MONTHYEARML20217K8901999-10-18018 October 1999 TS Change Request NPF-38-224 for License NPF-38,modifying TS 3.6.2.2 LCO to Allow Plant to Operate with Two Independent Trains of Containment Cooling,Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20210M9761999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One HPSI Train Inoperable & TS 3.5.3 to Change end-state to Hot Shutdown with at Least One Operable Shutdown in Operation ML20210M9601999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One LPSI Train Inoperable & Allowed Outage Time of 72 Hours Imposed for Other Conditions ML20210H1401999-07-29029 July 1999 TS Change Request NPF-38-220 to License NPF-38,modifying TS 3.8.1.1 & Associated Bases by Extending EDG Allowed AOT from 72 H to Ten Days ML20210H2091999-07-29029 July 1999 TS Change Request NPF-38-221 to License NPF-38,modifying TS 3.6.2.1 to Extend Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3181999-07-19019 July 1999 TS Change Request NPF-38-219 for License NPF-38,modifying TS 4.5.2.f.2 by Increasing Performance Requirement for LPSI Pumps ML20210D0831999-07-15015 July 1999 TS Change Request NPF-38-216 to License NPF-38,adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20210D0341999-07-15015 July 1999 TS Change Request NPF-38-217 to License NPF-38,creating New TS for Feedwater Isolation Valves to Ts.Unreviewed Safety Question Re Crediting of Rt Override Feature & AFW Pump High Discharge Pressure Trip,Provided ML20209H3051999-07-15015 July 1999 Application for Amend to License NPF-38 to Modify TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 Efpy.Proprietary Rept 51-1234900-00 Encl.Proprietary Encl Withheld,Per 10CFR2.790 ML20195B1771999-05-20020 May 1999 Application for Amend to License NPF-38 to Change TS Bases B 3/4.3.1 & 3/4.3.2,B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20198G2311998-12-23023 December 1998 Application for Amend to License NPF-38,modifying LCO for TS 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20154E1011998-10-0101 October 1998 Tech Spec Change Request NPF-38-211 to License NPF-38, Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20153D5571998-09-23023 September 1998 Emergency TS Change Request NPF-38-210 to License NPF-38, Addressing Functional Requirements of 10-4% Bistable of Rps. TS Change Request NPF-38-21 Replaces 980918 Request Entirely ML20153B4381998-09-18018 September 1998 Emergency Application for Amend to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints & Table 3.3-1 Re Reactor Protective Instrumentation.Application Supersedes 980911 Submittal ML20151W5791998-09-11011 September 1998 TS Change Request NPF-38-210 to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7901998-08-12012 August 1998 Application for Amend to License NPF-38,increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7281998-07-29029 July 1998 Application for Amend to License NPF-38 to Revise TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model.Request Associated W/Methodology Used to Obtain SBLOCA Results ML20249C7861998-06-29029 June 1998 TS Change Request NPF-38-205 to License NPF-38,modifying TS 3.3.3.7.1, Chlorine Detection Sys & TS 3.3.3.7.3, Broad Range Gas Detection & Associated Bases ML20249C8301998-06-29029 June 1998 Application for Amend to License NPF-38,revising Control Room Ventilation TS to Be More Consistent w/NUREG-1432 ML20248B7441998-05-28028 May 1998 Application for Amend to License NPF-38 to Change TS 3.7.1.2,surveillance Requirement 4.7.1.2 & Bases Change for Emergency Feedwater Sys ML20217D4921998-03-25025 March 1998 Rev 1 to 960718 TS Change Request NPF-38-177 to License NPF-38,correcting Discrepancy in Original Submittal & Incorporating Addl Changes to Improve Clarity of TS 3.9.8.1 & TS 3.9.8.2 ML20199A1031997-11-13013 November 1997 TS Change Request NPF-38-202 to License NPF-38,modifying TS 6.8.4.a, Primary Coolant Sources Outside Containment, to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217G2351997-10-0707 October 1997 Application for Amend to License NPF-38,modifying TS 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8091997-09-25025 September 1997 Application for Amend to License NPF-38,modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G6951997-07-0707 July 1997 Application for Amend to License NPF-38,supplementing TS Change Request NPF-38-179 by Modifying Value Previously Submitted to Prevent Vortexing & Value for Short Term Requirements of CCW Makeup Sys & Expand Applicability of TS ML20141D8471997-06-26026 June 1997 Application for Amend to License NPF-38,revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases ML20148G6221997-06-0303 June 1997 Suppl to 960717 TS Change Request NPF-38-179,providing Updated Info Based on Min Required Level in Condensate Storage Pool.Attachment a Contains Original Vortexing Calculation & Attachment B Contains Revised Calculation ML20140B1591997-06-0303 June 1997 Application for Amend to License NPF-38,consisting of TS Change Request NPF-38-108,revising Action Requirements for TS 3/4.3.2 for Safety Injection Sys Sump RAS ML20141K1911997-05-24024 May 1997 TS Change Request NPF-38-197 to License NPF-38,modifying TS 3/4.7.4 Re Ultimate Heat Sink,Table 3.7-3 by Incorporating More Restrictive Dry Cooling Tower Fan Requirements & Changes Wet Cooling Tower Water Consumption in TS Bases ML20141K1611997-05-24024 May 1997 TS Change Request NPF-38-196 to License NPF-38,modifying Specifications 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1-1 by Removing Cycle Dependent Boron Concentration & Boration Flow Rate from Action Statements ML20137T4251997-04-11011 April 1997 Application for Amend to License NPF-38,deleting TS 3.7.1.3, Action (B) & Associated Surveillance Requirement ML20137T4451997-04-11011 April 1997 Application for Amend to License NPF-38,making TS 3.6.2.2 & Surveillance Requirement 4.6.2.2 Consistent W/Containment Cooling Assumptions in Waterford 3 Containment Analysis ML20137T3971997-04-11011 April 1997 Application for Amend to License NPF-38-195,modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20137P2561997-04-0707 April 1997 Application for Amend to License NPF-38,deleting TS 4.8.1.1.2a.7 & Incorporating 184 Day Fast Start Test Requirement as 4.8.1.1.2d,renumber Subsequent Requirements & Adding Footnote as Indicated ML20137G4711997-03-27027 March 1997 TS Change Request NPF-38-192 to License NPF-38,modifing TS 3/4.5.2, ECCS Subsystems Modes 1,2 & 3 ML20137F9201997-03-27027 March 1997 TS Change Request NPF-38-191 to License NPF-38,modifying TS Surveillance Requirements 4.5.2.d.3 & 4.5.2.d.4 Re Granular Trisodium Phosphate Dodecahydrate ML20137G2021997-03-27027 March 1997 Application for Amend to License NPF-38,increasing SFP Storage Capacity & Increasing Maximum Fuel Enrichment from 4.9 W/O to 5.0 W/O U-235.Proprietary & Nonproprietary Repts HI-971628 Encl.Proprietary Rept Withheld ML20134F7091997-02-0505 February 1997 Application for Amend to License NPF-38,requesting to Increase Minimum Boron Concentration in Safety Injection Tanks & Refueling Water Storage Pool to 2050 Ppm ML20135A7661996-12-0202 December 1996 Application for Amend to License NPF-38,permitting Use of 10CFR50,App J,Option B Re performance-based Containment Leakage Testing for Type A,B & C Leak Rate Testing ML20134L6771996-11-18018 November 1996 Application for Amend to License NPF-38,requesting Rev to Change Testing Requirement for Shutdown Cooling Sys Suction Line Relief Valves to Test in Accordance W/Ts 4.0.5 ML20134L1901996-11-15015 November 1996 Application for Amend to License NPF-38,requesting Revision to Scope of Limiting Condition for Operation 3.6.3 Re Containment Isolation ML20128Q1661996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 185,expanding Applicability for CPC Operability & Allowing for Application of Cycle Independent Shape Annealing Matrix ML20128Q2221996-10-16016 October 1996 Application for Amend to License NPF-38,requesting That Change Request 182,permit Use of 10CFR50,App J,Option B, Performance-Based Containment Leakage Testing ML20128Q1871996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 183,extending Allowable Time for Core Operating Limit Supervisory Sys OOS by Monitoring for Adverse Trends ML20128Q2091996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 186,relocating Certain Adminstrative Controls to QA Program Manual & Changing Shift Coverage from 8 H day,40 H Wks to Option of 8 or 12 H Days & Nominal 40 H Wks ML20116B0461996-07-25025 July 1996 Application for Amend to License NPF-38,modifying TS 3/4.7.4 Ultimate Heat Sink by Incorporating More Restrictive Fan Operability Requirements & Lower Basin Temp ML20115G5071996-07-18018 July 1996 Application for Amend to License NPF-38,revising TS 3.9.8.1, Shutdown Cooling & Coolant Circulation High Water Level & TS 3.9.8.2, Shutdown Coolant Circulation Low Water Level ML20116D0071996-07-17017 July 1996 Application for Amend to License NPF-38,consisting of Change Request 174,extending Surveillance Interval for Rtbs from Monthly to Quarterly & Increasing AOT for Operation W/Inoperable Rtb from One H to Two H ML20115G2811996-07-17017 July 1996 Application for Amend to License NPF-38,reflecting That Name La Power & Light Co Has Been Changed to Entergy Louisiana,Inc ML20115G4901996-07-17017 July 1996 Application for Amend to License NPF-38,modifying Spec 3/4.7.1.3 Condensate Storage Pool by Increasing Minimum Required Contained Water Vol from 82% to 91% Indicated Level 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217K8901999-10-18018 October 1999 TS Change Request NPF-38-224 for License NPF-38,modifying TS 3.6.2.2 LCO to Allow Plant to Operate with Two Independent Trains of Containment Cooling,Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20210M9761999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One HPSI Train Inoperable & TS 3.5.3 to Change end-state to Hot Shutdown with at Least One Operable Shutdown in Operation ML20210M9601999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One LPSI Train Inoperable & Allowed Outage Time of 72 Hours Imposed for Other Conditions ML20210H1401999-07-29029 July 1999 TS Change Request NPF-38-220 to License NPF-38,modifying TS 3.8.1.1 & Associated Bases by Extending EDG Allowed AOT from 72 H to Ten Days ML20210H2091999-07-29029 July 1999 TS Change Request NPF-38-221 to License NPF-38,modifying TS 3.6.2.1 to Extend Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3181999-07-19019 July 1999 TS Change Request NPF-38-219 for License NPF-38,modifying TS 4.5.2.f.2 by Increasing Performance Requirement for LPSI Pumps ML20210D0831999-07-15015 July 1999 TS Change Request NPF-38-216 to License NPF-38,adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20210D0341999-07-15015 July 1999 TS Change Request NPF-38-217 to License NPF-38,creating New TS for Feedwater Isolation Valves to Ts.Unreviewed Safety Question Re Crediting of Rt Override Feature & AFW Pump High Discharge Pressure Trip,Provided ML20209H3051999-07-15015 July 1999 Application for Amend to License NPF-38 to Modify TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 Efpy.Proprietary Rept 51-1234900-00 Encl.Proprietary Encl Withheld,Per 10CFR2.790 ML20195B1771999-05-20020 May 1999 Application for Amend to License NPF-38 to Change TS Bases B 3/4.3.1 & 3/4.3.2,B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20198G2311998-12-23023 December 1998 Application for Amend to License NPF-38,modifying LCO for TS 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20154E1011998-10-0101 October 1998 Tech Spec Change Request NPF-38-211 to License NPF-38, Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20153D5571998-09-23023 September 1998 Emergency TS Change Request NPF-38-210 to License NPF-38, Addressing Functional Requirements of 10-4% Bistable of Rps. TS Change Request NPF-38-21 Replaces 980918 Request Entirely ML20153B4381998-09-18018 September 1998 Emergency Application for Amend to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints & Table 3.3-1 Re Reactor Protective Instrumentation.Application Supersedes 980911 Submittal ML20151W5791998-09-11011 September 1998 TS Change Request NPF-38-210 to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7901998-08-12012 August 1998 Application for Amend to License NPF-38,increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7281998-07-29029 July 1998 Application for Amend to License NPF-38 to Revise TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model.Request Associated W/Methodology Used to Obtain SBLOCA Results ML20249C8301998-06-29029 June 1998 Application for Amend to License NPF-38,revising Control Room Ventilation TS to Be More Consistent w/NUREG-1432 ML20249C7861998-06-29029 June 1998 TS Change Request NPF-38-205 to License NPF-38,modifying TS 3.3.3.7.1, Chlorine Detection Sys & TS 3.3.3.7.3, Broad Range Gas Detection & Associated Bases ML20248B7441998-05-28028 May 1998 Application for Amend to License NPF-38 to Change TS 3.7.1.2,surveillance Requirement 4.7.1.2 & Bases Change for Emergency Feedwater Sys ML20217D4921998-03-25025 March 1998 Rev 1 to 960718 TS Change Request NPF-38-177 to License NPF-38,correcting Discrepancy in Original Submittal & Incorporating Addl Changes to Improve Clarity of TS 3.9.8.1 & TS 3.9.8.2 ML20199A1031997-11-13013 November 1997 TS Change Request NPF-38-202 to License NPF-38,modifying TS 6.8.4.a, Primary Coolant Sources Outside Containment, to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217G2351997-10-0707 October 1997 Application for Amend to License NPF-38,modifying TS 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8091997-09-25025 September 1997 Application for Amend to License NPF-38,modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G6951997-07-0707 July 1997 Application for Amend to License NPF-38,supplementing TS Change Request NPF-38-179 by Modifying Value Previously Submitted to Prevent Vortexing & Value for Short Term Requirements of CCW Makeup Sys & Expand Applicability of TS ML20141D8471997-06-26026 June 1997 Application for Amend to License NPF-38,revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases ML20148G6221997-06-0303 June 1997 Suppl to 960717 TS Change Request NPF-38-179,providing Updated Info Based on Min Required Level in Condensate Storage Pool.Attachment a Contains Original Vortexing Calculation & Attachment B Contains Revised Calculation ML20140B1591997-06-0303 June 1997 Application for Amend to License NPF-38,consisting of TS Change Request NPF-38-108,revising Action Requirements for TS 3/4.3.2 for Safety Injection Sys Sump RAS ML20141K1911997-05-24024 May 1997 TS Change Request NPF-38-197 to License NPF-38,modifying TS 3/4.7.4 Re Ultimate Heat Sink,Table 3.7-3 by Incorporating More Restrictive Dry Cooling Tower Fan Requirements & Changes Wet Cooling Tower Water Consumption in TS Bases ML20141K1611997-05-24024 May 1997 TS Change Request NPF-38-196 to License NPF-38,modifying Specifications 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1-1 by Removing Cycle Dependent Boron Concentration & Boration Flow Rate from Action Statements ML20137T4251997-04-11011 April 1997 Application for Amend to License NPF-38,deleting TS 3.7.1.3, Action (B) & Associated Surveillance Requirement ML20137T3971997-04-11011 April 1997 Application for Amend to License NPF-38-195,modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20137T4451997-04-11011 April 1997 Application for Amend to License NPF-38,making TS 3.6.2.2 & Surveillance Requirement 4.6.2.2 Consistent W/Containment Cooling Assumptions in Waterford 3 Containment Analysis ML20137P2561997-04-0707 April 1997 Application for Amend to License NPF-38,deleting TS 4.8.1.1.2a.7 & Incorporating 184 Day Fast Start Test Requirement as 4.8.1.1.2d,renumber Subsequent Requirements & Adding Footnote as Indicated ML20137G4711997-03-27027 March 1997 TS Change Request NPF-38-192 to License NPF-38,modifing TS 3/4.5.2, ECCS Subsystems Modes 1,2 & 3 ML20137F9201997-03-27027 March 1997 TS Change Request NPF-38-191 to License NPF-38,modifying TS Surveillance Requirements 4.5.2.d.3 & 4.5.2.d.4 Re Granular Trisodium Phosphate Dodecahydrate ML20137G2021997-03-27027 March 1997 Application for Amend to License NPF-38,increasing SFP Storage Capacity & Increasing Maximum Fuel Enrichment from 4.9 W/O to 5.0 W/O U-235.Proprietary & Nonproprietary Repts HI-971628 Encl.Proprietary Rept Withheld ML20134F7091997-02-0505 February 1997 Application for Amend to License NPF-38,requesting to Increase Minimum Boron Concentration in Safety Injection Tanks & Refueling Water Storage Pool to 2050 Ppm ML20135A7661996-12-0202 December 1996 Application for Amend to License NPF-38,permitting Use of 10CFR50,App J,Option B Re performance-based Containment Leakage Testing for Type A,B & C Leak Rate Testing ML20134L6771996-11-18018 November 1996 Application for Amend to License NPF-38,requesting Rev to Change Testing Requirement for Shutdown Cooling Sys Suction Line Relief Valves to Test in Accordance W/Ts 4.0.5 ML20134L1901996-11-15015 November 1996 Application for Amend to License NPF-38,requesting Revision to Scope of Limiting Condition for Operation 3.6.3 Re Containment Isolation ML20128Q2091996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 186,relocating Certain Adminstrative Controls to QA Program Manual & Changing Shift Coverage from 8 H day,40 H Wks to Option of 8 or 12 H Days & Nominal 40 H Wks ML20128Q2221996-10-16016 October 1996 Application for Amend to License NPF-38,requesting That Change Request 182,permit Use of 10CFR50,App J,Option B, Performance-Based Containment Leakage Testing ML20128Q1871996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 183,extending Allowable Time for Core Operating Limit Supervisory Sys OOS by Monitoring for Adverse Trends ML20128Q1661996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 185,expanding Applicability for CPC Operability & Allowing for Application of Cycle Independent Shape Annealing Matrix ML20116B0461996-07-25025 July 1996 Application for Amend to License NPF-38,modifying TS 3/4.7.4 Ultimate Heat Sink by Incorporating More Restrictive Fan Operability Requirements & Lower Basin Temp ML20115G5071996-07-18018 July 1996 Application for Amend to License NPF-38,revising TS 3.9.8.1, Shutdown Cooling & Coolant Circulation High Water Level & TS 3.9.8.2, Shutdown Coolant Circulation Low Water Level ML20116D0071996-07-17017 July 1996 Application for Amend to License NPF-38,consisting of Change Request 174,extending Surveillance Interval for Rtbs from Monthly to Quarterly & Increasing AOT for Operation W/Inoperable Rtb from One H to Two H ML20115G2811996-07-17017 July 1996 Application for Amend to License NPF-38,reflecting That Name La Power & Light Co Has Been Changed to Entergy Louisiana,Inc ML20115G4901996-07-17017 July 1996 Application for Amend to License NPF-38,modifying Spec 3/4.7.1.3 Condensate Storage Pool by Increasing Minimum Required Contained Water Vol from 82% to 91% Indicated Level 1999-08-04
[Table view] |
Text
._ .-_ . ~ , . . _ . _ _ _ . . - - _. . .
Entstgy Or erations,Inc.
W?
Killona LA i 3066 0751 Tel 504 739 t '60 Mike Sellrnan 1 W s cent. Operations W3F1-96-0214 A4.05 PR December 2,1996 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Technical Specification Change Request NPF-38-188 Gentlemen:
The purpose of this letter is to withdraw Technical Specification Change Request NPF-38-182, originally submitted under Waterford 3 letter number W3F1-96-0168, dated October 16,1996, and resubmit the Technical Specification Change Request.
Based on conversations with the NRC Staff, Waterford 3 recognizes that our original submittal was not in accordance with industry guidance published on this Technical Specification change. Accordingly, Waterford hereby withdraws the previously submitted Technical Specification Change Request in its entirety.
The attached description and safety analysis support a change to the Waterford 3 Technical Specifications. The purpose of this Technical Specification Change Request is to permit the use of 10CFR50 Appendix J, Option B, Performance-Based Containment Leakage Testing for Type A, B and C leak rate testing. Technical Specifications 3/4.6.1.1,3/4.6.1.2,3/4.6.1.3,4.6.1.6 and 4.6.1.7 are revised and section 6.15 is added establishing the Containment Leakage Rate Testing Program. hg The Bases are revised to reflect this change. Minor editorial changes are included in this submittal. Waterford commits to have a Containment Leakage Rate Testing Program in place prior to the next scheduled refueling outage. This program will be in 0) accordance with the guidelines contained in Regulatory Guide 1.163, ' Performance-Based Containment Leak-Test Program," dated September,1995.
9612040037 961202 PDR ADOCK 05000382 P PDR 040003 & "k% wm u
Technical Specification Change Request NPF-38-188 W3F1-96-0214 Page 2 December 2,1996 This proposed change has been evaluated in accordance with 10CFR50.91(a)(1),
using the criteria in 10CFR50.92(c), and it has been determined that this request involves no significant hazards consideration.
The circumstances surrounding this change do not meet the NRC's criteria for exigent or emergency review. However, due to the significant impact on our upcoming refueling outage, we request an expeditious review. The Waterford 3 refueling outage is currently scheduled to begin April 11,1997. Entergy Operations requests the effective date for this change be within 60 days of approval.
Waterford 3 currently has an exemption to delay performance of the Type A test until April 1997 or completion of Refueling Outage 8, whichever comes first. This exemption was granted by the NRC Staff by letter dated August 3,1995.
Should you have any questions or comments concerning this request, please contact Mr. James Fisicaro at (504) 739-6242.
Very truly yours v V 4 J< M.B. Sellman r
Vice President, Operations Waterford 3 MBS/ CWT /ssf
Attachment:
Affidavit NPF-38-188 cc: L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds NRC Resident inspectors Office Administrator Radiation Protection Division (State of Louisiana)
American Nuclear insurers
~
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION in the matter of )
)
Entergy Operations, Incorporated ) Docket No. 50-382 Waterford 3 Steam Electric Station )
AFFIDAVIT Charles Marshall Dugger, being duly sworn, hereby deposes and says that he is General Manager, Plant Operations - Waterford 3 of Entergy Operations, incorporated; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Technical Specification Change Request NPF-38-188; that he is familiar with -
the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
e q ,__ -
Charles Marshall Dugger 8' General Manager, Plant Operations - Waterford 3 ,
STATE OF LOUISIANA ) l
) ss PARISH OF ST. CHARLES )
Subscribed and sworn to before me, a Notary Public in and for the Parish and State above named this 2?' day of ~ D Pce m w c_ ,1996.
biens - e f Notary Public My Commission expires w,m u<t .
_. ._ _ . _ .___..._ _ _ _ . _ ~ _ . - _ _ _ _ . _ . - _ . . . . - - . . _ . _ - -
- .: .j j . .
f DESCRIPTION AND SAFETY ANALYSIS OF PROPOSED CHANGE NPF-38-188 The proposed change requests a change to the Technical Specifications for
- containment leakage to permit the use of 10CFR50 Appendix J, Option B,.
L Performance-Based Containment Leakage Testing. This incorporates Option B into l Type A, B, and C leak rate testing. Changes to the Bases are submitted to support this
- change and provide an editorial change. Specifically these changes include the
! following:
I 1. Addition of Section 6.15, " Containment Leakage Rate Testing Program" to l L the index.
j
. 2. Modified Surveillance 4.6.1.1.c to require Type B penetrations (except containment air locks) to be tested in accordance with the Containment Leakage Rate Testing Program if opened following a Type A or Type B test. 1
] .3. Modified Specification 3.6.1.2, it's ACTION and Surveillance 4.6.-l.2 to require containment leakage rates be in accordance with the Containment i: Leakage Rate Testing Program.
l .4. Modified Specification 3.6.1.3.b and Surveillance 4.6.1.3.b.2 to require containment air locks be demonstrated OPERABLE in accordance with the -
- Containment Leakage Rate Testing Program.
- 5. Modified Surveillance 4.6.1.6 to add the Containment Leakage Rate Testing
[ Program and delete special report no longer required under program.
g 6. Modified Surveillance 4.6.1.7.2 to require containment purge valves with resilient material seals to be tested in accordance with the Containment Leakage Rate Testing Program. Delete annotation referencing special
- requirements in effect prior to first refueling cycle.
- 7. Basis 3/4.6.1.2 is revised to reflect the Containment Leakage Rate Testing
- Program and change a specific procedure number to the Technical
! Requirements Manual, i 8. Add Section 6.15 " Containment Leakage Rate Testing Program" describing I the program to be instituted. :
i
! Existina Specification j See Attachment A
[ Proposed Specification See Attachment B i
l b
4 o
[ -
j i
Backaround l Appendix J to 10CFR50 requires that a Type A, integrated leakage rate, test of
- containment be performed periodically. These tests are required to be scheduled as a i set of three tests to be performed at approximately equal intervals during each ten year j service period with the third test to coincide with the shutdown for the ten year plant j inservice inspection. The Technical Specification essentially duplicates the requirements of Appendix J. The proposed change would allow the use of Appendix J, j Option B, which is the conducting of the containment leakage tests at an interval based on performance.
1 a
- j. Likewise, Type B Tests, local tests of penetrations, and Type C Tests, containment i isolation valve tests, are performed at specified intervals. This proposed change allows j conducting of these tests based on performance.
l The recent NRC conclusions on containment leak rate testing, as documented in
! NUREG-1493, " Performance-Based Containment Leakage-Test Program," are based
- on two fundamental components. First is the insight gained through probabilistic risk assessment techniques. This insight allows the NRC to better assess and apply the relative significance of systems important to safety. The second is the significant data
- base of practical experience regarding containment leakage rate testing gained since i 1973, when Appendix J became effective. This operating and testing experience -
i provides convincing evidence of the need for and activities necessary to conduct -
l Appendix J testing and the cost of those activities both in resources and occupational radiation exposure.
5 The new risk-based regulation is based on the performance history of the containment as a means to justify an increase in the interval for Type A tests. The new regulation requires tests to be conducted on an interval based on the performance of the containment structure without specifying the interval in the regulation.
As discussed in Waterford 3's Letter W3F1-93-0098, dated November 16,1993, Waterford 3 has a low leakage containment and that leakage has never exceeded 24.6% of L.. There are no mechanisms which would adversely affect the structural capability of the containment and that would be a factor in extending the Type A test schedule. A risk impact assessment was performed, and a determination was made ,
that there is no risk impact as a result of changing the Type A test schedula. j l
l Reducing the Type A test frequency from the current three tests every ten years to performance based frequency as documented in NUREG 1493 leads to no significant
- increase in risk. i i
i 2 ;
a e l
Furthermore, industry operating experience shows that leaks found by Type A tests l have performed in accordance with existing requirements. Given the insensitivity of risk to containment leakage rate and the small fraction of leakage paths detected solely by Type A testing, increasing the interval between Type A tests is possible with no
, significant impact on public risk.
-i in regard to Type B and C testing, NUREG 1493 has used a statistical approach to determine that the increased risk due to extending the interval was acceptable.
implementation of Technical Specification Chanaes The Containment Leakage Rate Testing Program, as required by Option B of 10 CFR
, 50 Appendix J, and as identified by Section 6.15 of the proposed Technical
- Specifications, will be effective prior to implementation of these amendments. The performance based leakage rate testing program will be developed consistent with Regulatory Guide 1.163, " Performance-Based Containment Leak-Test Program," dated September 1995.
Description The proposed changes would revise the Technical Specifications for Waterford 3.
Specifically, the change would permit the use of 10CFR50 Appendix J, Option B, !
Performance-Based Containment Leakage Rate Testing.
The Nuclear Regulatory Commission has amended its regulations to provide a performance based option for leakage rate testing of containments. This testing option
, is available in lieu of compliance with the prescriptive requirements contained in Appendix J. Therefore, Waterford 3 is proposing a change to the Technical Specifications to reference Option B to 10CFR50, Appendix J. This change will permit use of the performarce-based surveillance testing, Option B, of 10CFR50 Appendix J.
Surveillance 4.6.1.1.c has had the prescriptive requirements and frequency relocated to Section 6.15 and now requires Type B penetrations (except containment air locks) to be tested in accordance with the Containment Leakage Rate Testing Program if opened following a Type A or Type B test.
Specification 3.6.1.2, it's ACTION and Surveillance 4.6.1.2 have had the prescriptive requirements and frequency relocated to Section 6.15 and now requires containment leakage rate testing to be in accordance with the Containment Leakage Rate Testing Program. Note that, although this ACTION is not as written in the model Technical i Specifications, it is adequately restrictive as L.C.O. 3.0.3 would apply. L.C.O. 3.0.3 4
requires initiating action within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit in hot standby in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in hot shutdown in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in cold shutdown within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
n 4
i
[
Specification 3.6.1.3.b and Surveillance 4.6.1.3.b.2 have had the prescriptive requirements relocated to Section 6.15 and now require containment air locks be ,
- demonstrated OPERABLE in accordance with the Containment Leakage Rate Testing Program.-
l-
= Surveillance '4.6.1.6. has been modified to add the Containment Leakage Rate Testing i Program, as this inspection is performed in conjunction with the Type A test and deletes special reports which have been replaced with record keeping requirements per l 10CFR50 Appendix J. Reference to Specification 4.6.1.2 has been removed since it is
- j. referenced the Containment Leakage Rate Testing Program.
E Surveillance 4.6.1.7.2 has been modified to require containment purge valves with resilient material seals to be tested in accordance with the Containment Leakage Rate Testing Program rather than prescriptive requirements. Frequency has been changed to that in the model Technical Specifications. Delete the annotation referencing special requirements in effect prior to first refueling cycle.
Basis 3/4.6.1.2 is revised to reflect Reg Guide 1.163 rather than the ANSI Standard, and is revised to include the Containment Leakage Rate Testing Program. Where the Basis now specifies a specific procedure number, a change is being submitted to reference the " Technical Requirements Manual".
Section 6.15 " Containment Leakage Rate Testing Program" has been added describing the program to be instituted and has been added to the index. l
' Safety Analysis The proposed change described above shall be deemed to involve a significant hazards consideration if there is a positive finding in any of the following areas:
- 1. Will operation of the facility in accordance with this proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No i The proposed change will not affect the assumptions, design parameters, or results of any accident previously evaluated. The proposed change does not add or modify any existing equipment. The proposed changes will result in increased interv'als between containment leakage tests determined through a-performance based approach. ' The intervals between such tests are not related to conditions which cause accidents. The proposed changes do not involve a change to the plant design or operation. Therefore, this change does not involve a significant increase in the probability of any accident previously evaluated.
4
/ {
' NUREG-1493, " Performance-Based Containment Leak-Test Program,"
[
+
contributed to the technical bases for Option B of 10 CFR 50 Appendix J. !
NUREG-1493 contains a detailed evaluation of the expected leakage from ,
containment and the associated consequences. The increased risk due to i
j lengthening of the intervals between containment leakage tests was also '
evaluated and found acceptable. Using a statistical approach, NUREG-1493 !
determined the increase in the expected dose to the public from extending the ;
. testing frequency is extremely'small. It also concluded that a small increase is justifiable due to the benefits which accrue from the interval extension. The ;
primary benefit is in the reduction in occupational exposure. The reduction in the 3 occupational exposure is a real reduction, while the small increase to the public
- is statistically derived using conservative assumptions. Therefore, this change !
does ndt involve a significant increase in the consequences of any accident y previously evaluated.
i
. 2. Will operation of the facility in accordance with this proposed change j ' create the possibility of a new or different type of accident from any accident
[ previously evaluated?
Response: No.
The proposed change does not involve modifications to any existing equipment. 1 The proposed change will not affect the operation of the plant or the manner in !
which the plant is operated. The reduced testing frequency will not affect the -!
testing methodology. Therefore, the proposed change will not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. . Will operation of the facility in accordance with this proposed change .
involve a significant reduction in a margin of safety?-
Response: No- ;
The proposed change does not change the performance methodology of the containment leakage rate testing program. However, the proposed change does affect the frequency of containment leakage rate testing. With an increased frequency between tests, the proposed change does increase the probability that a increase in leakage could go undetected for a longer period of time.
Operational experience has demonstrated the leak tightness of the containment buildings has been significantly below the allowable leakage limit.
The margin of safety that has the potential of being impacted by the proposed change involves the offsite dose consequences of postulated accidents which
- are directly related to containment leakage rates. The limitation on containment 5
. - _ . _ . _ . .- . _. ___. . . _ . ~ . _ . _ _ . _ . . . . _ _ - - . _ _ . _ . . _ . _ _ _ .
o ,'
i leakage rate is designed to ensure the total leakage volume will not exceed the value assumed in our accident analysis. The margin of safety for the offsite dose consequences of postulated accidents directly related to containment leakage is ,
maintained by meeting the 1.0 L, acceptance criteria. The proposed change j maintains the 1.0 L, acceptance criteria. Therefore, the proposed change will l not involve a significant reduction in a margin of safety.
Safety and Significant Ha7ards Determination Based on the above safety analysis, it is concluded that: (1) the proposed change does not constitute a significant hazards consideration as defined by 10CFR50.g2; and (2) there is a reasonable assurance that the health and safety of the public will not be endangered by the proposed change; and (3) this action will not result in a condition ,
which significantly alters the impact of the station on the environment as described in >!
the NRC final environmental statement. j l
l l t i i: 6
J
. =
- l 1
l e
O 4 I
l l
NPF-38-188 ATTACHMENT A
.