|
---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] Category:QUICK LOOK
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20247N5421998-05-11011 May 1998 Technical Evaluation Rept on Pump & Valve Inservice Testing Program:Peach Bottom Atomic Power Station,Units 2 & 3 ML20094C7411995-08-0404 August 1995 Individual Plant Exam Insight Support Rept for NUREG-1150 Plants L-95-037, Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 51995-07-31031 July 1995 Evaluation of Peach Bottom Atomic Power Station Units 2 & 3 Odcm,Rev 5 ML20070N3361994-03-31031 March 1994 Release of Radionuclides and Chelating Agents from CEMENT- Solidified Decontamination LOW-LEVEL Radioactive Waste Collected from the Peach Bottom Atomic Power Station Unit 3 ML20057E5061993-09-30030 September 1993 Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the Melcor Code ML20058F9621993-08-31031 August 1993 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Limerick-1/2 & Peach Bottom-2/3, Technical Evaluation Rept ML20028H6071990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Main Report ML20066C2721990-12-31031 December 1990 Analysis of Core Damage Frequency: Peach Bottom,Unit 2 External Events ML20028H6051990-12-31031 December 1990 Evaluation of Severe Accident Risks: Peach Bottom,Unit 2. Appendices ML20065Q3081990-11-30030 November 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Peach Bottom Atomic Power Station Units 2 & 3 ML20247N6471989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events Appendices ML20247M6631989-08-31031 August 1989 Analysis of Core Damage Frequency: Peach Bottom, Unit 2, Internal Events ML20206B1581988-10-31031 October 1988 Technical Evaluation:Peco Topical Rept PECO-RMS-004 `Methods for Performing BWR Sys Transient Analysis,Peach Bottom Atomic Power Station,Units 2 & 3.' ML20245D7911988-09-30030 September 1988 Dcrdr Onsite Meeting Rept for Philadephia Electric Co Peach Bottom Atomic Power Stations,Unit 2 & 3 ML20245D6681988-09-14014 September 1988 Dcrdr Preimplementation Audit Rept for Philadelphia Electric Co Peach Bottom Station,Units 2 & 3 ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P5111987-07-31031 July 1987 Technical Evaluation Rept Fibwr & Tcppeco Computer Programs, Final Informal Rept ML20214U0401987-06-0909 June 1987 App D & Suppl a to App D, Evaluation of Licensee-Reported Revs to Offsite Dose Calculation Manual, Technical Evaluation Rept ML20234B6291987-05-31031 May 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Appendices.Draft for Comment ML20234B5941987-04-30030 April 1987 Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Peach Bottom,Unit 2.Main Report.Draft for Comment ML20214R3971987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification (All Other Safety-Related Components),' Peach Bottom 2 & 3, Informal Rept ML20206A2881987-02-28028 February 1987 Containment Venting Analysis for the Peach Bottom Atomic Power Station ML20212J9201986-10-31031 October 1986 Analysis of Core Damage Frequency from Internal Events:Peach Bottom Unit 2 ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20206G8211986-05-12012 May 1986 Preliminary Draft Containment Event Analysis for Postulated Severe Accidents at Peach Bottom Atomic Power Station, for Review.Related Documentation Encl ML20140C2491986-01-0202 January 1986 Request for Info:Evaluation of Exemption Requests from 10CFR50.48 & 10CFR50,App R,Peach Bottom Atomic Power Stations,Units 2 & 3 ML20151P4161985-12-17017 December 1985 Dcrdr Validation Walkthrough Audit Results for Peach Bottom Atomic Power Station,Units 2 & 3 ML20141F6271985-09-30030 September 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Peach Bottom Units 2 & 3 ML20128D8381985-05-15015 May 1985 Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20129A2411985-05-0101 May 1985 Addendum a to Technical Evaluation Rept,First-Interval Inservice Insp Program ML20126L1481985-03-31031 March 1985 Conformance to Reg Guide 1.97,Peach Bottom Atomic Power Station,Units 2 & 3 ML20115H1531985-03-22022 March 1985 Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3 ML20106A6791984-09-12012 September 1984 Masonry Wall Design,Peach Bottom Atomic Power Station Units 2 & 3, Technical Evaluation Rept ML20106A6831984-08-31031 August 1984 Evaluation of Applicability of Nonlinear Analysis Techniques to Reinforced Masonry Walls in Nuclear Power Plants ML20106C4031984-07-31031 July 1984 Draft Vol II, Radionuclide Release Under Specific LWR Accident Conditions,Bwr,Mark I Design ML20126E6541984-07-31031 July 1984 Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 ML20115D3441984-01-0404 January 1984 Data Collection & Evaluation of Proposed Spds,Peach Bottom Units 2 & 3 ML20076H3611983-08-31031 August 1983 Control of Heavy Loads (C-10),Philadelphia Electric Co, Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20080E3311983-08-18018 August 1983 Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulics & Mechanical Snubbers at Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20093J2831983-06-30030 June 1983 Technical Evaluation of Integrity of Peach Bottom,Units 2 & 3 Reactor Coolant Boundary Piping Sys ML20071N2041983-05-17017 May 1983 Control of Heavy Loads,Peach Bottom Atomic Power Station, Units 2 & 3, Draft Technical Evaluation Rept ML20072S3191983-03-11011 March 1983 Rev 1 to Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Peach Bottom Atomic Power Station, Units 2 & 3, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G8831982-11-24024 November 1982 ECCS Repts (F-47):TMI Action Plan Requirements,Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept ML20079L0551982-10-31031 October 1982 Containment Purging & Venting During Normal Operation of Peach Bottom Atomic Power Station,Units 2 & 3, Draft Technical Evaluation Rept ML20076C7731982-09-10010 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20071L3801982-08-26026 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept ML20058H6581982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company) ML20054M1531982-07-0101 July 1982 Adequacy of Station Electric Distribution Sys Voltages for Peach Bottom Atomic Power Station,Units 2 & 3, Technical Evaluation Rept 1998-05-11
[Table view] |
Text
.
1
,o ~; -
EVALUATION OF THE APPLICABILITY OF NONLINEAR ANALYSIS TECHNIQUES TO REINFORCED MASONRY WALLS IN NUCLEAR POWER PLANTS
. Prepared by Harry G. Harris (1)
Ahmad A. Hamid (1)
Vu Con (2)
,/ August 1984 _
emo17o139xA w
(1) Department of Civil Engineering, Drexel University, Philadelphia, Pennsylvania (2) Nuclear Engineering Department, Franklin Research Center, Philadelphia, Pennsylvania
l L.
L t .
INTRODUCTION In response to IE Bulletin 80-11, a total of 10 -nuclear power plants have indicated. that the energy balance technique has been employed to qualify some reinforced masonry walls in out-of-plane bending. Based on the releview of submittals provided by the licensees and all available literature, the Franklin Research i
Center (FRC) staff and FRC consultants have concluded that. the available data in the literature is not sufficient to warrant the use of nonlinear analysis techniques to predict the response of masonry walls under cyclic, fully reversed dynamic loading. As a result, a meeting with representatives of the affected plants was held at the NRC on November 3, 1982 so that the NRC, FRC staff and FRC consultants could explain their concern regarding the applicability of the energy balance technique to masonry walls in i
nuclear power plants C13. In a subsequent meeting on January 20, 1983, consultants of utility companies presented their rebuttals C23 and requested that they should be treated on a plant-by-plant basis. In accordance with their requests, the NRC staff started the process of evaluating each plant on an individual basis. In this process, the NRC, FRC staff and consultants visited a few
, nuclear power plants to examine the field conditions of reinforced masonry walls in the plants and to gain first-hand knowledge of. how the energy balance technique is applied to 4
actual walls. Key calculations were reviewed with regard to the energy balance technique.
I
EVALUATION OF ENERGY BALANCE ' TECHNIQUE Based ' on 'a review of the submittals provided by the licensees, specific plant visits, evaluation of typical design
. computations and ' review of all available literature, it is concluded that the concerns ' raised by the Franklin Research Center (FRC) staff and consultants pertaining to the use of energy balance technique have not been resolved. A summary of these concerns are listed below:
- 1. Only a few isolated tests have been reported on the lateral resistance of reinforced concrete block and brick masonry walls in out-of-plane bending. Th*se tests can be summarized as follows:
(i) Tests have been conducted on 20' high reinforced concrete block walls B" thick in running bond and stack bond configurations by Dickey and Mackintosh C33. These tests, although limited, reveal ed that, under monotonically increasing load, some of the panels failed in a brittle mode prior to reaching yield and that the
- stack bond was less eff ective than the running bond.
(ii) More recent tests conducted by the ACI-SEASC Task
- Committee on Slender Walls C43 on f ace loaded 24' high reinforced masonry walls under monotonically increasing load showed relatively low ductility ratios in the 3 panels that attained failure. Two 6" nominal fully
, grouted concrete masonry walls attained ductility ratios of approximately 2 when they failed inadvertently in compression. One 6" hollow brick wall tested to failure also attained a ductility ratio of approximately 2. It has been noted that walls tested were fully grouted and have high steel percentages (0.22% to 0.37%).
(iii) ,
Tests conducted by Scrivener E5,63 on face loaded reinforced masonry walls made of 4 1/4" reinforcing brick revealed high ductilities. The one cyclical 11y loaded panel whose load-deflection results are reported C53 revealed very peculiar hysteretic behavior unlike the
! required elasto-plastic behavior needed for applicatiLn of the energy balance technique.
(iv) Tests on small masonry structures resulting f rom an assembly of various components to form single story masonry homes have been carried out at the UC, Berkeley -
2
_ _ . . _ _ _ _ _. _.~ . _ . _ _ _ _ _ _ _ _ . __
d -
e *
~
earthquake simulator C73-C93. The main objective was to
. provide design recommendations on the minimum reinfcrcement rdquired for masonry housing in seinmic
, zone 2. These are the' only tests of reinf orced masonry walls under realisite earthquake loads. The reinforced walls tested under out-of-plane bending in this program did not yield under the applied ._ loads. In addition, these walls did not have the boundary conditions of typical applications 'of masonry walls in nuclear power plants.
(v) Dynamic tests on slender reinforced block masonry walls have 'been conducted at the .EERC, University of California, Berkeley f or Bechtel Power Corporation. The program has been conducted to demonstrate the conservatism of the nonlinear dynamic analysis performed by Computech Engineering Services for the masonry walls
~
in the San Onofre Nuclear Generating Station,- Unit 1 (SONGS-1). The FRC staff and consultants witnessed one of the tests. It was shown that the wall was- capable of resisting significant inelastic deformations when subjected to earthquake input motion. It has to be mentioned, however, that the few tests performed were plant specific and aimed at verifying the conservatism of the nonlinear dynamic analysis' technique developed by Cosgsutech Engineering Services. Consequently, the parameters included in the program were limited to "as built" condition of the walls in SONGS-1. The program -
1 objective was not to verify the use of the energy baladhe technique.
The above tests that have been conducted,on reinforced masonry walls and which are relevant to the evaluation of concrete masonry walls in nuclear power plants do not form a sufficient data base to warrant the use of the energy balance technique.
- 2. A Technical Coordinating Committee for Masonry Research (TCCMAR) has been formed under the auspises of the US-Japan Cooperative Research. Program. It is a recognition of the urgent need for research in the area of seismic resistance of masenry.
The committee met in Pasadena in February 1984 to assess the current state of knowledge and to outline an experimental program to provide the necessary data. It has been concluded that the current state-of-the-art of masonry has not progressed enough to .
3
warrant inelastic analysis methodology of masonry structures
[113. A comprehensive test program was recommended. This significant undertaking is a clear indication of the lack of test .
data available for masonry. (Note: Dr. Hamid serves as a member of TCCMAR.)
large number of variables exist in the construction of
- 3. A c'oncrete block walls used in nuclear power plants. F'or example, the walls can be fully grouted, partially grouted, stack bond, running bond, single and multiple wythem with diff erent block sizes ranging from 4" to 12" in width. No adequate test data
! exist in the literature to enable a clear understanding of the effects of these variables on the dynamic fully reversed cyclic behavior of masonry walls.
- 4. Effects of cut-outs and eccentric loads due to attachments on reinforced concrete masonry walls of the type used in nuclear power plants have not been evaluated experimentally. This type of information, when available, will help to substantiate the I various assumptions made in the analysis of such safety related walls.
limited tests that have been conducted and summarized in
- 5. The item 1 above have pointed out to the inability to preclude brittle type failures with low ductility ratios on face loaded panels under monotonically in. creasing load. A lack of knowledge exists on the manimum attaiaable compressive strains in the face l
shell ,of reinforced concrete masonry walls under out-of-plane i bending. This is particularly true under cyclic dynamic loading. -;
4
~ .
- 6. In examining the available test data,.it is also obvious that there is a significant lack of information about the post-yield 4
envelope and established cyclic load characteristics for reinforced concrete masonry dealls under out-of-plane bending which is essential to demonstrate the stable ductile behavior- "l 2
required for the applicability of the energy balance technique.
This is attributed to the fact that most tests were not conducted to ultimate failure which is essential for the determination of i
the post yield envelope. This deficiency exists for all of the types of masonry construction used in nuclear power plants C103.
j 7. Some walls are qualified based on one-way bending in the horizontal direction or two-way plate action. These walls are t
horizontally reinforced with joint reinforcement embedded in the mortar joints every course or every other course. This type of steel is a high tensile steel with a yi, eld stress as high as I
100,000 psi indicating a very limited ductility. Masonry codes are not specific about the usefullness of joint reinforcement, particularly in seismic areas C12,133. If joint reinforcement is l to be used to resist tensile stresses, the WSD method should be employed with an allowable steel stress limited to 30,000 psi.
The only code C143 that addresses the use of joint reinforcement
} in seismic areas for categoriees C and D structures was developed by the Applied Technology Council. This code does not allow the f use of joint reinforcement as a load carrying element for these I two categories.. Safety-related masonry walls in nuclear power plants would fit into these categories. Information about the r
a 5
cyclic behavior of joint ' reinforced masonry walls is not available in the casonry literature at the present time E12,133.
i
- 8. The energy balance technique has been originally developed as l an approximate design tool to check the resistance of ductile concrete and steel frame buildings subjected to seismic loads.
With the fast development in computers in recent years, riore rigorous nonlinear dynamic analyses of ductile structures have also been made possible.
NONLINEAR ANALYSIS OF MASONRY WALLS Under seismic loads, strain energy transfer through elastic reponse is very small compared to the inelastic response for energy dissipation._ With regard to inelastic behavior, two
~
methods have been' used to investigate the dynamic response of concrete and steel structures to a~ strong motion earthquake. One of the methods requires the formulation of an inelastic model of the structure utili=ing the finite element technique. The model is then subjected to time-history ground motion and the dynamic response is determined. The results of this approach, which is time consuming and costly, depends on how accurately the structure is represented by the inelasctic model and how well the material properties are defined. Therefore, a limited
/
confirmatory dynamic test program should be conducted to check the conservatism of the assumptions used. ;
The other method, which is easier to apply in a design l
office, separates the properties of the structure from those of l
the earthquake. The earthquake is represented by a response 4
f 6
i l
.. J;,
spectrum which is then modified to accomodate the inelastic or ductile response of the wall C153. This method which relies on the energy balance technique requires information about ductility and energy .absorbtion capability of masonry wall's which, as !
discussed previously, have not been demonstrated experimentally i I
for general applications. .A ductility factor of 1 or 1.5 is suggested C163 for damage-level earthquake intensities where as ductilities of 2 to 3 is recommended C163 for use with collapse-level response spectra. Because the energy balance technique is an approximate simplified method, an adequate and more 4
comprehensive data base should be generated to check this design methodology.
TEST PROGRAM RELATED TO ENERGY DALANCE TECHNIQUE' If a confirmatory test program is elected to justify the use of the energy balan'ce technique, it is expected that the test
! panels should represent the actual configuration, construction details and boundary conditions of masonry walls in nuclear power I
plants.
The test program should cover the different parameters that I
would affect wall performance such as steel percentage, bond i
type, partial grouting and block si=e.
The test objectives should be centered upon the following:
- 1. To demonstrate that the masonry walls would maintain their structural and functional integrity when subjected to SSE and other applied loads.
i 2. To demonstrate that a stable ductile behavior characterized by steel yielding is guaranteed and that any .
7
. . , . - e.-
brittle failure (e.g. crushing) is precluded.
- 3. To develop necessary information ,to veri.fy the energy balance technique as a methodology for the qualification of reinforced masonry walls in nuclear power plants.
- 4. To demonstrate that adequate margins of safety exist for ,
walls subjected to design lateral loads.
f
SUMMARY
, CONCLUSIONS AND RECOMMENDATIONS A review and evaluation of the available information on the nonlinear behavior of block masonry walls under out-of-plane I
loading has been presented. It is concluded that test data are needed to substantiate the use of nonlinear analysis techniques l to qualify reinforced block walls in nuclear power plants.
l To qualify masonry walls based on nonlinear analysis, two alternatives are recommended:
1- Develop rigorous nonlinear time-history analysis techniques capable of capturing the mechanism of the walls under cyclic loads. Different stages of behavior should be accurately modeled: elastic uncracked, elastic cracked and s
'- with yielding of the central inelastic cracked rebars.
Then, a limited number of dynamic tests (realistic design i
earthquake motion inputs at top and bottom of the wall) i should be conducted to demonstrate the overall conservatism of the analysis results. In this case, "as built" walls should be constructed to duplicate the construction details of a specific plant.
2- Conduct a comprehensive test program to establish the -
8 ,
l basic nonlinear behavioral characteristics of masonry walls
~
- (i e. Ioad-deflection hysteretic behavior, ductility ration, energy absorbtion and post yield envelopes) for material properties and construct, ion details pertaining to masonry walls in question . The behavior revealed from the tests should then be compared with that of elastic-perfectly-plastic materials for which the energy balance. technique was originally developed. If there are significant differences, then the energy balance technique should be~ modified to reflect the actual wall behavior.
e 1
e e.
e l
1 l
l
)
es e
l
l . .-
l
,.*l,.
. REFERENCES
- 1. Hamid, A.A. and Harris, H.G., " Applicability of Energy Balance Technique to Reinforced Masonry Walls," Franklin Research Center, Philadelphia, PA, June 1982.
- 2. _ " Rebuttal to Applicability of Energy Balance Technique ;to
' Reinforced Masonry Walls," URS/ John A. Blume Associates and Bechtel Power Corporation,-January 1983.
- 3. Dickey, W.L. and Mackintosh, A., "Results of Variation of "b" or Effective Width in Flexeral Concrete Block Panels," Masonry Institute of America, LA, 1971. t
- 4. Annonymous, " Test Report on Slender Walls," Report'of the Task
, Committee on Slender Walls, Edited by J.W. Athey, ACI, Southern California Chapter, and the Structural Engineers Association 'of Southern California, Feb. 1980-Sept. 1982, Los Angeles, CA.
- 5. Scrivener, J., " Reinforced Masonry - Seismic Behavior and Design," Bulletin 'gf Ngw Zealand Eggiety _
igt Earthoggkg gnaineering, Vol. 5, No. 5, Dec. 1972.
- 6. Scrivener, J., " Face Load Tests on Reinforced Hollow Brick Non-Load-Bearing Walls," h 'ealand Enginggring Journal, July 1969.
- 7. Clough, R., Mayes,.R. and Gulkan, P., " Shaking Table Study of I Single Story Masonry Houses, Volume 3: Summary, Conclusions and Recommendations," Earthquake Engineering Research Center, Report No. UCB/EERC-79/23, College of Engineering, University of California, Berkeley, CA, September 1979..
- 8. Gulkan, P., Mayes, R. and Clough, R. " Shaking Table Study of
. Single Story Masonry Houses, Vol. 2: Test Structures 3 and 4,"
Earthquake Engineering Research Center, Report No. UCB/EERC-79/24, College of Engineering, University of California, Berkeley, CA, September, 1979.
i i 9. Manos, G., Clough, R. and Mayes, R., " Shaking Table Study of
- Single Story Masonry Houses- Dynamic Performance under Three Component Seismic Input and Recommendations," Report No. UCEERC-83/11, Univ. of Calif., Berkeley, July 1983.
- 10. Hamid, A.A., Harris, H.G., Con, V.N. and Chokshi, N.C.,
" Performance of Block Masonry Walls in Nuclear Power Plants,"
Progggdings gi the Third Canadian Masonry gymgosium, Alberta. :
Canada, June 1983, pp. 12-1 to 12-9.
! 11. Hamid, A.A. and Harris, H.G., " State-of-the-Art Report:
l Ncnlinear Behavior of Reinforced Masonry Walls under Out-of-Plane Lateral Loading," Proceedings of the International Symposium on Reinforced and Prestressed Masonry, Edinburgh, Scotland, August 1984.
10,
~
o~e I
- 12. Hamid, A. A., Harris, H. G., and Becica, I. J., "The Use of ;
. Joint Reinforceent In Block Masonry Walls," Franklin Research ,
Center, Philadelphia, March 1983.
- 13. Harris, H.8., Hamid, A.A., Becica, I.J., Con, V.N., and Chokshi, N.C., "The Use of Joint Reinforcement in Qualifying Masonry . Walls in Nuclear Power Plants," . Presented at the ASCE Special.ty Conference on St/uctural Engineering in Nuclear Facilities, Sept. 10-12, 1984, NC State University, Raleigh, North Carolina.
- 14. Applied Technology Council, " Tentative Provisions for a Development of Seismic Regulations for Buildings," ATC 3-06, (NSF Publication 78-8, NBS Special Publication 510), U.S. Government Printing Office, June 1978.
- 15. Englekirk, R.E., Hart, S.C. and the CMA of California and Nevada, Earthggght Qggign gf Ggngrete tigggety Buildinas._- V_giz 1 BESE901R Snectra Gnalysis and gangtg1 Entibggghg t!gdeling C9011ggrations, Prentice-Hall, Inc., Englewood Cliffs, N.J.,
1982.
- 16. Englekirk, R.E., Hart, S.C. and the CMA of California and Nevada, Earthagekn Desian el Concrete Masonry Buildinanz V_giz 2 Strenath Qest an gf Qne-to--Fout-gigty Egildings, Prentice-Hal1, Inc., Englewood Cliffs, N.J., 1984.
j t
l i
1 l
l 11
-___ .-. -.,_. _ _ _ _ _ _ . - - _ - _ _ _ , _ , _ . - - - - _ - - . . _ . _ . . -