Final Deficiency Rept Re Threaded Studs W/Insufficient Threaded Engagement Into Embedded Strip Plates.Initially Reported on 811013.All Deficient Plates Marked W/Stickers. Site Work Procedures Revised
ML20072Q775
Person / Time
Site: Harris  
Issue date: 03/29/1983
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CON-NRC-49 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8304050317
Download: ML20072Q775 (4)


Text

.

-f' Cp&L -

Carolina Power & Light ce .spany h , .

P. O. Box 101, New Hill,-N. C. 27562 #

March 29, 1983 9@k (d

1

$. 9. gv

.- .e Mr. James P. O'Reilly NRC-49 Pp .

United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 3100)

Atlanta, Georgia- 30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 THREADED STUDS WITH~ INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES, ITEM 63

Dear Mr. O'Reilly:

Attached is the final 10CFR50.55(e) report on the subject deficiency which describes the problem and the corrective action taken to accomplish resolu-tion. With this report, Carolina Power and Light Company considers this matter closed.

If you have any questions regarding this matter, please do not hesitate to contact me.

Yours very truly, g W : =& ,,

R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh Attachment cc: Mr. G. Maxwell (NRC-SHNPP)

.Mr. V. Stello (NRC)

A i -$N sho4osoa d 85o329 T

$$ $ku_ ^ C

N a

i CAROLINA POWER & LIGHT COMPANY-SHEARON HARRIS NUCLEAR POWER PLANT f

i UNITS NO. 1 AND 2 FINAL REPORT March 29, 1983 ITEM 63' s

THREADED STUDS WITH INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES.

. Reportable Under 10CFR50.55(e) J 4

2

'I s

+ , ' '

p 4

g +. - ,-.m-y +.a & e g y g ye

.~ . . . _ -. . . _ . _

J f; ^-1-.

SUBJECT:

Shearon Harris Nuclear Power Plant / Units No. l' ,

and 2 10CFR50.55(e),. reportable deficiency.- l

_ Thread, engagement of threaded studs into embedded

. strip. plates.

ITEM: Improperly installdd threaded studs.on embedded i strip plates. These tapped strip plates and

-I threaded studs have been used'in many cases in. ,

lieu of strip plates with welded-on Nelson headed 4

studs.

" SUPPLIED BY:- Not a supplier-related. deficiency. The studs and strip plates.were assembled'in the field.

-NATURE OF: DEFICIENCY: The deficiency involves SeismicfCategory I embedded; strip plates with' screwed-in studs that have.

insufficient thread engagement.- - These screwed-in studs are used in' lieu of welded-on Nelson headed I studs.-'The d.eficie'nt! plates / studs were found after concrete placements and acceptance of the I- placements.

DATE PROBLEM WAS

- CONFIRMED TO EXIST
October 13, 1981.

I e

DATE PROBLEM-REPORTED: . October.13, 1981, Mr. N. J. Chiangi. notified the

~

. NRC, Region II (Mr. R.. Butcher),.that the item -

l was potentially reportable. -November 10, 1981, ~

I Mr. N. J. Chiangi--. notifie'd the NRCi Region II . ,

} (Mr..-R. Butcher), that this item was' reportable per the provision of 10CFR50.55(e).- ~

SCOPE OF PROBLEM:~ Approximately 1300 of the strip plates to be used r

with screwed-in studs have.been ordered.-zTo'date, '

- all inspection has been completed in-the contain -

~

ment, fuel handling, reactor auxiliarys reactor

. auxiliary-common,Mdiesel' generator, diesel fuel

^

[=

oil storage. tank, tank l'and-2l buildings,< intake' and screening ~ structures. .A-large' number.of1 plates that have threaded studs'with improper

~

~

thread engagement;have.been found. :Also, hangers

~ .

~

have been foundEwelded'to plates that hav.ejthreaded:

[. .

studsnwith imprope.r thre63: engagement. .

j' SAFETY-IMPLICATION: . -Pipei' cable tray, and HVAC. hangers,.as;well'asi

? . other miscellaneous items, attach to these plates., .

it = Plates lwith studs not'having properf thread engage-

+ -

ment will possibly;beloverstressedtin normal
i. operation or during afseismic: event.- -

h ~ REASON DEFICIENCY v cIS REPORTABLE: EReportable-due to.the magnitudeLofLthe problemt ' *

[- -

,plus.the extensive' evaluation and/orirework required.1 J. .

^

pt >

^h

,, 'T # L y 6

" E p' xy ilb ,

..., ~ . . - - . ._ E. . ,. ,, . - t f); , , ,

.\ '
  • CORRECTIVE ACTION: Appropriate site work procedures have been

' revised requiring notification ~of-site engi-neering personnel prior to attaching any item to an embedded plate with screwed-in studs.

In addition, all plates having insufficient thread engagement have been marked with stickers

  • identifying them. . Plates having attachments have been identified and all have been evaluated by the' engineer using test data provided to them on shear resistance.- 'All eight plates previously identified as requiring corrective action have been reworked or accepted "as is".by a permanent waiver (PW). ,To control attachments to these plates once-the plant becomes-operational, operations personnel have agreed to implement-inspection of the plates in their procedures prior to making any attachments.
  • Note on sticker reads:

CAUTION Anchor studs for this plate have reduced thread engagement. Evaluate plate load limits prior to making any attachments.

n i

b