also included is a description of the construction of the hot pin and hot channel power distributions using precalculated planar Radial Peaking Factors (RPF) and the CAPS.

The subject report should only be used as a generic reference for the synthesis and uncertrinty methodology, since implementation of the methodology and the precise values of the uncertainty factors are plant specific.

Summary of Regulatory Evaluation The following sections are intended to clarify the essential points pertiment

, to the evaluation of the CENPD-169-P methodology.

"I812210 @

_2 OEC 131978 Applicability of the Report The COLSS methodology described in the report will generically encompass CE plants of the Arkansas Nuclear One-Unit 2 and future designs. However, the precise value of the appropriate uncertainty factors depend on basic-ally three design parameters: the number and burnup of the fuel assemblies the Control Element Assembly '(CEA) programming, and the number of operable -

incore detectors. Thus the Linear Power Density (LPD) uncertainty will depend on the plant design.

Core Power Distribution The core axial power shape (CAP) is calculated from the integral responses of 5 levels of incore detector segments. A simple 5 element Fourier fit to the power distribution is employed. Sets of integral detector signal equations are solved for the combining coefficients and the core axial power distribution is constructed for 40 axial nodes. For each reactor empicying a COLSS, these coefficients are calculated with a reactor simulator model and are experimentally verified during startup testing.

The detailed radial power distribution is not measured in COLSS. Radial peaking factors calculated with a reactor simulator model (the simulator l model is a three dimensional nodal core physics model for the calculation l

of the core power distribution) are employed to construct the hot pin and hot channel power distribution. The radial peaking factors are functions

' of CEA configuration and are stored in the COLSS computer. Tests will be

. , DEC 13 'D performed during the reactor start-up program to verify that the pre-calculated values of radial peaking factors are appropriate for the as-built reactor. Updating of COLSS power distribution constants will be based on the results of the measurement of core power distributions by the INCA (ref. 1) program.

Uncertainty Analysis _

The technique described for determining the uncertainty in the COLSS calculated Fg combines the CAPS synthesis error with the INCA (ref.1) verified planar RPF uncertainty. To determine the CAPS uncertainty, the Fg 's for more than 4000 core configurations, including steady-state, transients, and non-normal CEA configurations, calculated by the reactor simulator and the COLSS procedures were compared. In these computations, the COLSS procedures employed the planar RPFs obtained from the simulator for each core configuration.

Thus, the differences in Fg reflect only CAPS synthesis errors. The uncertainty in the RPF's attributable to the accuracy of the INCA (refs. I and 2) system used to verify the RPF's is combined with the CAPS uncertainty to yield the total uncertainty value.

The increase in the uncertainty in the COLSS synthesized Fg as a function of inoperable incore detectors was evaluated. The calculations show that the error is small, even with a large number of inoperable detectors. This is because the axial distribution is obtained from the average of all operable detectors at a given axial level and therefore even a large number of inoperable detectors does not greatly affect the average values.

Orc 1 a 570 Regulatory Position Based on our review of the areas described above, we conclude that the subject report is an acceptable reference for the general methodology of COLSS to determine core power distributions from incore detectors.

In addition, the procedure described for calculating the overall uncertainty in Fg including uncertainties in the COLSS synthesis pro- _

cedure is satisfactory. The values for uncertainties used in references 1 and 2 are intentionally excluded from this review, since review of those documents has not been completed.

REFERENCES

1. CENPD-145 INCA - Method cf Analyzing In-Core Detector Data, April 1975,
2. CENPD-153 Evaluation of Uncertainty in Fg Measured by Self-Powered Fixed In-Core Detector Systems, August 1974.